ML20052E401
| ML20052E401 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/04/1982 |
| From: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8205110083 | |
| Download: ML20052E401 (2) | |
Text
_ _ _ _ _ _ _ _ - _ _ _ _ -
D
=
]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EdhhihididdB P. O. B O X 16 4 0. J A C K S O N, M i S S I S S I P P i 3 9 2 0 5_r-khp May 4,19825[
V NORRIS L. ST AMPLEY wumviu msoon y
- j gc Mr. Harold R. Denton, Director d,'
?
'l j Office of Nuclear Reactor Regulation 91 j'
U. S. Nuclear Regulatory Commission
/,\\ -
/g^/
%/yi>\\\\w.__A 'y Wa shington, DC 20555
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/L-860. 0 Requested Changes to Operating License Format AECM-82/202
Dear Mr. Denton:
As you know, the Grand Gulf Unit I will soon be ready for the issuance of an operating license. We have two requests for changes in the format for the license which are designed to simplify the procedure. The Commission has already used one of these changes in the La Salle case.
It, of course, relates to the issuance of the operating license for a period of 40 years from the date of issuance of the operating license itself. Our application now requests a 40-year license. We request that the same provisions for the term of license be used for Grand Gulf.
Our other request relates to power level. Currently the Commission has authorized only the initial issuance of a license for 5% of rated power. At such time as the Commissiocers has e completed their review of the application and the Staff analyses, a full power license is then issued.
In our view, it would save a great deal of unnecessary work if the condition in the license were written so as to permit full h g(
power operation automatically after the Commission had acted, We suggest language somewhat as follows:
s lo 8205110083 820504 PDR ADOCK 03000416 PDR A
Member Middle South utilities System
q
. x-y -
h,. ' %
. A i
MISSITIPPI POWER Q LlHHT COMPANY s;
s Mr. Harold R. Denton V
May 4,1982 U.S.NRC AECM-82 /202 N
" Mississippi Power & Light Company ("MP&L")
is authorized to operate the facility at reactor core power levels not in excess of 3833 MWt:
4
^
' provided, however, that it shall not operate the s
I Jfacility in excess of 5 percent of full power (191. 65 MWt) until the 'Ccmmissioners have conducted their review
'of the' application and authorized such full power operation. "
This change would. eliminate the need for a second licensing "p'ackage'Eand' Federal Registei notice as is followed under the current s
practice.
~
s It appears that the Commission may have contemplated this approach in its Policy Statement, " Commission Review Procedures for Powe,r Reactor Operating Licenses; Immediate Effectiveness t Rule, " '46 F. R. 47764, at 47765. As the Commission pointed out, this approach eliminates the need for preparing two separate license s
documents and has,no sub'stantive effect on the activities authorized.
We will appreciate any consideration given to these requests.
Sincerely, NLS:dp cc:
M r. G. B. Taylor M r.\\-R. B. McGehec
(
M r. T. B. C onne r
-s Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement s
..-U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. J. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement Region II 101 Marietta St., N, W., Suite 3100 Atlanta, GA 30303
\\ x 4
s 5. N.
I i
4 I
4 j, te