7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 77 to Facility Operating License No. DPR-32 and Amendment No. 78 to Facility Operating License No. DPR-37 issued to Virginia Electric and Power Company (the licensee), which. revised Technical Specifications for operation of the Surry Power Station, Unit Nos. I and 2, respectively, (the facilities), located in Surry County, Virginia. The amendments are effective as of the date of issuance.
These amendments revise the Technical Specifications related to the auxiliary feedwater systems. One change adds the requirement that at least one of the three auxiliary pumps be operable when the temperature and pressure of the opposite unit are greater than 350*F and 450 psig, respectively. The other change adds an action statement which requires at least three auxiliary pumps be restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Other changes include a requirement for a source of water for the one auxiliary feedwater pump of the opposite unit, flow tests for all of the auxiliary feedwater pumps, and valve exercise tests for the pump discharge valves.
The application for the amendments comply with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since these amendments l
do not involve r. significant hazards consideration.
i I
8205100044 820427 PDR ADOCK 05000200 p
7590-01 i,
The Commission has determined that the issuance of these amendments will not result in any significant enytronmental impact and that pursuant to 10 CFR 151.5(d}_(4)_ an environmental impact statement or negative declaration and environmental impact appratsal need not Be prepared in connection with issuance of these amendments.
For further details witfi respect to this action, see (.1) the applications for amendments dated December 28, 1979 and February 26, 1980, (2) Amendment Nos. 77 and 78 to License Nos. DPR-32 and DPR-37, and (.3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW.,
Washington, D. C. and at the Swem Library, College of William and Mary, Williamsburg, Virginia 23185. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.
20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this 27th day of April,1982.
FOR THE NyCL E REGULATORY COMMISSION i l f