Second Interim Significant Const Deficiency Rept 40 Re ITE-Gould Starter Coil Failure in Containment Cooling Fans. Final Rept Will Be Submitted 820531 Rather than 820430
ML20052D810
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/30/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0255, W3K-82-255, NUDOCS 8205070231
Download: ML20052D810 (1)


Text

I OUISIANA f 242 OuAnONOE Srnar POWE R & LiG H T/ P O BOX 0008

  • NEW ORLEANS LOUISIANA 70174 * (504) 366 2345 UIEOltb s*y"s'NI$

April 30, 1982 G D McLENDON Senior Vice President W3K-82-0255 Q-3-A35. 07. 4 0 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission t r-- -

]

.f ' l' 611 Ryan Plaza Drive, Suite 1000 f-Arlington, Texas 76012 i

$ fjg i l

SUBJECT:

Waterford SES Unit No. 3  %

  • Docket No. 50-382 743mtes Significant Construction Deficiency No. 40 Second Interim Report "ITE-Could Starter Coil Failure in Containment Cooling Fans"

Reference:

1) LP&L letter W3K-81-0412 to NP.C dated November 17, 1981
2) Telecon - L. L. Bass (LP6L) to B. Crossman (NRC) on 4/27/82

Dear Mr. Collins:

In reference 1, LP6L committed to provide a final report on SCD #40 by April 30, 1982. Since the first interim report was submitted, the remaining six coils have been received and are now scheduled for instal-lation during the first week of May.

Based on the above information, a final report will be submitted on or before May 31, 1982.

Very truly yours,

. N GDMcL/LLB/grf C A S  %

cc: 1) Director Office of Inspection & Enforcement NECEjVEQ -9 g

U. S. Nuclear Regulatory Commission -

Washington, D. C. 20555 T O IS8S !

S $

2) Director nog office of Management g 7' Information and Program Control U. S. Nuclear Regulatory Commission _

Washington, D. C. 20555

-E ecoso70231 G2043 I 9ff&

PDRADOCKOSOOOg, ,

S