I OUISIANA f 242 OuAnONOE Srnar POWE R & LiG H T/ P O BOX 0008
- NEW ORLEANS LOUISIANA 70174 * (504) 366 2345 UIEOltb s*y"s'NI$
April 30, 1982 G D McLENDON Senior Vice President W3K-82-0255 Q-3-A35. 07. 4 0
]
Mr. John T. Collins, Regional Administrator, Region IV
.f ' l' U. S. Nuclear Regulatory Commission t r-- -
f-611 Ryan Plaza Drive, Suite 1000 fjg l
Arlington, Texas 76012 i
i
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 743mtes Significant Construction Deficiency No. 40 Second Interim Report "ITE-Could Starter Coil Failure in Containment Cooling Fans"
Reference:
- 1) LP&L letter W3K-81-0412 to NP.C dated November 17, 1981
- 2) Telecon - L. L. Bass (LP6L) to B. Crossman (NRC) on 4/27/82
Dear Mr. Collins:
In reference 1, LP6L committed to provide a final report on SCD #40 by April 30, 1982.
Since the first interim report was submitted, the remaining six coils have been received and are now scheduled for instal-lation during the first week of May.
Based on the above information, a final report will be submitted on or before May 31, 1982.
Very truly yours, N
C A
GDMcL/LLB/grf S
cc:
1)
Director Office of Inspection & Enforcement NECEjVEQ
-9 U. S. Nuclear Regulatory Commission g
O IS8S !
Washington, D. C. 20555 T
S
- 2) Director nog office of Management g
7' Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
-E I
9ff&
ecoso70231 G2043 PDRADOCKOSOOOg, S