ML20052C957
| ML20052C957 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/28/1982 |
| From: | Will Smith INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20052C958 | List:
|
| References | |
| NUDOCS 8205060138 | |
| Download: ML20052C957 (1) | |
Text
r-e
(
t OKINDIANA & MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman. Michigan 49106 (616) 465-5901
- < j )<.,
..,.'y,-
April 28, 1982 Me
'g2. g0 Mr. J.G. Keppler, Regional Administrator
. :/C United States Nuclear Regulatory Commission
' ///
Region III x.(N 799 Roosevelt Road
'-j Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
Pursuant to the requirements of the Appendix A Technical Specifications, the following report /s are submitted:
R0 82-026/03L-0 R0 82-027/03L-0 Sincerely, (A)b :EuwQ W. G. Sm i t h, J r".2 Plant Manager
/bab cc:
J.E. Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry R0:III R.C. Callen MPSC G. Charnoff, Esq.
J.M. Hennigan W. Lavallee EPRI INP0 PNSRC J.F. Stietzel E.L. Townley Dir., IE (30 copies)
Dir., MIPC (3 copies) bR hgK0500031s 38 820428 h?S 0 zy 1961.
S s
g YDR
,f
,