ML20052C640
| ML20052C640 | |
| Person / Time | |
|---|---|
| Site: | 07000925, 07001193 |
| Issue date: | 04/23/1982 |
| From: | Creed J, Finley A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20052C625 | List: |
| References | |
| 70-0925-82-02, 70-1193-82-02, 70-1193-82-2, 70-925-82-2, NUDOCS 8205050321 | |
| Download: ML20052C640 (1) | |
Text
p a
+
U.S. NUCLEAR REGULATORY COMMISSION REGION III Reports No. 70-925/82-02(DETP); 70-1193/82-02(DETP)
Docket Nos.70-925; 70-1193 Licenses No. SNM-928; SNM-1174 Safeguards Group SNM 1174-I SNM 928-V Licensee: Kerr McGee Nuclear Corporation Kerr McGee Center Oklahoma City, OK 73102 Facility Name: Cimarron Facility Inspection At: Cimarron Facility, Crescent, OK Date of Last Material Control and Accounting Inspection:
January 26-29, 1981 Type of Inspection: Unannounced' Material Control and Physical Security dw V Yf'V Inspector:
<f A. G. Finley, Aufitor Date
/
Approved By:
N 3hY fJ. R. Crhed, Chief I
Date
" Safeguards Section Inspection Summary:
Insriction on April 4-8, 1982 (Reports No. 70-925/82-02(DETP); 70-1174/82-02 (DETP)
Areas Inspected: Routine, unannounced material control and accountability inspection including facility organization, facility operations, measurements, storage and internal controls, inventory, and records and reports.
Selected portions of the licensee's physical security program were also inspected including organization, training, guard qualification, physical barriers, detection aids, access controls, and key control. The inspection involved 28 inspection-hours onsite by one NRC inspector and was begun during regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the 13 areas examined during the inspection.
Report Details - Part 2.790(d) Information Addendum 1 - Part 2.790(d) Information 8205050321 820429 PDR ADOCK 07000925 C