ML20052C557

From kanterella
Jump to navigation Jump to search
Forwards Drafts of Alarm Response Procedures for Instruments & Electrical Equipment Associated W/Suppression Pool Leakage Return Sys,In Response to Request.Info Should Be Sufficient to Close SER Issue 39,emergency Procedures for Station
ML20052C557
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/30/1982
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SNRC-696, NUDOCS 8205050149
Download: ML20052C557 (6)


Text

e .. ,

..r, . s., , - -

LONG ISLAND LIGHTING COMPANY 5&M #w SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RfYER, N.Y.11792 April 30, 1982 SNRC-69 N

.\

s \

E C 6.-,.r i

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation tr 4W7y U.S. Nuclear Regulatory Commission

~ tM fps" Washington, D.C. 20555 0%$r[g*

/

Issue No. 39 - Emergency Procedures .

Shoreham Nuclear Power Station - Unit 1 "3 Docket No. 50-322

Reference:

(1) Letter SNRC-655 dated 1/7/82

Dear Mr. Denton:

x Supplement No. 1 to the Shoreham Nuclear Power Station SER, \

< Section 6.3.1, reflected LILCO's commitment to submit, for NRC review, operating procedures for the suppression pool leakage return system. This operating procedure, SP 23.702.04, was submitted via the Reference 1 letter.

Subsequent discussions with your staff (Mr. J. Wing) have indicated that the intent was to obtain a procedure which would delineate the alarms and corresponding operator actions associated with initiation of this system. It was agreed that Shcreham's Alarm Response Procedures associated with this system would be satisfactory.

To this end, attached herewith are drafts of four (4) alarm response procedures for instruments and electrical equipment as listed below:

1. *LIS-645A (Level Indicating Switch)
2. *LIS-642C
3. *LIS-645B
4. 74 or 49 Relay (time delay and thermal overload, respectively.

3ON r

/ /

8205050149 820430 PDR ADOCK 05000 2 E ,

April'30, 1982 SNRC-696 Page 2-The information submitted herein responds to the requests of

'your staff and should be sufficient to close this issue.

Should you have any questions, please contact this office.

Very truly yours, J. L. Smith Manager, Special Projects Shoreham Nuclear Power Station RWG:mp cc: J. liiggins All parties

"/ ~ . . -

S@ nitted:

ARP  :

(Window Number) .

Approvidy

_ 1Hil-'Pm.-PCM (Plant Manager) (Panel Number)

  • Effective Date . A/A-1

/ . -

_(Panel Syb-Section) .

Revision: A > ,

. RB FLOOD LEVEL HI Instr. No'. *LIS-545A *

  • Set Point: Trip > 0.5 in. above '[loor Reset (9.5 in, above floor

, POSSIBfE CAUSE DDEDLSTE ACTION 1.0 Excessive leak' age.from ECCS .

1.1 Initiate the Suppression Pool equipment and/or components. leakage return system per s SP23.792.04. ,

SUBSEQUn'T ACTION .

~

1.1 Continue to monitor RB Floor Drain Tank level changes and operate the Leakage Return System as necessary to maintain suppression pool inventory.

1.2 Uhen plant conditions permit, locate and isolate the source of leakage.

. . 1.3 Initiate a Maintenance Work Request, if required.

REFERENCES / #

. ., , . -SP23.702.04 - --

u--- _ ..

.-r :-

.. DRAFT 9

L..

. . .. e

~ . .

.Sbbmittad . .

.ARP Approved:

  • - (Windo# number)

' 1H11-P:.*L-PCM (Plant Manager) '(Pc.nel Number)

  • Effective Date A/A-3,

~

~,

Revision: A - (Panel Sub-Section) ,

, , SUPPR PdOL PUMP BACK RB FL CRN TK LEVEL HI

' Instr. No. *LIS-642C -

Set Point: Trip . >0.0 in, above su=p

. Reset <0.0 in. above sump POSSIBLE CAUSE IMMEDIATE ACTION .

(

1.0 Failure of RB Floor Drain Tank .

1.1 Determine cause of RB Floor

(' Sump Pumps Drain Tank Sump Pumps 2.0 Excessive leakage from ECCS 2.1 Place the Suppression Pool Leakage equipment and/or components. Return System in service per SP23.702.04.

SUBSEQUENT ACTION .

1.1 Initiate a Maintenance Work Request, if required. ~~-

2.1 Continue to monitor RB Floor Drain Tank Level changes to return Icakage to the Suppression Pool.

2.2 Attempt to locate and isolate the source of leakage when plant conditions permit

-securing ECCS systems. .

REFERENCES SP23.702.04 .

. i.

g"- ---. - . . 3 '.

~......~,..,.....J 1.

4 . *, g-I M -

'Subitted:- " ARP

, (Window Nun,ber) -

Approved: '

+ . *

,llill~PNL-PCM (Plant !Linager) (Panel Nutr.ber) - -

~

Effective. Data '

A/A-4 I ~

' Revision: * '

A (Panel Sttb-Section) . '

, , SUbPR POOL PlP.fP BACK SYSTDI TROUELE

. Instr. - No. 74 or 49 Relay - " '

Set Point: Trip 'Rc coergized '

. .. : a:

. ..w a n n ..n >.s, ,.. - a..a

?

Rcset Energized

.'. . , NSSIBLE CAUSE I}tiEDIATE ACTION

  • 1.0 Hogor- overload

SUBSEQUENT ACTION

~

1.1 Check pump power supp'ly at 1R24*MCC-111W/2AC to determine cause.

1.2- Initiato a Maintenance Work Roquest, if required.

', .b #

e

_ REFERENCES SP23.702.04 S

  • e e t

I

+

, g.. g m;....... .

e m A ** '

9 4

5 i:

$' k ,

_ ;t. . _ _ -

z-- - -. . .

ARP -

. '. $t 5mit ted:" ' '*

(Window Number) *

, - Approved:. 1H11-P::L-TCM (Plant Manager) ,(Panel number) -

' Effective Date . B/A-1 -

Revision:

  • (Panel $ttb-Section) -

-A - *

+

RB FLOOD LEVEL HI Instr. No.'*LIS-645B Set Point: Trip >0.5' int above floor Reset < 0.5 in, above floor

, POSSIBLE CAUSE D0fEDIATE ACTION 1.0 Excessive leakage'from ECCS . 1.1 Initiate the Suppression' Pool equipment and/or components Leakage Return System per g

SP23.702.Q4 SUBSEQUENT ACTION ,

1.1 Continue to monitor RB Floor Drain Tank Level Changes and operate the Leakage Return System as necessary to maintain Suppression Pool inventory.

~

)

1.2 When plant conditions pernit, locate and isolate the source of._ leakage.

1.3 Initiate a Maintenance Work Request, if requited .

f REFFRENCES SP23.7p2.p4 -