Forwards IE Insp Rept 50-274/82-01 on 820323-24.No Noncompliance Noted
ML20052C198
Person / Time
Site: U.S. Geological Survey
Issue date: 04/14/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Marranzino A
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
Shared Package
ML20052C199 List:
References
NUDOCS 8205040489
Download: ML20052C198 (2)


See also: IR 05000274/1982001

Text

_ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _

,a-

..

,

'

,

.-

.

E

Docket:

50-274/82-01

g4 APR 19

.

9 l i o>

U. S. Department of Interior

k

Geologic 11 Survey

sq

y

ATTN:

Mr. Albert P. Marranzino

J/

h

Deputy Regional Geologist

1

.

Reactor Administrator

y gg

, ,OS2 a [

Denver Federal Center

o

-

Denver,-CO 80225

d\\

V

...

'Q

'

4'(

Gentiemen:

This refers to the inspection conducted by Mr. M. W. Dickerson during the

period March 23-24, 1982, of activities authorized by NRC Operating License

No. R-133, and to the discussion of our. findings with Messrs. A. P. Marranzino

and D. H. Rusling at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the. inspector.

Within the scope of this inspection, no violations or deviations were

identified.

tin accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this offce by telephone within 10 days from the date of

L

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than 7 days are available for your review, please

notify this office promptly so that a new due date may be established.

Con-

sistent with section 2.790(b)(1), any such application must be accompanied

i

by an affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

t

.

{

TES

Tse h ,

1dV

RRI y

RPS-A4

RPBl k DR

P

DRA

l

MDickerson/ls TWesterman

GMadsen

JGa 1 ardo

illins

l

4/7/82

4/ /82

4/ /82

4/1 82

4 t(/82

4/p/82

l

7

- t

l

8

. L

01

.5

i

B205040409 820414

PDR ADOCK 05000274

G

PDR

f7

y~_

-,

e.

T'

--

.

U. S. Department of Interior

2

Jhd APR ?cs,

Geological Survey

of the reasons on the basis which it is claimed that the information should

be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

..cricirni Sanoi bA

7, p, n ;GT3.!Mi

G. L. Madsen, Chief

I

Reactor Project Branch 1

Enclosure:

Appendix - Inspection Report No. 50-274/82-01

bcc to DMB (IE01)

bcc distrib. by RIV:

BC

M. Dickerson

PM

T. Westerman

AE00

COLORADO STATE 'tPT. HEALTH

o

ELD

IE FILE

TPB

IE/RPRIB

RPB2

NRR/DHFS

INFO SYSTEMS

!.

NRR/0LB

J. Collins

RAD ASMT BR

RIV File

RESEARCH

PDR:HQ

LPDR

l

NSIC

NTIS

-