Advises That Amend Application Submitted 811103 Has Been Revised to Include Limiting Condition for Operation on Containment Purge Isolation Valves.Application Also Revised Re Frequency of Leakage Tests on Purge Isolation Valves
ML20052C052
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/29/1982
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML20052C053 List:
References
LIC-82-183, NUDOCS 8205040305
Download: ML20052C052 (2)


Text

,.

Omaha Public Power District 1623 HARNEY 8 OMAHA, NEBRA8MA 68102 m TELEPHONE S36-4000 AREA CODE 402 April 29, 1982 LIC-82-183 9 4!

R /

Mr. Robert A. Clark, Chief 4 O 4 U. S. Nuclear Regulatory Commission & C Office of Nuclear Reactor Regulation 2  ; . 88 Division of Licensing g < Co .

d Operating Reactors Branch No. 3 '

x ~

Washington, D.C. 20555 .7 2 4/

/" f n

9' *

Reference:

Docket No. 50-285 /

E 4

A/t

Dear Mr. Clark:

Subject:

Limiting Conditions for Operation on Containment Purge Isolation Valves The Commission's letter to Omaha Public Power District, dated February 24, 1982, asked the District to add a limiting condition for operation (LCO) to the Technical Specifications for the Fort Calhoun Station related to the containment purge isolation valves. In response to this request, we have revised our amendment application, previously submitted November 3, 1981, to include a LC0 on the containment purge isolation valves. Part of the LC0 recommended in your February 24, 1982 letter required power to the purge isolation valves be disabled. The District has not in-cluded this requirement, since it would remove valve position indication in the control room, as detailed in the discussion attached to the revised application.

The District has also revised the November 3,1981 application regarding the frequency of the leakage tests on the purge isolation valves. The Comission recommended testing on a six month interval and the District has revised this to require leak testing of the purge isolation valves following usage and prior to heating the plant up. Our justification for this change is detailed in the discussion on the attached appli-cation.

The District is still evaluating the possibility of installing an eight inch mini-purge system. However, we believe the comitments made in the attached license amendment application are adequate for closing out the Commission's concerns regarding conformance to the Standard Review Plan,

[63Y s 820504o3of '/

.. Mr. Robert A. Clark LIC-82-183 Page Two Section 6.2.4, and Branch Technical Position CSB 6-4, Revision 1.

Accordingly, the District' considers this issue closed. If, as a result of our evaluation, we determine a need for an eight inch mini-purge system, we will submit our designs and justification at that time.

Sincer'Ely, y L00 W. C. 00nes Divisi n Manager Produ ion Operations Attachments cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C. 20036