ML20052B841

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 700-1, Emergency Phone List. Procedure Change Request Form Encl
ML20052B841
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/12/1982
From: Pliml G
COMMONWEALTH EDISON CO.
To: Harold Denton
NRC
Shared Package
ML20052B840 List:
References
A-82-38, NUDOCS 8205040037
Download: ML20052B841 (2)


Text

'v L (,,.. g~ ' g? ??:'3 ~,

-., hi& %r$Ve:$;& Q &J@& N y:Q);f,g;% :[QQj',3'll?

CS2c)35

.Qg":%!y C Yn;::M y t.s...... a.v:

-

NOTIFICATION OF FROCEDURE CHANGE 95-vf Mr/Ms

/eM%

Bock #(s)

.To-5V

/'

Abncrmal Operatirg Prececures ACP Emergen.cy Operating Precedures ECP r

X EPIP - Emergency Plan Imclementing Precedures Fuel Handling Instructions FHI General Operating Prececures GCP Maintenance Instructions p-MI as Pericdic Test Procedures

'g PT Radiaticn Protection Procedures

\\\\

RP System Operating Instructicns

/

SOL

\\\\

Technical Staff Surveillances ED TSS Zicn Administrative Procedures ZAP I

APR 211982m.22 I

Zion Chemistry Prececures ZCP Zicn Electrical Distributien mar"um %,

ZED mars %

ANNUNCIATGR RESFONSE MANUA'.

ig CLRVE SOCK

\\

f FSAR - Final Safety Analysis Reccrt W

ZION TECH SPECS - Technical Specificatiens q

_ Filing Instructions:

  • Please revise per attached changes to EPIP 700-1, pgs.

1, 3 thru 15.

Rev. O, 1, 2, 3.

EPIP Index, pg. 2 April 12, 1982 Please acknowledge receipt of the above listed procedure (s), instructien(s) c revision (s) by returning this receipt letter to L. Minejevs, Zicn Station.

Date Signed l

~

l

/

p0[

G.' Pliml Asst Superinteneent Zicn Station gg FCR CFFICE USE ONLY Recetot Audit:Cate Of Audit Receicts Not Received Receicts Recuested l

l l

O T O lS O A 7 plQ Q"AMi9

- - -- : n

=

H Le G %,\\

vavuun 1

tv -

All procecure(s), instruction (s) or revision (s) listed were distributed l

in accorcance with the Zicn Distributien List.

en l

l 8205040 031.

w w

),'

,12,m

~

ZAP 5 514 R*o g STATION PROCEDURE CHANGE REQUEST O'/84 CHANGE Procedure intent changes require Station Review before using.

REQUES7 Procedure changes with prior Station Review do not need SRO approyal.

, g 8p

//

e NUMBER 7C /

4 St/A h Id PROCEDURE TITLE Temporary Change C

Permanent Change Y

New Procedure C

or Plant Condition Special Procedure C

Des; red Elfective Permanent Change Needed Date Yes Z No C i

1E8 W

// Md.

do /u Brief Description t _A U Pif 'Ju I U

!O Lwt

'dLA E

J d

/

OdLmJd es..o.,o,

.han,.

l-0/0 t

C M^ k 704 ate. n - els C%#}N/

Department R6 quested By z-

/

/

/

p c

Temporary Change Approval (No Intent change,14 days review)

Dept. Supervisor Date SRO Date FORM S 514 Station Review Copy

.