Summarizes 820415 Meeting W/Nrc to Appeal Staff Requirement for Addition of Third Automatic Feedwater Pump.Util Commits to Add Third nonsafety-grade Motor Driven Automatic Feedwater Pump as Plant Mod After Startup
ML20052B668
Person / Time
Site: Midland
Issue date: 04/27/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
16872, NUDOCS 8205030430
Download: ML20052B668 (3)


Text

.

9 Consuiners Power James W Cook O

f Vice President - Projects, Engineering and Construction oeneral offices: 1945 West Pernell Road, Jackson, MI 49201 e (517) 78&O453 April 27, 1982 N

o Harold R Denton, Director

\\

Office of Nuclear Reactor Regulation

[

Division of Licensing M C P Q..;

9 US Nuclear Regulatory Commission s

Washington, DC 20555 APROO1982p.

b, urennamu 9 MIDLAND PROJECT LuP. t.: a w

MIDLAND DCKET NOS 50-329, 50-330

[

/

3 AFW SYSTEM RELIABILITY

'b f N' '

FILE: 0926 SERIAL:

16872

Reference:

(a) J W Cook Letter to H R Denton, Serial 16008, Dated 3/1/82 (b) R L Tedesco Letter to J W Cook, March 26, 1982 CP Co met with the NRC Staff on April 15, 1982 to appeal the Staff requirement for the addition of a third AFW pump (Reference b) and to show that the new NRC guidelines for AFW system unavailability provided in the Standard Review Plan published July 1981 could be met with slight modifications to our existing two pump design (Reference a).

At the appeal meeting, the Staff indicated that a third pump was still necessary to reduce system unavail-ability and thereby provide an additional margin of safety.

CP Co has decided not to pursue the appeal process any further and, based on our understanding with the Staff, commits to add a third non-safety grade motor driven AFW pump to each Midland unit. The new full capacity pump will be powered from a IE bus, will be located in the turbine building and will have an automatic start feature.

It is understood that the Staff has agreed that the pump should be load shed on ECCAS and will be automatically sequenced onto the diesel generator fed IE bus on loss of offsite power, low level in both SG's, and no ECCAS.

In order to enable this new requirement to be carefully and properly engineered, constructed, and integrated with the existing system, the third pump will be installed as a plant modification project after startup and will be completed not later than the end of the second refueling outage for each unit.

820 50 3 0 VM s

/

/

oc0482-0893a131

N 2

As the detailed design progresses, information will be provided in the FSAR.

CP Co believes that, with the commitment made in this letter, the AFW third pump issue is resolved, t

/

JWC/ PEP /fas

/

l CC RJCook, Midland Resident Inspector RHernaia, US NRC OParr, US NCR 7

DBMiller, Midland (3)

RWHuston, Washington 4

i t

l

. 1 oc0482-0893a131 l.

p

...n.

y

..g

,v g..

-r--.-

-,--e--

p-,-

.. ~.

,.,-egr-.

l'

's CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 Letter Serial 16872 Dated April 27, 1982 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our resolution of the third AFW pump issue. We are committing to installing a

~

third pump by the second refueling outage.

CONSUMERS POWER COMPANY

//f d

By J pfCook7 Vice Pr'esident Project's, Engineering and Construction

/r Sworn and subscribed before me this 27 day of April, 1982.

Notary Public

~~~ J Jackson County, Michigan

-My Commission Expires september 8. lo84 h

I oc0482-0893b131

-