Requests That NRC Grant Extension for Completion of Mods to NUREG-0737,Item II.K.3.18 Re Automatic Depressurization Logic,Until First Refueling Outage
ML20052B516
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/26/1982
From: Tauber H
DETROIT EDISON CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.18, TASK-TM EF2-56-943, NUDOCS 8205030176
Download: ML20052B516 (2)


Text

_.

CD IG

~f g

Harry Tcuber rNnd Cestmcte

.g'4 4

rg p $,NoNN$ln"Eahs C2R3O T1

,,us,q April 26, 19 4

EF2 - 56,943 lu i \\

o' Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing U. S.-Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Tedesco:

References:

(1)

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2)

Letter from T. J. Dente (BWROG) to D. G. Eisenhut (NRS), " Schedule for BWR Owners Group Compliance with NUREG-0737, Item II.K.3 18, BWROG-8204, dated February 5, 1982.

Subject:

Schedule for Detroit Edison's Compliance with NUREG-0737 Item II.K.3 18,

" ADS-Logic Modification" Reference 2 provides the technical basis for a need to re-evaluate the ADS logic change proposed by the Owners Group in response to NUREG-0737, Item II.K.3 18.

GE and the BWR-Owners Group are in the process of identifying the optimum logic design modifications which would resolve the conflict between the operator action specified in the Emergency Procedure Guidelines and the requirement of NUREG-0737, Item II.K.3 18.

The Owners ~ Group resolution.of this issue is scheduled for completion by September 30, 1982 (Reference 2).

Following NRC review and approval of final design descriptions, individual utilities are to select one of these options and. proceed with the design-descrip-f tion and implementation for its plant.

[h)Y f

la view of these developments, Detroit Edison has put the ADS logic change modification (FSAR H.II.K.3 18)

/o

~

on hold.

840.5030176 x--

4

R. L. Tedesco April 26, 1982 EF2 - 56,943 Page 2 Detroit Edison is hereby requesting the NRC to grant an extension on completion of modifications to the ADS logic until the first refueling outage.

Sincerely, f

/

[6'Y$

cc:

L. L. Kintner B. Little

__