Text
7
.?
o APR 141982 Docket No. 99900053/82-01 s qq f q [,
d
/
- /
9-
'I h.9 Anchor Darling Valve Co.
- Ej 4 ' ;l 4 42
.t p
C ATTH: lir. J. W. Harlatt
~m General Manager Qs 3@
701 First Street 9?
6
/
Williamsport, PA 17701 6
to
/
w Gentlemen:
This refers to the inspection condected by Wm. D. Kelley of this office on February 23-26, 1982, of your (acility at Williamsport, Pennsylvania, and to the discussions of our findings with members of your staff at the conclusion of the inspection.
This inspection was made as a result of the issuance of:
(1) a construc-tion deficiency report by Mississippi Power and Light Company concerning the premature opening of torque switches on valves installed at the Grand Gulf Nuclear Plant as a result of excessive threads on valve stem protectors; and (2) a potential 10 CFR Part 21 report by Pennsylvania Power and Light Company concerning cavitation and/or difficulty in the throttling of certain valves installed in the Susquehanna Steam Electric Station.
Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to Licet URC requirements.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for 5
8205030155 t /
" ' * *.RI.V. @ h.... N......h..... 75d.....
_..."~mf.......
cumm) CI:R& CPS SC:R& CPS 3 :VPB D:EIS WK0T10y/vf 'IBayiss" """hFdt'@6V5"" 'EHJohn'50ff""
I;tQ11V5' "
""> U 5/82.........4/.3 182......... 41..182.......4D.W82........
4.//.f./E R........
nre ronu aia no,soi sacu ono OFFICIAL RECORD COPY
3 i
.r a
a:, e Anchor Darling Valve Co. withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than 7 days are
-available for your review, please notify this office promptly so that a i
new due date may be established. Consistentwithsection2.790(b)(1),any i
such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be swithheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-tion sot.ght to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
i 1
Sincerely, scrfat'pel signed tWE V. POTAPOVS" Uldis Potapovs, Chief Vendor Programs Branch
Enclosures:
1.
Appendix A - Inspection Report No. 99900053/82-01 2.
Appendix B - Inspection Data Sheets (5 pages) 3 bcc: