ML20052B472

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to License Change Application 26 Requesting Amend to License NPF-1,to Replace Pages Re Inservice Testing Program.Certificate of Svc Encl
ML20052B472
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/28/1982
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML20052B473 List:
References
RTR-NUREG-0452, RTR-NUREG-452 NUDOCS 8204300464
Download: ML20052B472 (3)


Text

.s w

e 6

as-.

Portland General ElectricCor iny REce VEo v

e APR3019SA 1

3r ag DonaldJ Broehl A%ctant Vce Presdent

/w.

April 28, 1982 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

License Change Application 26 (Rev. 2)

Inservice Testing Program Attached are three signed originals and 40 conformed copies of Revision 2 to License Change Application (LCA) 26 requesting amendment to Facility Operating License NPF-1.

Since the Inservice Inspection portion of LCA 26 has already been acted upon by the NRC in the form of Amendment 61 to Facility Operating License NPF-1, Revision 2 to LCA 26 includes only the Inservice Testing (IST) related changes. Please replace the appro-priate pages of Revision 0 and Revision 1 to LCA 26 with the attached.

The IST program in effect at the Trojan Nuclear Plant has been updated to meet the requirements of Section XI of the Winter 1980 Addenda (W80) to the 1980 Edition of the ASME Boiler and Pressure Vessel Code. Use of the Winter 80 Addenda has been approved by the Commission in 10 CFR 50.55a.

Relief requests for the IST program have been updated accordingly and are being transmitted to the NRC under separate cover.

Included within Revision 2 to LCA 26 are changes which supersede those proposed under LCA 74 (dated April 24, 1981) regarding testing of the rain steam isolation valves. As a result, PCE hereby withdraws LCA 74.

Please retain the license amendment fee submitted with LCA 74, as it will be used in a future license change application.

OM@

[og i

2 s m sm:1rertm10,,n072o4 L

i Portland General Electric Corrixwly l

Mr. Robert A. Clark April 28, 1982 Page two l

Included in the attachments is a signed copy of the Certificate of Service for Revision 2 to License Change Application 26 to the chief executive of 4

the county in which the facility is located and the Director of the State of Oregon Department of Energy.

Sincerely, l

g Attachments i,

l i

i i

i

(.

l l

l l

l

,9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l

In the Matter of

)

i

)

PORTLAND GENERAL ELECTRIC COMPANY, )

Docket 50-344 THE CITY OF EUGENE, OREGON, AND

)

Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY

)

)

(TROJAN NUCLEAR PLANT)

)

CERTIFICATE OF SERVICE I hereby certify that copies of Revision 2 to License Change Applica-tion 26 to the Operating License for Trojan Nuclear Plant, dated April 28, 1982 have been served on the following by hand delivery or by deposit in the United States mail, first class, this 28th day of April 1982.

Mr. Lynn Frank, Director State of Oregon Department of Energy Labor & Industries Bldg., Room 102 Salem, Oregon 97310 Mr. Robert M. Hunt Chairman of County Commissioners Columbia County Courthouse N

St. Helens, Oregon 97051

). Ah

~

D. R. Swanson, Licensing Branch Generation Licensing & Analysis Subscribed and sworn to before me this 28th day of April 1982.

OMyCommissio

/ uAo w

NotaryPublicofOr/gon c.e_n, /~ f /jI[8

/

i 1