ML20052B255

From kanterella
Jump to navigation Jump to search
Suppls Info Provided in 810127 & s Re long-term Improvement Program for Scram Discharge Vol Piping & Instrumentation.Supports for Seismic Considerations Will Be Installed Over Next Few Months
ML20052B255
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/20/1982
From: Heider L
VERMONT YANKEE NUCLEAR POWER CORP.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FVY-82-42, NUDOCS 8204300217
Download: ML20052B255 (1)


Text

VERMONT Y AN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET 2.C.2.1

((UTLAND, VERMONT 057O1 FVY 82-42 REPLY TO ENGINEERING OFFICE April 20, 1982 1671 WORCESTER ROAD FRAMINGH AM. M ASSACH USETTS 01701 TELEPHONE 017 872-8100 United States Nuclear Regulatory Commission Office of Inspection and Enforcement.

7 gj q

Region I NV

<<' r 631

'rk Avenue f

King or Prussia, Pennsylvania. 19406

~

Q Attention:

Office of Inspection and Enforcement

' h.

T:,s gy '

9 1

b, q.;ch,4/s Mr. Ronald C. Haynes, Director 1

dyfSM e$

a

References:

(a) License No. DPR-28 (Docket No. 50-271)

\\

(b) Letter, VYNPC to USNRC, FVY 81-14, dated Janu c

p\\,

(c) Letter, VYNPC to USNRC, FVY 82-4, dated January 1s152 (d) Letter, USNRC to VYNPC, Generic Safety Evaluation Report on BWR Scram System, dated December 9, 1981 Subj ec t: Design Modifications to Scram Discharge Volume Piping

Dear Sir:

This letter supplements information :provided in References (b) and (c) regarding the long term improvement program for the scram discharge volume piping and instrumentation at Vermont Yankee.

This plant modification is being designed in accordance with the criteria provided by the G. E. Owners Sub-Group and endorsed by the NRC in Reference (d).

In the course of analysis for this upgrade we have determined that attached piping to the new portion of the system will require additional support for seismic considerations. We plan to install these supports over the next few months, while the plant is operating. This action will facilitate completion of the entire scram system upgrade during the next refueling outage.

We will continue to keep you informed in this matter.

Very truly yours, VFRMONT YANKEE NUCLEAR POWER CORPORATION CYbW L. H. Heider

[

3,, 4 g7 I

Vice President lb o

c 8 2 0 4 3 0 o fL/ '7