ML20052A579

From kanterella
Jump to navigation Jump to search
Forwards Transmitting Recovery Operations Plan Change Request 11 in Conjunction W/Tech Spec Change Request 33 Deleting long-term B Steam Generator Cooling Sys
ML20052A579
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/15/1982
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To: Snyder B
Office of Nuclear Reactor Regulation
Shared Package
ML20052A580 List:
References
4400-82-1-0061, 4400-82-1-61, NUDOCS 8204280477
Download: ML20052A579 (1)


Text

"

i 9

f~

GPU Nuclear g

g{

P.O. Box 480 Middletown, Pennsylvania 17057 717-944-7621 Writer's Direct Dial Number April 15, 1982 4400-82-L-0061 ao Y

0)

TMI Program Office IIECElVEQ,

Attn:

Dr. B. J. Snyder, Program Director Sj Apgg7 7gg2b }t U. S. Nuclear Regulatory Commission g ggg g Yr summamme Washington, D.C.

20555 e

Dear Sir:

/

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Recovery Operations clan Change Request No. 11 Deletion of Long Term "B" Steam Generator Cooling System The purpose of this letter is to provide the NRC a copy of the subject document. As noted on the attached letter, this document was originally transmitted to the NRC on December 11, 1981 but based on recent discussions between TMI-2 Licensing and the NRC's TMI Program Office it apparently was never received by the NRC.

Technical Specification Change Request No. 33 which is referred to in the attached letter was approved by the NRC on April 1, 1982.

Since Ar ly, f

J. l on Ac irt Director, TMI-2 JJB:JJB:djb Attachment cc:

L. H. Barrett, Deputy Program Director, TMI Program Office f

DI O

8204280477

's' i GPU Nuclear is a part of the General Public Utilities System

- - -