Provides Commitment to Perform post-irradiation Surveillance Program for Fuel Bundles.Specifics Will Be Developed in Refueling Procedures
ML20052A419
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/21/1982
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8204280317
Download: ML20052A419 (1)


Text

' THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P o Box 5000 e CLEVEL AND. oHlo 44101 m TELEPHONE (216) 622-9800 m ILLUMINATING BLOG e 55 PUBLIC SoVARE Serving The Best Locv

% Nation g

Y Dalwyn R. Davidson v' ICE PRE SIDE NT Q

SYSTEM E NGINE ERtNG AND CONSTRUCTION 3

Mr. A. Schwencer g

P R 2 7 ;g g g ':

Chief, Licensing Branch No. 2 MD Division of Licensing nog q

U. S. Nuclear Regulatory Commission 9

Washington, D. C.

20555 g

Perry Nuclear Power Plant Docket Nos. 50-W O; 50-W 1 Response to Request for Additional Information -

Core Performance Branch

Dear Mr. Schwencer:

During recent conversations with members of the Core Performance Brta:ch and a review of SRP Section 4.2, we have identified a need for a commitmert to perform certain visual inspections of irradiated fuel bundles. The purpose of this letter is to provide a commitment to perform such a post irradiation surveillance program.

This surveillance program will be a routine fuel inspection program which will provide information on irradiated discharge fuel following each refueling. The program will involve visual examination of selected assemblies. Typically, visual examination will be made of five to ten percent of the discharged fuel, concentrating on the lead bundles. Visual examination will include, but not necessarily be limited to, crud buildup, rod bowing, and missing components. Additional fuel inspection will be performed, depending on the result of operational mon-itoring including coolant activity and the visual fuel inspection.

The specifics of this program will be developed in the Refueling Procedures of the Perry Plant Department.

Very Truly Yours, Ns0 W Dalwyn R. Davidson Vice President System Engineering and Construction DRD: mlb f