Monthly Operating Rept for Apr 1982
ML20051Q380
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/1982
From: Myrabo A
NORTHERN STATES POWER CO.
To:
Shared Package
ML20051Q122 List:
References
NUDOCS 8205170413
Download: ML20051Q380 (4)


Text

PAY 0 1982 OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 5-3-82____

COMPLETED BY A.

L.

Myrabo TELEPl10NE 612/295-5151 OPERATING STATUS INotes l

1. Unit Name

________________________Monticello l

l

2. Reporting period: ___________________ APRIL l

l 3.

Licensed Thermal Power (MWt)'

____________1670 l

l

4. Nameplate Rating (Gross MWe)'

_____________569 l

l S.

Design Electrical Rating (Net MWe)-

_____545.4 l

l

6. Maximum Dependable Capacity (Gross MWe). __553 l

l 7.

Maximum Dependable Capacity (Net MWe)-

____525 l__________________________l 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

__N/A_____________________________________________

9.

Power Level To Which Restricted, If Any (Net MWe):

___N/A___________________

10. Reasons For Restrictions, If Any:

__N/A_____________________________________

This Month Yr.-to-Date Cumulative ti. Hours In Reporting Period

_____719

_____2879

_.-__ 94968

12. Number Of Hours Reactor Was Critical

___626.7

___2437.0

__ 77372.6

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___599.7

___2359.4

__ 75569.1

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated (MWH)

_ 920071

_ 3760459

_123442801

17. Gross Electrical Energy Generated (MWH) __309615

__1266280

__39271657

18. Net Electrical Energy Generated (MWH)

__296831

__i216098

__37559317

19. Unit Service Factor

__ 03.4%

___ 82.0%

____ 79.6%

20. Unit Availability Factor

__ 83.4%

___ 82.0%

____ 79.6%

21. Unit Capacity Factor (Using MDC Net)

__ 78.6%

___ 00.5%

____ 75.3%

22. Unit Capacity Factor (Using DER Net)

__ 77.3%

___ 79.1%

____ 74.0%

23. Unit Forced Outage Rate

__ 11.8%

4.0%

6.1%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

__ September 4, 1982 - Refueling Outage - 42 days ________________________

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___N/A______
26. Units In Test Status (Prior to Commercial Operation)

N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

________________l COMMERCIAL OPERATION l

820517O@3

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT Monticello__

DATE 5-3-82____'\\

COMPLETED BY A. L. Myrabo l TELEPHONE 612/295-5151i MONTH ______ APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

__________535____________

17 93____________

2

__________543____________

18

__________420____________

3

__________472____________

19

__________514____________

4

__________541____________

20

__________498____________

5

__________541____________

21

__________524____________

6

__________534____________

22

__________517____________

7

__________534____________

23

__________514____________

8

__________353____________

24

__________513____________

9

-4____________

25

__________477____________

10

-4____________

26

__________525____________

11

-5____________

27

__________516____________

12

__________295____________

28

__________517____________

13

__________505____________

29

__________511____________

14

__________495____________

30

__________510____________

15

__________389____________

31 16 O____________

INSTRUCTIONS On this. format, List the average daily unit power level in MWe-Net for each l

day in the reporting month.

Compute to the nearest whole megawatt.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 5-3-82____

COMPLETED DY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ APRIL 4-1-82 to Power operation.

4-7-82 4-8-82 Reactor scram after loss of generator excitation and to load rejection.

Stuck safety / relief vatve and 4-11-82 maintenance extended this outage.

4-12-82 to Power operation.

4-14-82 4-15-82 to Scheduled outage to repair leaking safety / relief valve.

4-16-82 4-17-82 to Power operation 4-30-82 Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified surveillance testing.

Unit in end-of-cycle coastdown status.

I l

I L

  • J 50-263 UNIT SilUIDOhNS \\ND POWER REDUCTIONS DOCKET NO.

UNIT.N Of E Pbnticello DATE 5-3-82 APRIL COMPLETED By A. L. Mvrabo REPORT MONT!!

TELEPl{ONE 612/295-5151 l

=

5

=_

.w-o tw.ensee 5 w.,

g3 cause x corre ine g

y3g

\\"

d, o, -

7

_3 3 z Esent 7

eg Agnon to d3 jfg Report =

SL 5'

Present Recurrense i

4 4-8-82 F

80.0 A

3 N/A HA GENERA-X Reactor scram after loss of generator excitation due to field flashing cir-cuitry problems.

5 4-15-82 S

39.3 A

1 N/A CC VALVEX-B Scheduled orderly shutdom to repair leaking safety / relief valve.

i 2

3 4

F Forced Reason.

Method:

Ex!ubit G - Inst ructions S. Schedufed A-Equipraent Failure (Explatn) 141anual for Preparation of Data B41aintenance of Test 2-Man ual Seram-Entry Sheets for Licensee C Refueline 3 Autonu ie Ssrain-Event Repor: I LE R) File (N URLG-D-Regulattir> Restriction 4 Other (Explain) 01611 E-Operator Training & License Exanunation F-Administrati.e 5

G-Operational Error (Expla:n)

Exhibit 1 - Same Souree 19!77) it-Other i E xplain)