Text
a e'
YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 82-3 FOR THE MONTH OF MARCH,1982 8205140520 920412 DR ADOCK 05000 c
v OPERATING DATA REPORT 50-29 DOCKET NO.
DATE R20412 COMPLETED BY A E.Doyle TELEPHONE 617-872-8100-X2390 OPERATING STATUS Notes Yankee-Rowe
- 1. Unit Name:
March, 1982 Power level restricted by
- 2. Reporting Period:
600
- 3. Licensed Thermal Power (MWt):
g 185
- 4. Narr.episte Rating (Gross MWe):
plates in turbine.
175 S. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capseity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
150 MWe
' 9. Power Lese!To Which Restricted,1f Any (Net MWe):
See notes
- 10. Ressons For Restrictions.If Any:
This Month Yr..to.Date Cumulative 744.00 2,160.00
!!. Hours in Reporting Period 744.00_
2.160.00 149.091.15
- 12. Number Of Hours Resetor Was Critics!
0.00 0.00 0.00
- 13. Resetor Reserse Shutdown Hours 7AA nn.
2.160.00 144.640.50
- 14. Hours Generator On.I.ine 0.00 0.00 0.00
- 15. Unit Reserve Shutdown Hours 439.651.00 1.279.799.00 77.784.732.52
- 16. CrossTherms! Energy Generated (MWH)
_ 3,670,255.00 2
113.052.90_
330,551.30
- 17. Gross Electrics! Energy Generated (MWH) 104,998.03_
307,125.91 22,150,219.59
- 18. Net Electrical Energy Generated (MWH) 100.00.
100.00 77.17
- 19. Unit Service Factor 100.00.
100.00 77.17
- 20. Unit Availability Factor 80.64 81.25 69.58
- 21. Unit Capacity Factor (Using MDC Net) 80.64 81.25 69.58
- 22. Unit Capacity Factor (Using DER Net) 0.00 0.00 5.13
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.snd Duration of Esch!:
Core XVI thirteen-week Refueling / Maintenance Shutdown is scheduled to begin September 11, 1982.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achieved
- 26. Units in Test Status (Prior to Commereis! O erstion):
f INITIAL CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION
@/77)
I
v
=
~
AYER/.GE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee-Rowe DATE 820412 A.E. Do$ e COMPLETED BY TELEPHONE _617-872-8100-X2 39(
MONTH MARCH. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 3 143.9 142.8 37 2
143.9 33 142.7 3
143.4 39 142.8 4
143.I 20 142.0 5
142.5 21 82.3 142.5 6
22 139.8 7
142 8 23 143.5 8
143.0 24 143.4
~
9 143.5 25 143.3 10 143.6 26 143.5 11 143.7 27 143.5 12 143.5 28 143.4 13 143.3 29 143.5 14 143.1 30 143.4 IS 142.9 143.5 33 l
16 142.8 INSTRUCTIONS On this forrnat. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to the nearest whole inegawatt, (9/77)
-r
.e-
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT NAME Yankee-Rowe c
DATE 870412 REPORT AIONTil MARCil, 1982 COMPLETED BY A.E.
Doyle TELEPilONE 617-872-8100-x2390 i
43 c
ei c
.2 _r.
g
,.c X Licensec c%,
c%
Cause & Cussective No.
Daic
- g 3g g
,gg5 Event u3 03 Action lo c$ 5 5
jisg Report
- AO i
yU Prevent itecurrente t5 1
820321 S
0.0 B-4 N/A N/A N/A Power reduction of >20% for a 24-hour period resulted to allow completion of condenser water box tube cleaning and other preventative maintenance
- items, a
1 I
I 2
3 F: Foned Reason:
4 Methud:
Exhibis C Instructiinis S: Sclieduled A Einipment Failure (Emplain) 1 Manual
- 11. Maintenance of Test for Pacparation of Data 7 Manual Scrain.
Entry Sliccis fus Licensee C Rcfueling 3 Automatic Scram.
Eveni Repost (Liini File INUREG.
D Itegulaieny Resiriction 4-Other (Emplain) 0161)
E Opciator Training & License Examination F Ailminisisative G Ogmasiinial 1. :..:(limplain) 5 08/77)
Il Olhes (limplain)
Enhibit I Same Sonsec
m
, e' '
DOCKET NO.
50-29 UNIT Yankee-Rowe DATE 820412 COMP 1.ETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 REPORT NONTH MARCH, 1982 SU't!ARY OF OPERATING EXPERIENCES 3/21 At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> a load reduction was commenced to perform Non-Return Valve, Turbine Throttle Valve, and Turbine Control Valve exercises as well as cleaning Condenser West Water Box and Pump maintenance. At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> plant load had been reduced to approximately 80 MWe.
At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> all main-tenance items were completed, and an increase in plant load began.
3/22 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the plant was operating at fuli power.
=
0 M% G V
'~'
-w
_