ML20051B188

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1982
ML20051B188
Person / Time
Site: Humboldt Bay
Issue date: 04/05/1982
From: Derks P
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20051B180 List:
References
NUDOCS 8205140507
Download: ML20051B188 (4)


Text

O s

i MONTilLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of March 1982. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation.

There were no significant events associated with the operation of the Unit. There wac no significant maintenance completed during the month.

l l

l l

l I

l l

l l

8205140507 820405 DR ADOCK 05000

V O

\\.r OPERATING DATA REPORT DOCKET NO. 50 -/,13.

D ATE _4 92.

COMPLETED IlY _.fg5 Egg 4

TELEPHONE 79_7/dd3-7787 j

{I OPERATING STATUS W f YM*T

1. Unit Name.

UMOOLhT AY U

?

/>lMC/l

/ U 2 --

3. Reporting Period:

ZZO S f-3

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S f-

5. Design Electrical Rating (Net MWe):

df

6. Maximum Dependable Capacity (Gross MWe):

M

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report.Give Reasons:

MlA i

N

9. Power Lesel To which Restricted. lf Anv (Net MWe):

^//A

10. Reasons For Restrictions. lf Any:

i This Month Yr to Date Cumulative 7N 2M Idb

{

II. Ilours In Reporting Period O

O

. 98 /7/

12. Number Of flours Reactor Was Critical O

O O

]

13. Reactor Reserve Shutdown flours 97,252.

j O

O

14. Ilours Generator On-Line O

o O

15. Unit Reserve Shutdown flours

/I //8, 45~/

O O

16. Cross Thermal Energy Generated (MWil)

O O

_4,739.732__

17. Gross Electrical Energy Generated (MWil) 440

- 0 f7 4540. 6 9 ~1

18. Net Electrical Energy Generated (MWil) 59.4 */,

O O

19. Unit Service Factor
79. 4 */a O

O l

20. Unit Availability Factor
44. / */o O

O

21. Unit Capacity Factor (Using MDC Net) 4278/o O

O

22. Unit Capacity Factor IUsing DER Net)

/.7/7._

O O

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht: Al d l

i M MM'd T6

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achiesed

26. Units in Test Status (Prior o Commercial Operation):

INITIA L CRITICA LITY INIIIA L ELECTRICITY COMMERCIAL OPERATION l

(9/771 l

l L

~

DOCKET N O.

SO ~~ /3 3 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N ANIE N 3?P 23 DATE 5 - 92.

COMPLETED 11Y Af.BEgx5 REPORT MONTil n1Ar2cg TELEPIIONE ~7o7/443-2787 w.

E e

.! ?

}

$Yy Licensee E r, K

Cause & Corrective Avion to No.

Date g

3g

,855 Event g3 gl gE 5

35e Report a mo U

Prevent Recurrence H

o g

u O

74 -s 7 4 0 7 o 2.

S 744 C. #

/

N/A 5 ca smi c, g en,gic47, og s, 1

2 3

4 Method:

Exhibit G Instructions F: Forced Reason:

S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scra m.

Entry Sheets for Licensee 3-Automatic Scram.

Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4 Other (Explain) 0161)

E. Operator Training & License Examination 5

F Administrative Exhibit'l Same Source G Operational Error (Explain)

(9/77)

Il Other (Explain) e I

,. 7

Yl

~

ll AVER AGE D AILY UNIT POWEl( LEVEL f:

1 Y

DOCKET NO. /33 UNIT M8PP a3_

ri 4 'I-NZ DATE P.S DERKs

]

COMPLETED BY TELEPilONE 707-if 3 ~27d7 i

rd A AC H MON 111 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We-Net I (MWe-Net)

O O

i7 2

18 3

19 4

20 5

21 i

6 22 7

23 8

24 9

25 10 26 11 27 12 2S 13 29 14 30 15 31 v

Y 16 INSTRUCT 10'iS On this fermat.hst the average da!!y unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

P1177) 1

.