ML20050N497

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/82-08 & 50-251/82-08 on 820223-26.No Noncompliance Noted
ML20050N497
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/17/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20050N498 List:
References
NUDOCS 8204140364
Download: ML20050N497 (2)


See also: IR 05000250/1982008

Text

fdN"

.

.

.

e

r

ii

MAR 171982

os\\ A / o'/

'

F lorida Pon'er and Light Company

3-

,

gh

ATTN:

Dr. R. E. Uhrig, Vice President

d

,

.

Advanced Systems and Technology

i',

,c h n [;*2

97

0,

6'"

i

P. O. Box 529100

Miami, FL 33152

-

M,c; ., ' ll

h

~

.

Gentlemen:

C)

  1. b

[/

sb -

Subject: Report Nos. 50-250 /S2-OS, 50-251/82-0S

4' / UG \\'

N

This refers to the routine safety inspection conducted by Mr. J. J. Blake of this

cffice on February 23-26, 1992, of activit,ies authosized by NRC Operating License

Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our

findings held with Mr. H. E.

Yaeger, Site Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

nersonnel, and observations by the inspector

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Roon unless you notify this of fice, by

teiapnone, within ten days of the date of this letter and submit written

application to withhold infornation contained therein within thirty days of the

date of this letter. Such application must be consistent'with the requi rer en t s

of 2.790(b)(1).

Should you have any questions concerning this letter, ne will be glad to disct.ss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure (See Page 2)

8204140364 820317

PDR ADOCK 05000250

"""

fol.

~

-

-

.

.

..

._ __ __ .

- _ - -

-

A

,

.

_ - _ _

_;-__-

_

_ _ ,

. ,

. _ . .

_

_

_

.

.

.

Floriaa Power and Light Co.

2

MAR 171982

Enclosure:

Inspection Report Nos. 50-250/82-08,

50-251/82-08

cc w/ enc 1:

H. E. Yaeger, Site Manager

bcc w/ encl:

Occurent Management Branch

State of Florida

NRC Resident Inspector

~

.

.

. RU e

RII

R'

'

Ly-tb

,

/JJBlake:es

ARH_

t

KD andis

FaLong

3//0/82

3/%/82

3/ /82

3[//82

.

_ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -