OPERATING DATA REPORT J

DOCKET NO. 50-409 DATE 04-06-81

~

COMPLETED BY I S-GOODMAN TELEPilONE 60R 639-7331 OPERATING STATUS LA CROSSE BOILING WATER REACTOR Notes

1. Unit Name:
2. Reporting Period: 0001, 03-01-81, TO 2400, 03-31-81 165
3. Licensed Thermal Power (MWt):

65.3

4. Nameplate Rating (Gross MWe):

50

5. Design Electrical Rating (Net MWe):

50 e

6. Maximum Dependable Capacity (Gross MWe):

48

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. Power Lesel To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

AVCe 't ( Du crts g.kc,eyf-This Month Yr.-to.Date Cumulative 744 2,160 100.059 i1. Hours In Reporting Period 695.8 1,484.5 65,581.5

12. Number Of Hours Reactor War Critical 0

0 478 g odg.p 5

13. Reactor Reserve Shutdown flours p,k g

668.I 1.310.2 60,341.5

14. Ilours Generator On.Line
15. Unit Reserve Shutdown flours 1

0 0

79

16. Gross Thermal Energy Generated (MWH)

C92.649.63 175.314.7 8,259,652.1 2$.W l' 50.069 2,480,704

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 24.737 46,167 2,293,447
19. Unit Service Factor 89 8 60.7 60.3
20. Unit Availability Factor 89.e 60.7 60.4
21. Unit Capacity Factor (Using MDC Net) 69.1 44.5 47.8
22. Unit Capacity Factor (Using DER Net) 66.5 42.8 45.8
23. Unit Forced Outage Rate 10.2 6.7 7.1
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Eacht:

FUEL RECEIPT, MAY 15, 1981, 2 WEEKS NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l

26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8204130399 810409 PDR ADOCK 05000409 I"/ A R

PDR t

AVERAGE DAILY UNIT POWER LEVEL 50-409 DOCKET NO.

UNIT LACBWR DATE 04-06-81 CO%iPLETED BY L.S. GOODMAN 608-639-2331 TELEPl{ONE s10NT11 f1 ARCH 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (51We-Net)

(h!We-Net)

'e 39 38 i

37 2

39 is 38 3

39 39

,38 4

39 20 38 5

39 38 21 38 6

22 38 7

38 23 38 8

38 38 24 9

23 38 25 to 0

26 38 11 0

27 38-12 3

38 23 13 22 38 29 I4 32 38 3o 15 38 38 3:

16 36 ins 1 RUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

50-409 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N A%f E LACBWR DATE U4-U/-61 REPORT MONTil MARCH 1981 CO%fPLETED BY L. S. GOODMAN TELEPHONE 608-689-2331 3?

3 kY Licensec

,Eg Cause & Correctise o

No.

Date g

3g Q

jg5 Esent u7 93 Attiun to 3:

jgg Report =

(E U jU Prevent Recurrence H

6 81-05 81-03-09 F

75.4 G

3 81-04 EB CKTBRK 1B 2400-V0LT BUS WAS DE-ENERGIZED WHET, SWITCHING PLANT FEEDS FR0f1 RESERVE TO UNIT AUX. TRANSFORMER REACTOR SCRAMMEE 1B 480-VOLT EMERGENCY DIESEL GENERAT0F STARTED. RESERVE FEED BREAKER WAS RECLOSED.

OPERATOR TRAltlIflG CONDUCTEE FOR PROPER SWITCHING OPERATIONS.

81-06 81-03-16 F

0.6 H

4 NA HA MECFUN GENERATOR WAS TEMPORARILY REMOVED FR0f-THE DPC GRID AS A PRECAUTION DUE TO TURBINE GOVERNOR HYDRAULIC CONTROL SYSTEM RESPONSE PROBLEMS.

THE SYSTEM WAS MANUALLY EXERCISED.

THE REACTOR WAS NOT SHUTDOWN DURING THIS OUTAGE.

4 I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Inst ructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entr> Sheets for Licensee C Refueling 3-Automatic Scram.

Event Repor (1.ER) File (NitRI G-D Regulatory Restriction 4-Ot her ( Explain) 01611 E-Operator Training & License Examination F-Administratise 5

G-Operational Eiror ( Explain)

Exhibit 1 - Same Source (9/77)

Il Other (Explain)

I

n NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MARCH 1981 At thh onset of the March 1981 reporting period, power generation was at 85% Reactor Rated Thermal Power (39 MWe-Net).

This power level has been scheduled to extend the time period between refueling outages.

On March 9, at 1420, the reactor automatically shut down when the IB 2400-volt bus was de-energized when switching plant feeds from the reserve to unit auxiliary transformer.

The in 480-volt emergency diesel generator started and supplied the 1B 480-volt Diesel Building essential switchgear bus.

The reactor was returned a

to critical at 2331 on March 9.

At 0544 on March 10, with the reactor at 0.2% Rated Thermal Power, the reactor scramned due to high water level when the IB Reactor Feed Pump was being placed in i

service.

The reactor was returned to critical at 1948 on March 11, and the turbine-generator was synchronized to the DPC grid at 1743

  • on March 12.

Escalation continued until March 15 when 85% Reactor Rated Thermal Power was achieved.

At 1440 on March 16, the generator was temporarily removed from the DPC grid as a precaution due to turbine-governor hydraulic control system response problem which involved partial opening of the main steam bypass. valve.

The reactor was not shut down during this outage.

At 1513 on March 16, the turbine-generator was resynchronized to the DPC grid.

Power generation continued at 85% Reactor Rated Thermal Power (38 MWe-Net) throughout the remainder of the reporting period.

l Significant maintenance items performed during the March 1981 reporting period are indicated on the attached Instrument and Electrical Maintenance and Mechanical Maintenance listings.

I l.

MARCH 1981 IftSTRUMEf;T AND ELECTRICAL _MAINTEfiANCE 1 0F 3 LER OR flATURE Of OUTAGE MALFUNCTION EQUIPPEriT MAINTEriAf;CE fiUMBER CAUSE RESULT CORRECTIVE ACTION SECURITY SYSTEf1 D0OR HATCH CORRECTIVE MR-472 flA UNKf10WN CAUSIf1G ALARM TIGHTEf1E'D AND ADJUSTED SWITCH SLLURITY SYSTEM If4VERTER CORRECTIVE MR-476 flA DLFECTIVE CHOKE EXCESSIVE NOISE REPLACED CH0KE SLCURITY SYSTEM TRUCK CORRECTIVE f1R-475 ilA TRAilSillT BEFORE BLOWN FUSE REPLACED FUSE PADIO

'4ARMUD SECURITY SYSTEM VENT FAf1 CORRECTIVE MR-470 flA UNDERSIZED FAN R00t1 T00 HOT REPLACED WITH LARGER FAN INSTALLED

'it URITY SYS TEf1 CORRECTIVE MR-468 NA UNKNOWN CAUSING ALARMS REPLACED ZONE 8 ALARM CARD

It R0 WAVE 20-3

'lLURITY SYSTEM CORRECTIVE f1R-481 flA UtlKNOWN CAUSING ALARMS BALANCED ALARM BOARD MILRONAVE 20-4 L1LURITY SYSTEM E-FIELD CORRECTIVE f1R-490 flA UKNOWN CAUSING ALARMS BALANCED ALARM BOARD l'n-7

' f tURITY SYSTEf1 WASTE TREA~-CORRECTIVE f1R-492 NA UN KNOWil CAUSING ALARftS ADJUSTED ALARM BOARD C0ilTROL

  • 1ENT BLDG. ALARM 25-8 SLLURITY SYSTEM CHANGE CORRECTIVE MR-502 NA DEFECTIVE I.C.

INOPERATIVE REPLACED I.C. IN INTERFACE

  • m f1 BOARD 34 BOARD i

51LtlRITY SYSTEi1 EXPLOSIVE PREVENTIVE MR-509 NA TEST DUE COMPLETEU TESTS TESTED OPERATI0ft 0F UtilTS A*1D METAL DETECTOR

' ' ii URIlY SYSTUI CARD PREVENTIVE MR-520 NA UNKNOWN Ilt0 PERATIVE REPLACED CARD READER BOARD i:i ADLR 4/

'1

?

n

~

MARCH 1981 INSTRUMFNT AND ELECTRICAL MAINTENANCE 2 0F 3 LER OR NATURE OF OUTAGE

!eALFUNCTION EQUIPMENT MAINTENANCE fiUMBER CAUSE RESULT CORRECTIVE ACTION SAFETY SYSTEM CH. 1, 2 AND PREVENTIVE NA TEST DUE COMPLETED TESTS C01PLETLbTECH. SPEC.TESTFOR Hjo LEVEL SAFETY SYSTEM 1, 2 & WATER LEVEL #3 NUCLEAR INST. CH. N-5 PREVENTIVE NA TEST REQUEST C01PLETED TEST COMPLETED TECH. SPEC TEST FOR CH. N-5 NUCLEAR INST. CH. N-5 THRU PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED TECH. SPEC. TESTS N-9 N-5 THRU N-9

.ULLEAR IflSTR. RECORDER CORRECTIVE f1R-474 NA GEAR OUT OF MESH RECORDER NOT

' REALIGNED GEARS CH. 7-8 DRIVING RADI0 ACTIVE WASTE OFFGAS PREVENTIVE MR-506 NA CLEANING REQUEST -- CLEANED FLOW METER CLEANED FLOW METER FLOW METER PLUGGED FLOW DETECTOR 4UCLEAR INST. CH. N-5 CORRECTIVE MR-510 NA WIRING EP,ROR COULD NOT ADJUST REWIRED AGS MULTIPLIER ADJ. Pt MULTIPLIER BALANCE "Jutt. EAR IfiST. CH. N-8 CORRECTIVE MR-487 OUTAGE UNKNOWN INCORRECT ZERO SET RESET ZERO tHASSIS 81-05

1AIN STEAf1 BYPASS VALVE CORRECTIVE MR-486 0UTAGE REPAlR WORK ON IllCORRECT POSITI0fl RESET POSITION POT.

I m ! TION INDICATOR 81-05 VALVE AFFECTED INDICATOR OUTPUT iuRl11tlE VALVE POSITION CORRECTIVE MR-458 OUTAGE NORMAL USAGE POSITION DRIFT RESET POSITI0fl P0T.

INDICATOR 81-05 in W-CELL RECORDER CORRECTIVE !!R-464 OUTAGE fl0RMAL USAGE WORN SWITCH REPLACED SELECTOR SWITCH 81-05'

~

N

MARCH 1981 If1STRUMENT Afl0 ELECTRICAL MAINTENANCE 3 0F 3 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAlf4TENANCE ^

NUMBER CAUSE RESULT CORRECTIVE ACTION MAIN. STEAM BYPASS ACC PUMP CORRECTIVE MR-417 OUTAGE NORMAL USAGE INOPERATIVE LIGHT ADJUSTEbAUX.BREAKERCONTAC BREAKER SWITCH 81-05 CONTROL SWITCH 25NB-1 CORRECTIVE MR-425 0UTAGE NORMAL USAGE BACK SUPPORT LOOSE TIGHTENED SWITCH BACK SUPPORT.

81-05 lSAFETYSYSTEMFLOW1 CORRECTIVE MR-494 0UTAGE UflKNOWN CAUSING FLOW SPIKE REPLACED TRANSMITTER AMPLIFIE l TRANSMITTER 81-05 fluCLEAR IftST. CH N-8 &

CORRECTIVE MR-499 OUTAGE UNBALAtlCE READIflG LOW COMPLETED SYSTEM ADJUSTMENTS AGS SYSTEM 81-05 fluCLEAR INST. CH. N-7, PREVENTIVE OUTAGE TEST REQUEST COMPLETED TESTS C04PLETED AGS ADJUSTMENTS AfE/

j fi-8, & AGS 81-05 TESTS STEAM FLOW TO RECOMBINER CORRECTIVE MR-495 0UTAGE CALIBRATION DUE C04PLETED CALIBRA-CALIBRATED STEAM /RECOMBINER FLOW TRANSMITTER 81-05 TION TRANSMITTER l STREET &PARKIflGLOT CORRECTIVE MR-498 OUTAGE INCORRECT WIRING i BALANCE IN PHASE REBALANCED PHASE POWER I LIGHTING 81-05 POWER CONNECTIONS l

! CONTAINMENT VENT RESET FACILITY CHANGE

~

OUTAGE SWITCH COVER INSTALLED LOCK COMPLETED FC BY INSTALLING SWITCHES 37-80-3, MR-497 81-05 REQUESTED COVER COVER SEAL STEAM EXHAUST BLOWER CORRECTIVE MR-525 0UTAGE NORMAL USAGE WORN BEARIl1GS REPLACED BEARINGS IB 81-05 TCP 1A LOW FLOW SIGHT CORRECTIVE MR-517 0UTAGE EXCESSIVE FLOW ETCHING GLASS METER INSTALLED EP0XY PATCH GLASS 81-05 l

l

'2

MARCH 1981 11ECilANICAT F1AINTEtJA!!Cl:

1 0F 1 i,

LER OR l

NATURE OF OUTAGE MALFur_lCTION,

EQUIPMENT MAINTEilANCE fiUf'l'ER CAUSE RESULT CORRECTIVE ACTION JASTE WATER FLOL4 METER FC-54-80-2 NA NA NA ItlSTALLATION OF A NEW METER MR-0451 AND ASSOCIATED PIPING.

'MI POST-ACCIDENT SAMPLING FC-71-80-1 NA NA NA INSTALLATION OF NEW SYSTEM.

3YSTEM MR-0171 i Oh'ER CONTROL R0D DRIVE CORRECTIVE MR-419 OUTAGE USAGE SCRAM MOTOR SHAFT RENEWED SCRAM MOTOR SHAFT tRH1E F3, #11, AND #22 MR-432 81-05 SEAL LEAKED OIL SEAL.

MR-489 OfFGAS RECOMBINER CORRECTIVE MR-433 OUTAGE SUSPECT INTERNAL POSSIBLE CATALYST OPENED UtiIT FOR INSPECTION; 81-05 EXOTHERMIC REACTI0f-FAILURE AND DAMAGE FOUND NO DAMAGE.

NO REPAIRS NEEDED.

!A 0FFGAS DRYER CORRECTIVE MR-040 OUTAGE SERVICE VALVE LOSS OF FREON RENEWED SERVICE VALVE ON UNIT,

81-05 LEAKED CHARGE.

UNIT DISCHARGE LINE, RECHARGED UNIT FAILED TO COOL.

B SEAL INJECT PUMP CORRECTIVE MR-504 NA PLUNGER PACKING EXCESSIVE WATER REPACKED ALL THREE (3)

WORN OUT LEAKAGE PLUNGERS.

e IPE HANGER / RESTRAINTS FC-53-80-2 NA NA NA INSTALLATION OF NEW PIPE iPGRADING IN CONTAINMENT HANGERS / RESTRAINTS, LUILDING (VARIOUS) l A U1LRGENCY DIESEL PREVENTIVE MR-528 NA NA NA COMPLETED PREVENTIVE l

dNLRATOR MAINTENANCE ON UNIT.