Text
.
l.
OPERATLNG DATA REPORT DOCKET NO.
DATE I-b-64 COMPLETED BY G. Howlett TELEPilONE -(203) 447-1791 Ext. 4431 OPFR ATING STATUS Millstone 2 Notes Items 21 & 22
- 1. Unit Name:
December 1981 Cumulative, are computed
- 2. Reporting Period:
- 3. Licensed Thermal Power (MW ):
2700 using a weighted average.
4, Nameplate Rating (Gross MWe):
909 870
- 5. Design Electrical Rating (Net MWe):
- 6. Masimum Dependable Capacity (Gross MWe):
895
- 7. Masimum Dependable Capacity (Net MWe):
864
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
None a
- 9. Power Lesel To which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to Date Cumulatise
- 11. Hours In Reporting Period 744 8,760 52,752
- 12. Number Of Hours Reactor Was Critical 103 7,338__
38,587.3
- 13. Reactor Resene Shutdown flours 0
0 2,076.9
- 14. Hours Generator On-Line 101.5 7,232.5 37.001.5
- 15. Unit Resene Shutdown Hours 0
0 468.2
- 16. Gross Thermal Energy Generated (MWH) 267,821 19,180,626
'92.415.947
- 17. Gross Electrical Energy Generated (MWH) 86.910 6.328.580 30.001.497
- 18. Net Electrical Energy Generated (MWH) 80,500 6,091,721 28,753,767
- 19. Unit Senice Factor 13.6 82.6 70.1
- 20. Unit Asailability Factor 13.6 82.6 71.0
- 21. Unit Capacity Factor (Using MDC Net) 12.5 80.5 65.5
- 22. Unit Capacity Factor (Using DER Net) 12 4 79 9 64.4
- 23. Unit Forced Outage Rate 0
10.1 20.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
Currently refueling.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
February 28. 1982
- 26. Units in Test Status (Prior o Commercial Operationi:
Forecast Achiesed INITI A L CRITICALITY N/A N/A INITIA L ELECTRICITY N/A N/A COMMERCI AL OPER ATION N/A N/A 8
020413go 6
A\\ fi14GL D \\lLY LWil i OblR LEVEL DochET NO.
50-336 I
UNIT Millstone 2 DATE l-5-82 owlett CON!Pl.E TED BY TELEPHONE (203) 447-1791 X4431 December 1981 MON 1H DAY AVER AGE DAILYl'OWER LEVEL DAY AVER AGE DAILY T OWER LEVEL
(\\!We Net) nnte.yer) 845 0 (-4) j7 846 0 (-4) 2 33 844 0 (-4) 3 3,
0 (-4) 4 847 2a 21 0 (~4) 5 99 6
0
(-8) 0 (_4) 22 0
(-6) 0 (.3) 7 23 s
0
(-6) 24 0 (-2) 0
(-6) 25 0 (-5) 10, 0
(-6) 26 0 (-2) 0
(-6) 27 0 (-2).
11 0
(-6) 12 2s 0 (-4) 0 (-4) 4 13 0
(-5) 29 0
(-5) 14 3o 0 (-4) 0
(-4) 3, o (_4) 15 0
(-4) 16 1
INSTRUCTIONS On thh formn. list the nef are daily ur.i: p.m er inelin.\\ We Net for ea-h da3 in the itpu: tin;;-,.inth. C.,mp.:ic io
- he r.nien whole :T,epwatt.
(W 7 i
( -
=
w
Dock;t No.
50-336 Date 1/7/82 Unit flame Millstone 2 Completed By G. H. Howlett Telephone (203) 447-1791 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month DECENBER 1981 DATE SYSTEM' COMPONENT MAINTENAflCE ACTION 11/81 No major corrective maintenance was required during this time period.
O e
9 6
f 0
^
r Docket No.
50-336 Date:
1/7/82 Completed By: G.H. Howlett III
~
Telephone:
203/447-1971 X4417 REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Commenced refuel outage March 26, 1983.
3.
Schedule date for restart following refueling: May 14, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anti'cipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
5.
Scheduled date(s) for submitting licensing action and supporting information:
N/A I
l 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier,' unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
217 (b) 216 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.
____m._
0 UNITSHUTDOWNS AND POWER REDUCTIONS DOGETNO. -
-D UNIT NA?.lE FiliIStone 2 DATE 1-7-82 REPORT MONTil December 1981 COM 'LETED ;;y G. H. Howlett TELEPHONE (203) 447-1701 X4431
=
No.
Date 1
Q Cause & Corrective p
32 0
5me vent 9o Acta,n to
]V Prevent Recurrenec 3 i 72 j Report e in O C '~-
M 6
11 811205 S
642.5 C
1 N/A N/A T4/A Shutdown for refueling and maintenance.
i l
i
SUMMARY
- The. unit operated at o'r near 100% of rated thermal power through the 4th with the commencement of refueling outage on the 5th.
l 07/77)