_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
APPENDIX A NOTICE OF VIOLATION Omaha Public Power District Docket: 50-285 Fort Calhoun Station, Unit 1 License: DPR-40 Based on the results of an NRC inspection conducted during the period of February 22-26, 1982, and in accordance with the Interim Enforcement Policy 45 66754 (October 7,1980), the following violations were identified:
A.
Failure to Conduct Required Requalification Training for Operators and Senior Operators 10 CFR 55, Appendix A requires, in paragraph 2, that, "the requalification program shall include preplanned lectures on a regular and continuing basis throughout the license period in those areas where annual operator and senior operator written examinations indicate that emphasis in scope and depth of coverage is needed..
Additionally, 10 CFR 55, Appendix A, in paragraph 4, requires that, "... The requalification program shall include... written examinations which determine licensed operator's and senior operator's knowledge of subjects covered in the requalification program...." The approved training plan for Fort Calhoun Station requires, in paragraph I.1, that, "... individuals who score less than 80% in particular category (ies) will be required to attend the appropriate lectures." Also, paragraph I.2 of the approved training plan for Fort Calhoun Station requires that, " Periodic written quizzes will be given to all lecture study participants to evaluate their knowledge on topics covered by these lectures."
Contrary to the above, four individuals, who were licensed as operators or senior operators and who scored less than 80% in particular categories on the annual written examination given in the spring of 1981, were neither given requalification lectures in their respective areas of weakness nor were they given re-examinations in these areas.
This is a Severity Level V violation.
(Supplement I.E.) (820?-01)
B.
Failure to Follow Training Manual Requirements 10 CFR 50, Appendix B, Criterion V requires that, " Activities affecting quality shall be prescribed by' documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings,"
W204130349 820322 PDR ADOCK 05000285 G
r Contrary to this requirement, the following activities affecting safety were not carried out in accordance with the Fort Calhoun Nuclear Power Station (FCNPS) Training Manual (Revision 3 of December 10,1981).
1.
Section 8.2.2.2.c of the FCNPS Training Manual requires that, "each member of the fire brigade will maintain his preparedr.ess for fighting fires by participating in a drill at least every two years."
Contrary to this requirement, 18 members of the fire brigade (5 operators and 13 security guards) who began employment at the FCNPS prior to 1980 did not participate in a fire drill during the 2 year period ending December 31, 1981.
2.
Section 8.1.2.2.b of the FCNPS Training Manual requires that each fire brigade team member qualify by completion of fire brigade team training and that, " Qualification will be certified by the Training Department."
Contrary to this requirement, the NRC inspector found that certifi-cation of fire brigade team members was not being conducted.
This is a Severity Level IV violation.
(Supplement I.D.) (8202-02)
Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) the corrective steps which will be taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Consideration may be given to extending your response time for good cause shown.
/
^
W Dated:
March 22, 1982 s,
W. C. Seidle, Chief ReactorPrYjectBranch2 2