Miscellaneous Filings Re Visit to Control Room Simulator, ACRS Meeting on Plant & NRC Insp to Be Conducted in Apr. Related Correspondence
ML20050E292
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/05/1982
From: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
To:
Shared Package
ML20050E293 List:
References
NUDOCS 8204130208
Download: ML20050E292 (2)


Text

F

  • h

+'

  • M April 5, 1982

- - ~

UNITED STATES OF' AMERICA NUCLEAR REGULA! CRY COMMISSION Eefore the Atomic Safett shd-dic'edine Bo In the Mat er of

)

)

CLEVELAND E*ECTRIC ILLUMINATING

)

Docket Nos. 50-L'40 COMPANY, Et A1.

)

50-441

)

(Operating Licens (Perry Nuclear Power Plant,

)

o g

Units 1 and 2)

)

)

6' D CEiy7g OCHE MISCELLANEOUS FILINGS E-MR T

% ';g.f g D82k,

~g 9: ;.7 Eg~ ;q s

W,"

J I.

VISIT CC CONTROL ROOM SIMULATOR G%

N OCRIregretsthatitwasunabletosendadelegtEtNtTIS the March 5,1982 visit to the GE Control Room Simulator in Tulsa, Ok1Ehoma.

Unfortunately, economic factors precluded OCREIs attendance.

OCRE wculd be interested in obtaining any observations, reports, and/or findings made by the Board or NRC Staff during the simula: r visit.

While written accounts are obviously a poor substitute for personal observation, OCRE nonetneless is interer:ed in learning what occurred during the simulator demonstratien.

II. ACHS MIETING ON PERRY OCHE has sent the enclosed letter to the ACRS, expressing a desire te attend the forthec=ing meeting on the Perry Nuclear Power Plan:, tentatively to oe held in Cleveland. OCRE has requested : at the meeting be held in Cleveland, as this would 3

be more convenient to OCHE members and to the general public.

950 III.

NRC 2;SPECTION TEAM TO VISIT PERRY l

OCRE has learned, through the news media, that the NRC B204130208 820405 PDR ADOCK 05000440 0

PDR

--___n-2-

JP t

a intends to send a four-member inspection team to the Perry site sometime in April to investigate, among other things, the training of workers and in'spectors and the handling of non-conformance reports.

OCHE would like to know if any portions of this

)

inspection are open to the public; if so, OCRE would be interested in attending.

OCRE would appreciate it if the i

Applicant or NRC Staff could send a schedule of the inspection, with those portions open to the public clearly designated, i

to the undersigned.

If, for some reason, public attendance is not permitted (or if OCRE'is unable to attend), OCRE would like to receive a report of the inspection team's findings.

f Respectfully submitted, W W?

Susan L. Hiatt l

OCRE Interim Representative 8275 Munson Rd.

Mentor, OH 44060 (216) 255-3158 I