Northern States Power Company l
414 Nicollet Mall D. E. Giberts Minneapohs Minnesota 55401 Sener Vice President Telephone (612) 330-6071 Power supply March 25, 1982 i
Mr R L Spessard, Director Division of Project and Resident Programs Region III Office of Inspection and Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr Spessard:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 and 50-306 In response to your letter of February 24, 1982 which transmitted Inspection Reports 50-282/82-01 and 50-306/82-01, the following is offered:
Violation j
10 CFR 50, Appendix B, Criterion V, states in part: " Activities affecting quality
~
shall be prescribed by documented instructions, procedures, or drawings, or a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, and drawings." Northern States Power Company I
Operational Quality Assurance Plan, Revision 6, Section 18.2, states in part:
" Measures shall be established which assure that operating occurrences and events that could have a significant safety effect are investigated, reviewed, and re-l' ported as required by the Technical Specifications." Procedure SACD3.6 requires (Section 6.4.3) that a final investigative report be prepared and completed with-in 40 days and shall be reviewed within 60 days by the Operations Committee, t
Contrary to the above, as of the date of the inspection which was more than 60 days after the date of the event, Final Investigative Report for Licensee Event Report No. P-RO-81-23 had not been prepared and completed.
I This is a Severity Level VI violation (Supplement I).
Response
The Final Investigative Report for R0-81-23 has been completed. A system has been instituted which will remind investigators of reports that they have coming due.
This system is being tested now.
Full compliance will be achieved by June 1, 1982, I
i (Yours truly,
\\W i
(Y, W
D E Gilberts Senior Vice President Power Supply G Charnoff
~-
8204120446 820407 OM MAR 2 9 M
s UNITED STATES NUCLEAR REGULATORY COMMISSION NORTIIERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 Docket No. 50-306 LETTER DATED MARCH 25, 1982 RESPONDING TO NRC LETTER DATED FEBRUARY 24, 1982 INSPECTION REPORTS 50-282/82-01 and 50-306/82-01 Northern States Power Company, a Minnesota corporation, by this letter dated March 25, 1982 hereby submits, in response to the NRC letter dated February 24, 1982, our answer to Inspection Reports 50-282/82-01 and 50-306/82-01.
This request contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY M
By:
D E Gilber'ts~
Senior Vice President Power Supply 45Y
/Maaed 19 ((R, before me a notary any of On this public in and for said County, personally appeared D E Gilberts, Senior Vice President Power Supply, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, in-formation and belief, the statements made in it are true and that it is not interposed for delay.
G.
-/f w se l
BETTY J DEAN l
l
} vtaav pueuc.umcsota
,l RAMOEY COUNTY 9
' di Cvmmemon E.p,n s r. ( y eye r t
s e e,-.
.....