ML20050D958
| ML20050D958 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/05/1982 |
| From: | Lendom G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3K82-0202, W3K82-202, NUDOCS 8204120442 | |
| Download: ML20050D958 (1) | |
Text
LOUISIANA / 142 DR ARONDE STPUT POWE R & LiG H T/ P O GOX 6008
- NEW OALEANS LOUIS!ANA 70174 * [504) 366-2345
'$bSOEksOOtS$
u April 5,1982 G D. McLENDON Senior Vice President W3K82-0202 Q-3-A35.07 m
[
A 6
Mr. John T. Collins, Regional Administrator, Region IV y:..
f,.y)
U. S. Nuclear Regulatory Commission 7-ij
'7] gJggg w }
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
~
g,,. _, _.,.
'b))A A
O
SUBJECT:
Waterford SES Unit No. 3 s
Docket No. 50-382 Interim Report of Potential Reportable Deficiency No.
%d
" Tube Steel (IIT 16600) Laminations"
Reference:
Telecon - L. L. Bass (LP&L) to W. Crossman (NRC) dated 4/2/82
Dear Mr. Collins:
Louisiana Power & Light Company was scheduled to submit an interim report on Potential Reportable Deficiency No. 70 by April 2, 1982. This Potential Reportable Deficiency involves 320 feet of tube steel which was to be used for the fabrication of pipe hangers.
Ebasco Services, Inc. has notified LP&L that additional time is required in order to complete the evaluation.
It is anticipated that this evaluation will be completed and an interim report submitted by May 3, 1982.
If you have any questions, please let us know.
Very truly yours,
, JM GDMcL/LLB/ncd cc:
1)
Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
's d) 2)
Director r
Office of Management
/
/C Information and Program Control f
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 K0$$$
PDR 1