Final Deficiency Rept Re Unqualified Welding Procedure for Hanger Lug Attachments,Initially Reported 811210.Affected Lugs Identified.Lugs Welded by Welders Ineligible for Qualification Will Be Reworked by Qualified Welders
ML20050D483
Person / Time
Site: Zimmer
Issue date: 03/30/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-1683, NUDOCS 8204120249
Download: ML20050D483 (2)


Text

.

- gjy p hw_

TIIE CINCINNATI GAS & ELECTRIC COMPANY sm " *"

CINCINN ATI. OHIO 45201 ZIMMER POWER STATION, P. O. BOX 201, MOSCOW, OH 45153 March 30, 1982 QA-1683 E. A. BORGM ANN se mos vict pur sioENT U. S. Nuclear Regulatory Commission l Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler

  1. D Regional Administrator 0 A RE: WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 ,, .

10CFR50.55(e) , DOCKET NO. 50-358, M-29 C RE C,R "'

' 4 UNQUALIFIED WELDING PROCEDURE FOR WELDS GREATER THAN 0.864 INCH - CONSTRUCTION 7 APRl'21982 " --

PERMIT CPPR W.O. #57300 JOB E-5590  ? nom ett m W 8 g FILE NO. NRC-8 M-29 W {$

Gentlemen: 'l This letter constitutes a final report on the subject hanger lug attach-ments.

On December 10, 1981, report QA-1549 was submitted concerning the installa-tion of hanger lug attachments. This report identified several hanger lug attachments that had been welded utilizing a procedure not previously qualified to a sufficient thickness range. This occurred because the limitations of the procedure were misinterpreted. Subsequently CG&E letter number QA-1598 dated January 18, was submitted as an interim report. At this time we identified the retesting and qualification of the applicable welding procedure as part of the corrective action. Also, as corrective action, it was stated that all welding procedures were being rewritten into a more detailed format which identifies the allowable thickness for which the procedure is qualified. Currently thirty-three (33) of thirty-eight (38) procedures have been completed.

i i When the last report was submitted, an effort was being made to identify the individual lugs. All affccted lugs have been identified on non-conformance reports and dispositioned as follows:

1. Lugs welded by qualif,ied welders are accept as is on the basis of the requalificatio verification docureyh.n tionof thetheprocedure for welds. and acceptable quality i

8204120249 820330 PDR ADOCK 05000358 l S PDR APR 5W I [Ul'ok

a*

Mr. J. G. Keppler U. S. Nuclear Regulatory Commission Region III.

March 30, 1982 - QA-1683 Page 2 t

2. Lugs welded by welders who were not qualified for the thickness will be accept as is if the welder is able to qualify for the greater thickness,* this also is based on acceptable quality verification documentation.
3. If the welder is unable or it is not possible to qualify him, the lugs will be removed or the weld will be ground down to the thickness for which the welder was qualified and the weld will then be completed by a qualified welder.

The rework as required by the non-conformance reports will be completed as scheduling and work load allows.

We trust this fulfills the requirements as a final report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI CAS & ELECTRIC COMPANY WL --

E. A. BORGMANN j SENIOR VICE PRESIDENT KRS:plc cc: NRC Site Resident Inspector Attn: W. F. Christianson NRC Office of Inspection & Enforcement Washington, D. C. 20555 i