ML20050D431
| ML20050D431 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/17/1982 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20050D424 | List: |
| References | |
| NUDOCS 8204120199 | |
| Download: ML20050D431 (2) | |
Text
.
O Wisconsin Electnc POWER COMPANY 231 W. MICHIGAN P.O. BOX 2046. MILWAUKEE, WI 53201 March 17, 1982
' i;
[f\\N h
/
Mr. H.
R.
Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION g
Washington, D. C.
20555
.-9
.,R.?;2fogg.
~
O T
Attention:
Mr.
R. A. Clark, Chief Q # $ 3.:7 gyc.g C
~~"6 Operating Reactors, Branch 3 mar a Gentlemen:
+
l#
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN MANUAL, REVISION 18 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of Revision 18 to the Point Beach Nuclear Plant Emergency Plan Manual.
This revision consists of page changes which should be filed in your copies of the Emergency Plan Manual in accordance with the attached instructions.
Please return the receipt for these copies to:
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, h
Assistant Vice President C. W.
Fay Enclosures y
Copies to NRC Resident Inspector (1) j j Incident Response Center, i
Region III (3) 8204120199 820329 PDR ADOCK 05000266 F
(
March 17, 1982 POINT BEACH NUC1 EAR PLANT EMERGENCY PLAN M REVISION 18 PAGE CHANGES OF MARCH 11, 1982 Attached you will find page changes to the Emergency Plan Manual under the date of March 11, 1982. Please file these changes in accor-dance with the page change instruction and file the instruction in the front of your manual.
Return this receipt form to Ms. F. A. Zeman at the Point Beach Nuclear Plant.
Date e
9 9
1 l
.-_