'g.,.--
^N 7
MAR 2 51982 Docket Nos.: 50-443/444 APPLICANT: Public Service Company of New Hampshire FACILITY:
Seabrook Station
SUBJECT:
MEETING
SUMMARY
On March 25, 1982 representatives of the Public Service Company of ;tew Hampshire met with the NRC staff to review the construction schedule for Seabrook Station Unit 1 cad common facilities. The meeting was held to address a 13 month difference between the utility and NRC projections for construction completion. A meeting notice and agenda are attached as Enclosures 1 and 2 respectively. Enclosure 3 is a list of persons who were present.
The meeting proceded according to the agenda.
The important points of the NRC presentation were covered in a series of comments during the PSNH presentation. There was' no need for a formal Caseload Forecast Panel presentation.
The NRC management developed 'the following conclusions:
1.
PSNH should reassess their projected fuel load date and provide the results of that reassessment to the NRC. This should be completed over the next two or three months.
2.
The NRC staff will adhere to existing schedules for publication of the Draft Environmental Statement and a draft of the Safety Evaluation i
Report.
3.
The NRC Caseload Forecast Panel should perform another review of the construction activities.
The PSNH representatives agreed to the reassessment in the near future of the projected fuel load date, and expressed support for another l
Caseload Forecast Panel evaluation.
l l
1 l
l Louis L. Wheeler, Project Manager Licensing Branch No. 3
$Id$o0g@ogggggg M on d U censing PDR
Enclosures:
At etated DL:LB#3 DL: h3 o,nc,p ccc sa next page. g u ; g e. 5....m y._g,
.....s
..h.
.f.k unc,onu 3:e no.co.uncu 024o OFFICIAL RECORD COPY
- " "-a29 24
t l
SEABROOK William C. Tallman Chairman and Chief Executive Officer Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hampshire 03105 John A. Ritscher, Esq.
E. Tupper Kinder, Esq.
Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire The Honorable Arnold Wight P. O. Box 330 New Hampshire House of Representatives Manchester, New Hampshire 03105 Science, Technology and Energy Committee State House G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region I 631 Park Avenue Resident Inspector King of Prussia, Pennsylvania 19406 Seabrook Nuclear Power Station c/o V. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 700 3 Godfrey Avenue Seabrook, New Hampshire 03874 Hampton, New Hampshire 03842 Mr. John DeVincentis, Project Manager Robert A. Backus, Esq.
Yankee Atomic Electric Company O'Neill, Backus and Spielman 1671 Worcester Road 116 Lowell Street Farmingham, Massachusetts 01701 Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager Norman Ross, Esq.
United Engineers and Constructors 30 Francis Street 30 South 17th Street Brookline, Massachusetts 02146 Post Office Box 8223 Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.
Sheldon, Harmon & Weiss Mr. W. Wrignt, Project Manager 1725 I Street, N. W.
Westinghouse Electric Corporation Washington, D. C.
20006 Post Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt, Esq.
Office of the Assistant Attorney General Thomas Dignan, Esq.
Environmental Protection Division Ropes and Gray One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Cameron, Jr., Esq.
l General Counsel l
Public Service Company of New Hampshire P. O. Box 330 I
Manchester, New Hampshire 03105 i
ENCLOSUP.E 2 Pl'OPOSED AG!!NDA PSNil - NHC SENIO!! f MNAGEMENT MEETING Hoom P-110, Phillips Building Bethesda, !!aryland March 25. 1982 9:00 AM Introductory Cc ments NRC:
Mr. Darrell G. Eisenhut PSNH: Mr. David N. !!erril1 Brief Comments on Financial Co =itments to Complete the Plant.
9:05 M1 1
PSNil Presentation int roduct ion J. DeVincentis II
- Size and Conposition of the liort Force H. T. Tracy III
- Status of Buli Cc-.odities H. T. Tracy IV
- Current Status of Fystem Installation A. M Ebner V
Critical and Near-Critical Path liork A. M Ebner Schedule VI Impact of Any Recent NRC Actions / Concluding l
Remarks i
10:05 AM NRC (Caseload Forecast Panell presents the basis for the December 19S4 date.
10:30 AM Recess.
NRC m.anagenent convenes to ccnsider iis a t.s e s smen t of the two presentations.
l 10 ;.: 5 AM
'ikC ma nag er.en t discusser its conclusient with P5NH.
11:00 M1 Meeting ad,iourns.
I i
I 3
t o,
ENCLOSURE 3 l
ATTENDANCE LIST NRC Staff
- H. Denton, Director, Office of fluclear Reactor Regulation (NRR)
D. Eisenhut, Director, Division of Licensing, NRR
- R. Purple, Deputy Director, Division of Licensing, NRR R. Tedesco, Assistant Director, Division of Licensing, flRR
- F. Miraglia, Chief, Licensing Branch 3 E. Reis, Assistant Chief Hearing Counsel, Executive Legal Directorate J. Austin, Technical Assistant, Office of the Executive Director for Operations L. Wheeler, Project Manager, Licensing Branch 3 W. Lovelace, Engineer, Office of fianagement and Program Analysis R. Perlis, Hearing Attorney, Executive Legal Directorate A. Cerne, Senior Resident Inspector l
l Public Service Company of flew Hamoshire/ Yankee Atomic Electric Company j
D. Merrill, Executive Vice President, psf 4H J
'W Johnson, Vice President, YAEC I
B. Beckley, Manager of Nuclear Projects, PSNH J. DeVincentis, Project fianager, YAEC l
H. Tracy, Director of Construction, YAEC R. Pizzuti, Construction flanager, YAEC R. Cheyne, Project Controls fianager, United Engineers and Constructors, Inc.
A. Ebner, Project Manager, United Engineers and Constructors, Inc.
D. f'cLain, Startup Manager, YAEC Other M. Fallon, Seacoast Anti-Pollution League (Observer)
- Part-time attendees E
L Io e
MEETING
SUMMARY
DISTRIBUTION Docket File 50-W. Johnston NRC PDR S. Pawlicki Local PDR V. Benaroya NSIC Z. Rosztoczy TERA W. Haass LB#3 Files D. Muller H. Denton R. Ballard E. Case W. Regan q,
D. Eisenhut A. Toalston d\\
R. Purple R. Mattson S
R. Tedesco T. Speis-l[
ggCEf*N B. J. Youngblood M. Srinivasan 2
6gy 4
A. Schwencer
- 0. Parr ct06 F. Miraglia F. Rosa S
u%$ygggg E. Adensam B. Sheron, Acting g
S J. Miller L. G. Hulman 6
G. Lainas R. Houston
/
e T. Ippolito W. Gammill 4
4 B. Russell F. Congel D. Crutchfield L. Rubenstein T. Novak W. Butler S. Varga C. Berlinger D..Vassallo R. Clark F. Schroeder J. Stolz K. Kniel R. Vollmer D. Skovholt J. Knight G. Knighton R. Bosnak M. Ernst F. Schauer A. Thadani R. Jackson W. Minners G. Lear S. Hanauer Project Manager L.-Wheeler H. Thompson Attorney, OELD J. Zwolinski J. Lee P. Collins OIE (3)
D. Ziemann ACRS (16)
V. Moore NRC Participants Regional Administrator R. C. Haynes HDenton WLovelace DEisenhut HPerlis RPurple ACerne RTedesco FMiraglia EReis JAus tin LWheeler bcc: Applicant & Service List l