ML20050C767
| ML20050C767 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/11/1981 |
| From: | Ballentine J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20050C768 | List: |
| References | |
| NUDOCS 8204090340 | |
| Download: ML20050C767 (1) | |
Text
.
'i t'iJ tmSE EE V ' 2 A UTHORITY Sequoyah ktic! EYlear Plant P. O. Box 2000 Daisy, Tennessee 37319 SEP 111981 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Enclosed is the August, 1981 Monthly Operating Report for Sequoyah Nuclear Plant.
Very truly yours, TENNESSEE VALLEY AUTHORITY
> h bk'
. M. Ballentine Power Plant Superintendent Enclosure cc (Enclosure):
Director, Region II Director, Office of Management Nuclear Regulatory Commission Information and Program Control Office of Inspection and Enforcement Nuclear Regulatory Commission 101 Marietta Street Washington, DC 20555 (2 copies)
Suite 3100 Atlanta, GA 30303 (1 copy)
Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)
Mr. A. Rubio, Director Mr. Bill Lavallee, NSAC Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
Mr. R. C. Goodspeed MNC 461
~
l Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, PA 15230 (1 copy) 9 9
4s i
I 8204090340 810911 g
PDR ADOCK 05000327 R
-