OPERATING DATA REPORT 4
DOCKET NO.
50-293 DATE 09/10/81 COMPLETED BY G.G. Whitney TELEPHONE l-617-746-7900 t
OPERATING STATUS
- 1. Unit Name:
Pilgrim I Note 5
- 2. Reporting Period:
A'mu st. 1981
- 3. Licensed Thermal Power (MWt):
1998.
678.
- 4. Nameplate Rating (Gross MWe):
655.
- 5. Design E'ectrical Rating (Net MWe):
td U.
- 6. Maxi.num Dependable Capacity (Gross MWe):
670
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
NONE
- 9. Power Level To Which Restricted. If Any (Net MWe):
NONE
- 10. Reasons For Restrictions. If Any:
N/A His Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period 744.0 5831.0 76511.0
- 12. Number Of Hours Reactor Was Critical 686.4 5247.9 55432.5
- 13. Reacra-Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Ilours Generator On.Line 672.1 5170.2 53677.I
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1116504.0 9413856.0 91703232.0
- 17. Gross Electrical Energy Generated (MWH) 374820.0 3203170.0 30532534.0 359491.0 3080225.0 29330832.0
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 90.3 88.7 70.2
- 20. Unit Availability Factor 90.3 88.7 70.2
- 21. Unit Capacity Factor (Using MDC Net) 72.I 78.8 57.2 l
l
- 22. Unit Capacity Factor (Using DER Net) 73.8 80.6 58.5
- 23. Unit Forced Outage Rate 9.7 7.I 10.I
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:
Refuel Outnge commencing September 26, 1981.
- 25. If Shut Down At End Of Repert Period Estimated Date of Startup: Unit Operating
- 26. Umts in Test Status tPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITI A L ELECTRICITY COMMERCIAL OPERATION D204090324 810911 PDR ADOCK 05000293 R
PDR (4/77 )
AVER.'sGE DAILY LNIT ruwER LEVEL DOCKET NO.
50-293 Pilgrim I WIT DATE 09/10/81 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 MONE AUGUST, 1981
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) g 0,
g7 608.
O.
361.
gg 3
352.
39 386.
4 636.
20 236.
640.
3; 317.
5 6
634.
22 340.
593.
23 420.
478'.
g 631.
24 9
660.
23 498.
10 657.
26 223.
11
- 656, 27 212.
660.
3 556.
4 g2 655.
618.
g3 29 570.
651.
30 g4 15 527.
33 639.
563.
gg INSTRL'CTIONS On this formst.!ist the average daGy unit powe. levelin MWe. Net for each by in the reporting month. Campute to the nearest wnole mepwatt.
t o /- i
UNIT SIIUIDOWNS AND POWER REDUCTIONS IM)CKET NO. 50-293 UNIT NAME Piltrim I DATE 09/10/81 COMPLET ED ity G.G. Whitnev REPORT MONill - AUGUST. 1981 TELEPilONE 617-746-7900 E
e
.$ g 3
j E3 1.icensee j-t,
{"i L
Cause & Corrective No.
D.it e g
3g jj5 Event gg go Action to yE 5
y if, =
Reporsit mo H
o Picsent Recurrence g
u
.=
Q 13 81/07/30 F
49.0 A
2 81-039/03L CI VALVEX Packing Leak on "A" Recire.
14 81/08/18 S
0.0 B
5 NA HC HTEXCH Main Condenser Backwash 15 81/08/20 S
0.0 B
5 NA HC HTEXCH Main Condenser Backwash 16 81/08/21 F
4.3 B
2 NA HC HTEXCH Reactor Made Sub-Critical due to Mussel incursion in screen house.
17 a.1/08/26 F
18.6 B
3 NA HC HTEXCH Reactor Scram due to Low Vacuum in Condenser I
2 3
4 F: Fort ed Reason:
Melluxt:
Exhibit G. Instrintions S. Scheiluted A Equipment Failure (Explain) l Manual for Preparation of Data
- n. Maintenance of Test 2 Manual Scram.
Entry Shecis for I.icensee C Refueling 3 Automatic Scram.
Event Report (i.ER) File (NURI.G-D-Regulatory Restriction 4 Other (Explain).
0161)
E. Operator Training & License Examination F Administrative 5
G Operational 1:::or (Explain) 1:shibii I. Same Sonice 19/17) 11 Other (Explain)
4 i
BOSTON DISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Summary of Operations for August, 1981 The reactor was brought critical on August 2,1981 at 1234 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.69537e-4 months <br /> and kept in hot standby until August 3, 1981 when the turbine was synchronized on the grid at 0103.
Power was limited to 95% due to rod 22-11 being lef t fully inserted due to excessive scrar time.
Subsequent to a shutdown margin verification, power was reduced on August 7, 1981 to adjust rod pattern and withdraw of rod 22-11.
Unit was returned to 100% power on August 8, 1981.
IIPCI was declared inoperable on August 11, 1981 for repair of M0-1301-3 and returned to service on August 13, 1981.
From the period August 14, 1981 to August 25, 1981 power was reduced daily due to fouling of main condenser from mussels. On August 21, 1981 the turbine was taken off line because of low condenser vacuum caused by mussel intrusion.
Although divers cleaned intakes on August 26, 1981, unit scrammed on condenser low vacuum while opening 1-3 waterbox for cleaning. The reactor was brought critical on August 27, 1981 at 0358 and commenced power increase to 100%. On August 30, 1981 problems with dirty collet fingers was experienced with control rod 34-51.
CRD 34-51 was fully inserted which limited power to 98%.
SAFETY / RELIEF VALVE CllALLENGES FOR AUGUST,1981 Report Requirement: TMI T.A.P. II.K.3.3 No challenges for this month.
N
t'1u.n ih 4.u c t.c.A n zuur.A diAA10h M051H
^'uu3'.1901
}LUOR SAFETY RELATED IL\\INTENANCE CORRECTIVE ACTIOS SYSTE'!
COMPONENT l
MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED L.
2 RECIRC DISCHARGE PACKING DLOWING IiORMAL REPACKED
/A li/A VALVE UEAR i
BYPASS FLON WATER VENDOR REPAIR INSPECTION AND PEPCIANENT REPAIR 81-049/0lX-0 l "B" RBCCW 30 EROSION UILL BE DONC DURING 9/81 REFUEL OUTAGE 30 "A" RBCCW DIRTY MUSSLES CLEANED N/A N/A l
i 46
! STARTUP TRA'iS-HUNG-UP NEEDS l FREED UP RELAY WILL BE OVERHAULED DURING NEXT N/A FORMER UNDER CALIBRATIOM REFUELING OUTAGE - 9/81 VOLTAGE RELAY i
i l
l 1
e e
9
-e
'Y REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for next Refueling Shutdown:
September, 1981 3.
Scheduled date for restart following refueling: December 7, 1981 4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6.
The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DRB265 assemblies.
7.
(a)
There are 580 fuel assemblies in the core.
(b)
There are 764 spent fuel assemblies in the spent fuel pool.
8.
(a)
The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b)
The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1006 fuel assemblies.
NOTE: There are 172 new fuel assemblics currently in the spent fuel pool.
l l
l
[