DOCKIT NO.
50-293 gyg7 Pile, rim 1 1
i DATE 12/10/81 4
COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 1
MONTd November, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA1LY POWER LEVEL (MWe-Net)
(MWe-Net) 0 O
I 1.,
~
2 0
jg' O
i 0
0 3
39 4
0 20 0
i 0
0
,3 0
0 3
6 0
0
,3 i
0 0
3 74 9
0
,J 0
10 0
26 0
0 0
11
- 7 12 0
- 3 0
0 13 0
,9 0
0 14 30 O
O 31 15 i
0 16 INSTAUCTIONS On this format. list the aversge da5y unit power leve!in MWe. Net for each day in the reporung month. Campute to the nearest whole mepwatt.
t o/77 )
B204090322 811210 PDR AtiOCK 05000 y
=.
a 1
OPERATING DATA REPORT 4
DOCKET NO.
50-293 DATE 12/10/81 COS1PLETED BY G.G.k'hitney TELEPHONE 617-746-7900 OPERATING STATUS
- F " I I
- 1. Unit Name:
November, 1981
- 2. Reporting Period:
1998.
- 3. Licensed Thermal Power (NtWt):
f,
- 4. Nameplate Rating (Gross $1We):
678.
- 5. Design Electrical Rating (Net.N!We):
655.
690.
- 6. Staximum Dependable Capacity (Gross atWe):
- 7. Sf aximum Dependable Capacity (Net SIWE): 670.
l
- 8. If Changes Occur in Capacity Ratings (Ireins Number-3 Through 7) Since Last Report. Give Reasons:
J None
- 9. Power Level To Which Restricted,If Any (Net 31We):
None i
- 10. Reasons For Restrictions, if Any-i N/A Titis Sionth Yr.-to-Dat e Cumulative 720.0 8016.0
-78696.0 i
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0.0 5848.7 56033.3
- 13. Reacter Reserve Shutdown Hours 0.0 0.0 0.0 1
- 14. Hours Generator On.Line 0.0 5771.0 54277.9
- 13. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (51wH) 0.0 10528512.0 91817888.0
- 17. Gross Electrical Energy Generated (htWH) 0.0 3581870.0 30911234.0
- 18. Net Electrical Energy Generated (51WH) 0.0 3443877.0 29694484.0
- 19. Unit Senice Factor 0.0 72.0 69.0
- 20. Unit Availability Factor.
0.0 72.0 69.0
- 21. Unit Capacity Factor (Using 51DC Net) -
'n. n 64.1 56.3 l
- 22. Unit Capacity Factor (Using DER Net) 0.0 65.6 57.6
- 23. Unit Forced Outage Rate 0.0 6.4 10.0
- 24. Shutdowns Scheduled Oser Next 6 Stonths (Type, Pate.and Duration of Eacht:
)
1 1
September, 1981
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Januarv. 1982
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COS1 MERCI AL OPER ATION t
i (0/771 m.
4 i
UNil SIIUTDOWNS AND POWER REDUCTidNS DOCKET NO.
50-293 UNI T N AME Pilgrim 1 DATE 12/ld/81 REPORT MON 1lI November, 1981 COMPl.ETED nY G.G. Whitney TEl.EPilONE __617-746-7900 l
1 l.
j sn S C
c es f_3
's5b Cause & Corrective
==
c.
No.
Date E.
Event 5,3 El Att on su 5-0 Epe
[
Picscut Recurrence y Di j RCP"'I 8 to V OO M
6 18 81/09/26 S
720.0 C
2 N/A RC FUELXX Refuel Outage Continues i
b i
l l
t I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions 5: Scheduled A. Equipment Failure (E= plain) 1-Manual for Preparation of D.na II Maintenance of Test 2-Manual Scra m.
Entry Sheets for 1.icensee C.Refocling 3.Aulomatic Scram.
Event ReporI (l.l!R) File INURIE D Regulatory Restriction 4 Other (Explain) 0161) li Operator Training & 1.icense Examination l
F. Ailminist rative 5
l G Operational Error (Explain) 1:xlubis 1.Same Source
{
p /77) ll Other (E xplain) l
REFUELING INFOPJ!ATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 19 78:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Nurbe r 50-29 3.
2.
Scheduled date for next Refueling Shutdown:
September, 1983 3.
Scheduled date for restart following refueling: November, 198,3 4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6.
The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblics and 60 P8DRB265 assemblies.
~
7.
(a)
There nre 580 fue1 assemblies in the core.
(b) There are 936 fuel assemblies in the spent fuel pool.
8.
(a)
The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b)
The planned spent fuel storage capacity is 2320 fuel assemblics.
9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
NOVDIBER. I 98 i MAJOR SAFETY RELATED !!AINTENANCE I
l
}
CORRECTIVE ACTION SYSTE?!
C0!iPONENT I
MALFUNCTION CAUSE ttAINTENANCE 1
TO PREVENT RECURRENCE ASSOCIATED I j
56 DOOR SEAL FAN SEAL WON'T SEAL USE NEWSEALSINSTAL-l N/A ROOM #4 LED 6
FEEDWATER CHECK FAILED LLRT SOFT SEAT REPAIR PER PRO-N/A VALVE 58A WEAR CEDURE 3.M.4.51
& 3.M.4.52 6
[FEEDWATERCHECK FAILED LLRT SOFT SEAT REPAIR PER PRO-N/A VALVE 62B l
WEAR CEDURE 3.M.4.51
& 3.M.4.52 6
FEEDWATER CHECK FAILED LLRT SOFT SEAT REPAIR PER PRO-N/A VALVE 62A WEAR CEDURE 3.M.4.51
& 3.M.52 30 "A"
RBCCW HEAT BAD BAFFLE PLATES DESIGN REPAIRS UNDER PDCR TO LTER DESIGN PDCR 81-55 EXCHANGER 1
A0 302-2B FAILED LLRT NORMAL USE REBUILD & RESEAT N/A 1
A0 302-1B FAILED LLRT NORMAL USE REBUILD & RESEAT N/A 1
A0 302-lc FAILED LLRT NORMAL USE REBUILD & RESEAT N/A l'
A0 302-1A FAILED LLRT NORMAL USE REBUILD & RESEAT N/A 1
A0 301-lD FAILED LLRT NOPMAL USE REBUILD & RESEAT N/A I
e
.a
BOSTON EDISON COMPA'N
-I'*
PILGRIM NUCLEAR POWER STATION Summa ry of Opera tions for November 1981 The unit has been shut down all month for the 1981 Refueling dutage.
All outage work continues.
Safety / Relief Valve Challenges for November, 1981:
teport Requirement: TMI T.A.P.
II.K.33 No challenges for this month.
Refuel Outage O
e 9