Forwards QA Program Insp Rept 99900505/82-01 on 820111-15. No Noncompliance Noted
ML20050C505
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 02/17/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tenzer B
EBASCO SERVICES, INC.
Shared Package
ML20050C500 List:
References
REF-QA-99900505 NUDOCS 8204080575
Download: ML20050C505 (2)


Text

~

j,

^{

NUCLEAR REGULATORY COMMISSION

.3

f Re
:N IV EXHIBIT LJS-2 011 RYAN PLAZA DRIVE. SUITE 1000 0

ARLINGTON. TEXAS 78011 g

FEB 171982 Docket No. 99900505/82-01 i

l

$)

Ebasco Services, Inc.

'J "J

ATTN: Mr. B. E. Tenzer, Vice President FEB 2 21982 Materials Engineering and Quality l

Assurance i.'.ATER!.Y~9 mong* a U-

~~"""

Two World Trade Center New York, NY 10048 Gentlemen:

This refers tn the inspection conductea by Mr. J. R. Costello, of this office on.' January 11-15, 1982, of your facility at New York, New York, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made for two principal purposes:

(1)toassessthe effectiveness of Ebasco's system for design verification by in-depth design reviews of specific safety-related systems on two active projects, Shearon Harris and Washington Nuclear Plants (WNP) 3 and 5; and (2) to verify com-pliance to design requirements of parallel slide gate valves procured by Ebasco from Atwood Morrill and fabricated by Hopkinsons Ltd. for use at WNP 3 and 5.

Areas examined during this inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet the connitments of your Topical Report No. ETR-1001 or NRC require-ments.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is neces-fary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding;

'and (b) submit within 25 days from the date of this letter a written appli-cation to this office to withhold such infonnation.

If your receipt of this letter has been delayed such that less than 7 days are aviilable for 8204080575 820326 PDRADOCK05000g 0-

Ebasco S2rvices, Inc. your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the informa-tion which identifies the document or part sought to be withhelii, and which lontains a full statement of the reasons on the basis which it is claimed

' that the information should be withheld from public disclosure.

This sec-tion further requires the statement to address with specificity the con-siderations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be iricorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the speci-fied periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely b

OT apov Vendor Inspection Brlanch

Enclosures:

1.

Appendix A - Inspection Report No. 99900505/82-01 2.

Appendix B - Inspection Data Sheets (14 pages)