ML20050C176
| ML20050C176 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 04/02/1982 |
| From: | Oneill J O'NEILL, J. |
| To: | NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| Shared Package | |
| ML20050C168 | List: |
| References | |
| NUDOCS 8204080242 | |
| Download: ML20050C176 (1) | |
Text
'
- " M D wiaczy9 y g UIIITED STnTES OF A"ERXCA HUCLEAR EEGULATCRY CO 2ISSION BEFCRE THE AT0idIC SAFETY AfD LICENSItiG BCARD In the I4atter of IEkW tiUn@d350-155 CCNSU:4ERS PONER CCMPANY
)
)
(Spent Fuel Pool Modificat. ton; s
(Big Rocx Muclear Plant) )
h o
John O'ikill's Interrocatories to the NRC Staff Reenrdine
_0'Ibill Contenti on II C as Restatod hv the Board Fnbruarv 10 1 F ?~
Theso.uestions refer to " John O'Iioill's Interroc'itories to Consu^1ofs Power Coneany Concerning Cas% Drops, Crane Accidents, and Thread ed "ipes," att,tchad.
Please ans"er these cues,:icns in the manner penscribed in that docunent,,
Anwer the questions listed belor forem the above docu~nts 1)
I V c-2)
De> tail i'nspection standards for topic raised in IV 0, 3)
VII 1 e and d.
E)
Recardine VIII, what type of scismic nonhtorin5 is reovired?
5)
EMIX 9, il 10, IX 11, Detail any HRC nandated or reconended modifications, and 15 censee responseo 6)
XI 7 e and do 7)
XI 11.
Also, are eny of these etntrolg, nonit rs and 2 iring <ind rel.ted e-uiptnent requirnd to bc seismically
- ified5
')
XI iS b c)
XII o r, 10)
XIII 6 c.
11)
XVII a, b, at Crandf atharirs:
Det,il those Ni1C ntandards, test ctencards, models fa for postulated ever es, inplcnentation sc".eCules nnd other natters of rerulation have 1een nodified, relaxef ar dropued for the follot'ing Bjfr Rock syetersi ceiunic cualifications cf the crane ':ithin a.
containnent; b.
threa61ne on the fire ' "it e r sy7 t er p '. pine end its seisnie aualification; brench of spent fuel pool scenariosa c.
d.
nod els for.md calculations surrounding ens' drop accidents; Describe the re'.sonine b,h'inf each.
'"he Boa.rd h is rni s e th e q ue st 4. on of ad ec uat e NiiC re vi e":.
- h it conclusions rutd reportu of Licenset or their consultnrte have not been independctny calculcted by the iUTCT Explain in depth.
Include these :of els and prorrtr.s of ennlysis that have not been thorou:thly revinw's.
Than You.
e204000242 e20402 PDR ADOCK 05000155 PDR
-