Forwards Public Version of Revision 1 to Emergency Plan. Plan Has Been Revised to Address Deficiencies Per 10CFR50 App D as Well as Applicable Requirements of NUREG-0654, NUREG-0696 & App E.Cross-index & Receipt Form Encl
ML20050C078
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/16/1982
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20050C075 List:
References
RTR-NUREG-0654, RTR-NUREG-0696, RTR-NUREG-654, RTR-NUREG-696 LAC-8141, NUDOCS 8204080107
Download: ML20050C078 (9)


Text

.

D DA/RYLAND hb/Mh00PERAT/VE o ec,m

ee EAs A< cou -

tA c=cs E us::r.s, e

+;e; sem March 16, 1982 In reply, please refer to LAC-8141 DOCKET NO. 50-409 Mr. James G. Keppler, Directorate m

gp U. S. Nuclear Regulatory Commission Region III Incident Response Center S

+

\\

799 Roosevelt Road

,E ~'ggp a

Glen Ellyn, IL 60137 g.

n INSEE51982

SUBJECT:

DAIRYLAND POWER COOPERATIVE

~2 7I LA CROSSE BOILING WATER REACTOR ( LACBWR)

C) ng#g PROVISIONAL OPERATING LICENSE NO. DPR-45 B

UPGRADED LACBWR EMERGENCY PLAN g

S

REFERENCES:

(1)

NRC Letter, Keppler to Linder, dated October 29, 1981.

(2)

DPC Letter, Linder to Keppler, LAC-7931, dated December 17, 1981.

(3)

DPC Letter, Linder to Keppler, LAC-7446, dated April 2,1981.

Gentlemen:

The LACBWR Emergency Plan, which was submitted by Reference (3), was reviewed during the Emergency Preparedness Appraisal of July 13-24, 1982.

The results of the review are in the Emergency.\\ppraisal Report letter (Reference 1).

Your letter and Appendix D to the report, " Emergency Preparedness Evaluation Report," identified deficiencies in the LACBWR Emergency Plan and requested that changes be provided to correct the deficiencies within 90 days of the letter date of Reference (1) (i.e. February 27, 1982).

The LACBWR Emergency Plan has been reviewed and revised to address the deficiencies in Appendix D as well as applicable requirements of NUMEG-0654, Revision 1,

" Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of j

Nuclear Power Plants;" NUREG-0696, " Functional Criteria for Emergency Response Facilities," and the planning standards contained in 10CFR50.47 and 10CFR50, Appendix E.

Three copies of the revised LACBWR Emergency Plan are forwarded with l

this letter.

In addition. Attachment 1 provides a cross-index of l

deficiency items specified in Appendix D against revised sections of the LACBWR Emergency Plan.

g WP60

_1_

g 8204080107 820330 b

i PDR ADOCK 05000409

.F PDR

(

e

I U. S. Nuclear Regulatory Commission LAC-8141 Region III Incident Response Center March 16, 1982 i

The revised LACBWR Emergency Plan has been reviewed and recommended for management approval by the appropriate committee in accordance with Technical Specification 6.5.1.6.

Enclosed is a copy of Form L-v59, which should be completed and returned to LACBWR to verify your receipt of the revised plan.

Onsite Emergency Response Personnel will be trained in appropriate aspects of this revision to the Emergency Plan by April 1, 1982.

Of fsite Emergency Support Agencies will be trained in appropriate aspects of this revision by June 1,1982.

If there are any questions concerning this submittal, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE J & p)D

L:~

cL ~

Frank Linder, General Manager FL:RES: abs ENCLOSURES CC:

Resident Inspectors (1)

Sheriff Geoffrey Banta Mr. John Crandall, Director Vernon Co. Sheriff's Office Iowa Disaster Services Viroqua, WI 54665 (1)

Room A-29, Herbert Hoover Bldg.

Des Moines, IA 50319 (1)

Sheriff Dennis L.

Swedberg Houston Co. Sheriff's Office Mr. John Kerr, Coordinator Box 106 Region I Caledonia, MN 55921 (1)

Division of Emergency Services State Office Building Mr. Harold Denton S t.

Paul, MN 55100 Directorate Of fice of NRR U. S. Nuclear Regulatory Commmission Bethesda, MD 20014 (10)

Mr. Joseph LaFleur, Administrator Division of Emergency Government Hills Farm State Office Building Madison, WI 53700 (1)

WP60 I

~ :.__. _:_

I F

(

Nk - NaskinakOn CONTROLLED DISTRIBUTION NO.

M f

TO:

3 42/78 t

FPOM:

LACBWR PLANT SUPERINTENDENT i

IACBWR controlling documents have been revised or issued new as follows:

EMERGENCY PLAN FOR LA CROSSE BOILING WATER REACTOR (LACBWR), PROVISIONAL OPERATING LICENSE NO. DPR-45, DATED MARCH 8, 1982, REVISION 1.

Q() cop $er l

?

Please verify receipt

@ The material listed above is transmitted herewith.

of all listed material, destroy superseded material, and sign below to acknowledge receipt.

O The aterial listed above has been placed in your binder.

O Please review listed material, notify your personnel of changes, and sign below to acknowledge your review and notification of personnel.

5 DATE

[

S/

Plcage ^ return this notificatiori by: 3/31/82

. o 8

D DA/RYLAND h

h COOPERAT/VE 90 sex e7 2eis E AsT Av SoVTM = LA CAOSSE W15CONSIN 64601

<me> 7memc March 16, 1982 In reply, please refer to LAC-8141 L

DOCKET NO. 50-409 cn 19 Mr. James G. Keppler, Directorate U. S. Nuclear Regulatory Commission 8

Region III Incident Response Center

_gggWED g

D 799 Roosevelt Road 2

ggg 2 51982 :7 ('

Glen Ellyn, IL 60137 af[,N'b

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 4

UPGRADED LACBWR EMERGENCY PLAN A

0)

REFERENCES:

(1)

NRC Letter, Keppler to Linder, dated October 29, 1981.

(2)

DPC Letter, Linder to Keppler, LAC-7931, dated December 17, 1981.

(3)

DPC Letter, Linder to Keppler, LAC-744 6, dated April 2, 19 81.

Gentlemen:

The LACBWR Emergency Plan, which was submitted by Reference (3), was reviewed during the Emergency Preparedness Appraisal of July 13-24, 1962.

The results of the review are in the Emergency Appraisal Report letter (Reference 1).

Your letter and Appendix D to the report, " Emergency Preparedness Evaluation Report," identified deficiencies in the LACBWR Emergency Plan and requested that changes be provided to correct the deficiencies within 90 days of the letter date of Reference (1)

(i.e. February 27, 1982).

The LACBWR l

Emergency Plan has been reviewed and revised to address the deficiencies in Appendix D as well as applicable requirements of NUREG-0654, Revision 1,

" Criteria for Preparation and Evaluation of Radiclogical Emergency Response Plans and Preparedness in Support of l

Nuclear Power Plants;" NUREG-0696, " Functional Criteria for Emergency Response Facilities," and the planning standards contained in 10CFR50.47 and 10CFR50, Appendix E.

Three copies of the revised LACBWR Emergency Plan are forwarded with this letter.

In addition, Attachment 1 provides a cross-index of deficiency items specified in Appendix D against revised sections of the LACBWR Emergency Plan.

I WP60

-1_

q

U. S. Nuclear Regulatory Commission LAC-8141 Region III Incident Response Center March 16, 1982 The revised LACBWR Emergency Plan has been reviewed and recommended for management approval by the appropriate committee in accordance with Technical Specification 6.5.1.6.

Enclosed is a copy of Form L-9 59, which should be completed and returned to LACBWR to verify your receipt of the revised plan.

Onsite Emergency Response Personnel will be trained in appropriate espects of this revision to the Emergency Plan by April 1,1982.

Offsite Emergency Support Agencies will be trained in appropriate aspects of this revision by June 1, 1982.

If there are any questions concerning this submittal, please contact us.

Very truly yours, DAIRYLAND P ' R COOPERATIVE C%

4-Frank Linder, General Manager FL:RES: abs ENCLOSURES CC:

Resident Inspectors (1)

Sheriff Geoffrey Banta Mr. John Crandall, Director Vernon Co. Sheriff's Office Iowa Disaster Services Viroqua, WI 54665 (1)

Room A-29, Herbert Hoover Bldg.

Des Moines, IA 50319 (1)

Sheriff Dennis L.

Swedberg Houston Co. Sheriff's Office Mr. John Kerr, Coordinator Box 106 Region I Caledonia, MN 55921 (1)

Division of Emergency Services State Office Building Mr. harold Denton St. Paul, MN 55100 Directorate Of fice of NRR U. S. Nuclear Regulatory Commmission Bethesda, MD 20014 (10)

Mr. Joseph LaFleur, Administrator Division of Emergency Government Hills Farm State Office Building Madison, WI 53700 (1) l l

WP60 2-t l

b

LACBWR EMERGENCY DLAN NRC APPRAISAL APPENDIX D VS. DPC/LACBWR EMERGENCY PLAN WP60

LACBWR EMERGENCY PLAN j

NRC APPRAISAL APPENDIX D VS DPC/LACBWR EMERGENCY PLAN APPENDIX D LACBWR PLAN A.1 1,11, A.3.0 A.3 Appendix 1 A.4 A.1.2.2 B.1 A.I.2, Figure A-3 B.3 A.1.2, Figure A-3 B.5

. Table A-1 B.9 Appendix 1 j

C.4 Appendix 1 D.1 E.1.2.2 D.2 E.1.1 E.1 E.2.1.5 E.2 E.2.0 E.3 E.2.3 E.4 E.2.4 i

E.6 E.2.5 E.7 E.2.7 I

l

[

WP6D

LACBWR EKERGENCY PLAN APPENDIX D LACBWR PLAN H.1 D.1.2 H.2 D.1.1.1 H.3 D.1.3 H.4 A.3.1, D.2.0 H.5 D.2.3, D.2.4, D.2.5, D.2.6 H.6 D.2.3.2 H.7 D.2.2.2 H.8 D.2.2.1, D.2.2.2 H.9 E.3.5 H.10 0.1.2.1 H.ll Appendix 3, D.2.1 thru D 2.7 H.12 E.3.9.3 1.1 E.3.1 1.2 E.3.2 1.3 E.3.3.1 1.4 E.3.4.1 1.5 E.3.5 1.6 E.3.6 1.7 E.3.9.3 1.8 E.3.2.1 1.9 E.3.9.3 WP60

LACBWR EMERGENCY PLAN

\\

APPENDIX D LACBWR PLAN J.1 E.3.11.2 J.1.d E.3.10, E.3.11.2 J.4 D.I.2.3 J.5 E.3.11.1 J.6.a,b,c Appendi x 3, D.2.2.1, ~E.3.11.4 J.7 E.2.5, E.2.6 J.10.a E.3.13 Appendix 2 Figure 2.4, 2.3 J.10.b Appendix 2 J.10.c E.2.5, E.2.6 K.3.a, K.3.b E.4.3, E.4.8 K.5.a E.4.2.1 K.5.b E.4.5.1 K.6.2 E.4.2.3, E.4.2.4, E.4.2.5 L.1 Appendix 1 L.4 Appendix 1 M.3 E.5.1 1

N.2 F.2.3.5 N.5 F.2.5, F.2.6 0.1 F.1.3 P.2 A.1.2.10, F.3.1.1, F.3.1.2 P.7 Appendix 4 P.8 Appendix 5 WP60