ML20050B823
| ML20050B823 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 03/31/1982 |
| From: | Tramm T COMMONWEALTH EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20050B824 | List: |
| References | |
| 3766N, NUDOCS 8204070455 | |
| Download: ML20050B823 (6) | |
Text
f
Commonwealth Edison
[
) ona First National Plaza. Chicagopois g l Address Reply to: Post Office Box 767 j Chicago, Illinois 60690 (D
'ss p
March 31, 1982 Cb, g
Rh0EIVED h
g
' y umb'dsweeman 'II
,APR 061982* C Mr. Harold R. Denton, Director Y.
M Of fice of Nuclear Reactor Regulation u "" "
U.S. Nuclear Regulatory Commission i
p/
Washington, DC 20555 4
s tw j'
~ '
Subject:
Byron Station Unit'ssl and 2'.
nm Braidwood Stat' ion Un'its 1 and'2
}
FSAR Amendment No. 37 NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457 h
\\
s.
3 o
Dear Mr. Denton:
~
l g-The application for cor.struction; permits and ' operating s
licenses for Byron Station Units 1 and 2, docketed Septemoer.,'20,
^
1973, are hereby amended by submittal o f Abendraent' 3'7 pursuant to 10 CFR 50.34.
3i s
Amendment No. 37 to 'the Byrori/Br'idUood FSAR consists o f a
responses to questions from the Auxiliary S] stems Branch (010 series), the Containment Systems,(022 series), the Power 5ystem Branch (040 series), the Structural Engineering Branch (130 ceries),
the Reactor Systems Branch (212 sdries), sthe C6re Performance Branch-(221 series), the Hydrologic,and Gdetechnidal Engineering (360 series), the Quality Assurance Branch (422xatid ' 4 23 series), the Accident Evaluation Branch (450 series), sand voldntary, text changes.
Also included are revised responoes to Questions 010.47, 010.50, 010.53, 022.71, 022.73, 040.12, ~ 014 0. 3 2, 040.73, 040.109, 040.143, 040.173, 110.18, 110.37, 110.61, 110./;3, 130. 6a, 2 21.2, 241.1, 3 71.11, an d 42 3.2 2.
-Que s tion s 040'.167 through 040.188 have been enumbered as 040.Id2.through 040.183 in order to match the numuering sequence originally usediby the Power. System Branch.
s Attachment A to this letter lists the questions answered in this amendment.
Attachment B lists the questions that will be answered in future amendments.
i 1
i Three (3) signed originOls and fift'y:oeven (57) copies o f this amendment are submitteif yoy r review. so;o} approval.
t.; s
,L
\\;
e s
g[
5
(
T
[ '(.
l C
,t 4, a3 oM g
$' N
b' 8204070455 820331 L
t
\\
PDR ADOCK 05000454 s
K PDR D
\\ %.,.
w 5
' t
- H. R. Denton-2-
March 31, 1982 If there are any questions concerning this matter, please
?-
contact this office.
~
(
Very truly yours,
[4 h y
"t if 3,' '
T. R.
Tramm Nuclear Licensing Administrator 4 i IA,'
- 3, sw
- s"
'SUBSCRISED and SWORN to befo e me this 3/ g day
[
of ea /l)
T982
- 0M> Abd. \\
Nota ry - Pubf.ic ~
_)
n
,s s
i 3766N s
5 k
i -..>-
i, I
i N
3 1
4 h
f k'
' y N
4 g
3
-s 4
1 s
s j-s.
s
.g
-$\\
g' hy, - s. '
,.15
+*
A p
g
.i g
44
-rW 4-t e 9
-4 ep, y
w g
e@
unei--
4e% a-ew?w e-Tw 51&
w g
w y g+My9 se-m-wg
--P ey
+
d o'ey'yh7+v U Tg 7g's yrQ
NhC Docket laos. gg-jggjgj Attachment A List of Round One and Round Two Questions Answered in Byron /Braidwood FSAR Amendment No. 37 I.
Auxiliary Systems Branch (Series 010.37-010.53)
The following question has been responded to in this amendment:
010.38 II.
Containment Systems Branch (Series 022.8-022.84)
The following questions have been responded to in this amendment:
022.8 022.61 022.9 022.63 through 022.65 022.11 through 022.24 022.67 through 022.70 022.26 022.72 022.27 022.74 022.31 through 022.49 022.75 022.51 through 022.57 022.77 022.60 022.82.through 022.84 III.
Power Systems Branch (Series 040.184-040.188)
The following questions have been responded to in this amendment:
040.184 through 040.187 IV.
Reactor Systems Branch (Series 212.153-212.159)
The following question has been responded to in this amendment:
212.155 V.
Hydrologic and Geotechnical Engineering:Dranch (Series 360.0)
The following question has beer. responded to in this amendment:
360.1 4
NRC. Docket Nos. 50-455/456 50-456/457 i
1 Attachment A (Continued) f i
VI.
Quality Assurance Branch (Series 421.0 and 423.22-423.43) i f
't t
The following questions have been responded to in this amendment:
t j
421.22 f
423.26 423.30 through 423.33 i
423.35 4
423.38 f
423.42 423.43 i
it i
i i
f i
)
i f
t t
+
- I
.i I
i 4
3 t
, - ~,
,n-
NRC Docket Nos. 50-455/456 50-456/457 Attachment B List of Round One and Round Two Questions Not Answered in Byron /Braidwood FSAR Amendment No. 37 I.
Power Systems Branch (Series 040'.0)
The following question will be answered in a future FSAR amendment:
040.188 II.
Reactor Systems Branch (Series 212.0)
The following 2 questions will be answered in future FSAR amendments:
212.154 212.157 III.
' Materials Engineering Branch (Series 251.0)
The following question will be answered in a future FSAR amendment:
251.5 IV.
Equipment Qualification Branch (Series 271.0)
The following 3 questions will be answered in a future FSAR am'endment:
271.1-271.3 V.
Chemical Engineering Branch (Series 281.0)
The following question will be answered.in a future FSAR amendment:
281.7 1
i
NRC Docket Nos.. 50-455/456 50-456/457 Attachment B (Continued)
VI.
Accident Analysis Branch (Series 311.0)
The following question will be answered in a future FSAR amendment:
311.33 VII.
Effluent Treatment Systems Branch (Series 321.0)
The following 28 questions will be answered in future FSAR amendments:
321.15-321.43
^
VIII.
Hydrologic and Geotechnical Engineering Branch (Series 362.0, 371.0)
The following 3 questions will be answered in future FSAR amendments:
362.1 362.8 371.18 9
1
-