Forwards Position on Proposed Changes to STS Informally Discussed W/Licensing Guidance Branch
ML20050B687
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/05/1982
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20050B688 List:
References
AECM-82-115, NUDOCS 8204070210
Download: ML20050B687 (2)


Text

. - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _

l

.A MISSISSIPPI POWER & LIGHT COMPANY

] Helping Build Mississippi k atatEddB P. O . B O X 164 0. J AC K S O N. MIS SISSIP PI 3 9 2 05 April 5, 1982 gl P40 CLEAR PRoOUCTION DEPARTMENT g 4 U.S. Nuclear Regulatory Commission .- g Office of Nuclear Reactor Regulation g ,.[N gaoT \

Washington, D.C. 20555  ; ,7f8 y Attention: Mr. Harold R. Denton, Director b p, e 8 4

Dear Mr. Denton:

c ,

s i _

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/15180/L-860.0 Technical Specifications AECM-82/115 The purpose of this letter is to formally transmit Mississippi Power & Light Company's position on proposed changes to the Standard Technical Specifications that have previously been discussed informally with the Licensing Guidance Branch. Additional proposed changes to the Standard Technical Specifications regarding the Corporate Safety Review Committee (Technical Specification 6.5.2) were provided in AECM-82/49, dated March 23, 1982.

These p'roposed changes are included as an attachment to this letter and include the current " Proof and Review" page with proposed changes identified; and, additional justification if required.

Please advise if additional information is required.

', Yours ruly,

- ' L. F. Dale

~-

, Manager of Nuclear Services WK/SHH/JOR:Im j

. JAttachrunt -

cc: Mr. N. L. Stampley,(w/a) Mr. G. B. Taylor (w/a)

- ,'.1r. R. V McGehee

, < '(wfa) Mr. T. B. Conner (w/a)

Mr. Richard C. DeYoung, Director (w/a) go0/

Office of lispection & Enforcement Vs U.S. Nucleaf- Regulatory Commission Washingt';n, D.C. 20555 j

_ Mr. J. P. O'Reilly, Regional Administrator

, Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission ekenion II s 101 Mzrietta St,, N.W, Suite 5100 8'204070210 82C4d5 'a 30303 '<

. DR ADOCK 05000 '- iber Middle South Utilities Systern

f ,

. . . Attachment ^1 to.AECM-82/115 Grand ' Gulf Unit 1 Technical Specification Pages 3/4 1-3 & 1-4, dated December 18, 1981 ,

y

> - [- 1) Specification 3.1.3.1,' Action a: As written, this does not allow credit, for'a fully inserted control rod.

2). Specification 3.1.3.1,' Action b.1: As written, this does not allow credit for a -fully inserted centrol rod nor is the option for.

restoring the inoperable control rod to operable allowed.

3) Specifica'ti.on 3'.1.3.1, Action b.1.b): If a rod is able to be tripped (i.s., can be scramed), but not able to be moved, it is not practical to do this test. The footnote
  • would also be deleted.
4) Specification 3.1.3.1, Action b.1: ,This is redundant to 3.1.3.1.b.2. Add the words "vitnin one hour" and delete 3.1.3.1.b.2 and Footnote **.
5) Specification 4.1.3.1.2.b: This is added teslend consistency with the above changes.