[D Commonwe;lth Ef' son
,(
) ona First N".tions! Plaza, Chicago, litinois -
\\ C7 Address Reply to: Post Office Box 767 G' Chicago, liiinois 60690 April 1, 1982 Mr. Darrell G.
Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 2D555
~
9
Subject:
LaSalle County Station Units 1 &
(?
Independent Design Review
(
g ;",^, ; '.,.,
V,\\-
NRC Docket Nos. 50-373 and 50-3 T
RPR 5 1932 Eisenhut letter to Corde 1 crems.mm_7,le/
Reference (a):
D. G.
Reed dated March 12, 1982.
'%' ' i n. -;
c>h
(/
Dear Mr. Eisenhut:
- N
The purpose of this letter is to transmit to you Common-wealth Edison's response to the NRC comments on the LaSalle County Station Independent Design Review.
Comments 2a, 3, 4, and 5 are addressed in the enclosure prepared by Teledyne Engineering Services.
Please ' note that there is no response to item 2b.
This response must wait until the comple-tion of the review.
Although a f avorable response is anticipated, any commitment at this time on the nature or extent of the response would be inappropriate.
If there are any further questions in this matter, please contact this office.
Very truly yours, 4 s / gt, C. W. Schroeder Nuclear Licensing Administrator 1m 0 #
Enclosure 30s cc:
NRC Resident Inspector - LSCS hhhK 05hoch73 3776N PDR
1PTELEDYNE ENGINEERING SERVICES 130 SELOND AVENUE W ALTMAM. MASSACHUSETTS C2254 (61D 890-3350 TWE (7101324 7580 March 23, 1982 5539-4 Mr. Brent Shelton Project Engineering Manager for LaSalle County Station Comonwealth Edison One First National Plaza Chicago, Illir,ois 60690
Subject:
Independent Design Review for LaSalle
Reference:
1)
Nuclear Regulatory Commission Docket No.
50-373/374, Letter to Mr. Cordell Reed, Commonwealth Edison, dated March 12, 1982
Dear Mr. Shelton:
Teledyne Engineering Services (TES) has reviewed the Reference 1 letter.
The responses to those comments requiring additional data or clarification from TES are as follows:
NRC Comment No. 2a - Inclusion of Design Verification Records As Part of Independent Design Review TES Response:
TES, as part of the Independent Design Review ( IDP,),
Task 4, will review the design records to assure that the adequacy of the design verification implementation is in compliance with the S&L QA Program.
l NRC Comment No. 3 - Composition and Function of the 10 CFR Part 21 Commit-tee TES Response:
Attachment A to this letter is the TES Technical Engineer-l ing Procedure (TEP) which defines the composition, duties l
and function of this committee.
Mr. Ronald Wray, Manager l
of Analysis, chairs this committee.
NRC Comment No. 4 Responsibilities and Duties of J.
Malonson and D. Messinger i
TES Response:
Normally, Messrs. Malonson and Messinger report to the Manager of Quality Assurance.
For this
- project, Mr. Malonson will act as a reviewer for Task 8, " Review of CECO Audit Finding".
He will report to the Project l
Manager.
The nature of Task 8 requires that the reviewer l
have a detailed knowledge of quality assurance.
There-l fore, it is appropriate to choose a reviewer who has a working knowledge in this area.
ENGINEERS AND METALLURGISTS I
f
"#PTELEDYNE ENGINEERING SERVICES Mr. Brent Shelton March 23, 1982 5539-4 Page Two For this project Mr. Messinger has been assigned as the Project QA Engineer in accordance with the TES QA Manual.
He reports directly to the Manager of QA and not to the Project Manager.
The TES Project QA Program (PQAP),
Appendic C of Technical Report TR-5539-1, Initial Status Report for the IDR, defines and lists the TES organization for this project.
NRC Comment No. 5 - Documentation of Detailed Reviews TES Response:
TES will submit two reports as described in Comment 5 of Reference 1.
In addition, documentation of all reviews for each task will be on file at. TES.
All data generated by the reviewers will be in the form of controlled doc-uments. The format of the documents will be as follows:
1.
TES internal memo requesting information, clarifica-tion or statement of facts.
2.
Trip reports.
3.
Memo to the Project Manager, Project Review Internal Committee, or 10 CFR Part 21 Committee, as required.
4.
Reviewer reports describing specific documents reviewed and summary t.F results.
All of the above data will be on file at TES as controlled documents.
The i
extent and nature of this documentation, along with the two reports, will i
enable one to easily assess the accuracy and depth of the IDR.
If you have any questions or require clarification, please contact the writer.
Sincerely, TELEDYNE ENGINEERING SERVICES WA c
[]JamesA.Flaherty (f Managy, Engineering Design and Testing JAF:jej cc:
D. F. Landers L. J. Diluna l
l