OPERATING DATA REPORT DOCKET NO. _50-250 DATE _Feb 15, 1982 COMPLETED BY Paul Pace.

TELEPilONE 130s) 552_-3654 OPERATING STATUS

1. Unit Name:

Turkey Point Unit No. 3 Notes

~

2. Reporting Period:

January, 1982 UniteNo. 3 remained out of 2200 service due to Steam Generator

3. Licensed Thermal Power (MWt):

Repair Program (continued

4. Nameplate Rating (Gross MWe):

760 from previoua month) 693

5. Design Electrical Raig (Net MWe):

680

^ 6. Maximum Dependable Capacity (Gross MWe):

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 (hrough 7) Since Last Report. Give Reasons:

nc

9. Power Lesel To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,If Any:

U This Month Yr to-Date Cumulative

11. Ilours In Reporting Period 744 744 80 289.6
12. Number Of flours Reactor Was Critical 55 760.I
13. Reactor Resene Shutdown flours 844.4

~

14. Ilours Generator On Line -u-53 891.0
15. Unit Resene Shutdown f(oun _0_

121.8

16. Gross Thermal Energy Generated (MWli) -109 197 555
17. Gross Electrical Energy Generated (MWH) 34 693 625

-132 F '

-1329 32 820 337

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 67.I
20. Unit Availability Factor 67.3 21. Unit Capacity Factor (Using MI)C Nett

_0_ _

63.3

22. Unit Capacity Factor (Using DER Net) 58.9 23. Unit Forced Outage Rate s.1
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
75. If Shut Down At End Of Report Period. Estimated Date of Startup:

April 1, 1982

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INiil A L CRI TICALITY INITIAL ELEC IRICITY CO\\l\\ll RCI A L OPER ATION 8204050357 820216 PDR ADOCK 05000250 Fy77)

R PDR

UNIT S!!UTDOWNS \\ND POWER REDt'CTIONS DOCKE T NO. 50-?90 UNIT N A%f E Turkey Point No. 3 DATE Feb 15. 1982 CO%iPLETED 11Y Pnni Pace REPORT \\10N TH January. 1982 TELEPilONE (305) 552-36S4

[?

'h h$

t hensee

.E t.,

Cause & Correctise N..

Da t e 5?

j{$

Esent 3?

pf Astion to 3@!

Report :

4 ~~

i:

=

J-Present Recurrence w

6 05 81-06-24 S

744.0 B

4 HB HTEXCH Unit No. 3 Steam Generator Repair Program in progress.

(Continued from previous month) i 2

3 4

F Forced Reason-MeihoJ :

Edubit G - Instructwns S. Stheduied A i quiprnent Failure (Explaint I-Manual for Preparatwn of Data B-Maintenance or Test 2 Manual Serarn.

Entry Sheets for Licensee C Refueling 1 Autoinatic Scrain-Fsent Report iLi R) file int;RfG-D-Regulatory Restriction 9-Ot her ( E xplain t 01 t.11 IJ Operator Training & lacenw I ununation F-Ad minist ra tis e b O ' "' " "

5 G-Ogrational Lrror (INplain t g.

io o us,ve,..r>

I xlut'it I - Same So:uce t8/77) li Other ( E splain )

[

AVERAGE DAILY UNIT P0hTR LEVEL DOCKET NO.

50-250 UNIT Turkey Point 3 DATE Feb 15. 198?

COMPLETEDitY Paul Pace TELEPilONE DOS) 552-3654 s

MONTH. January, 1982

[

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

-(MWe Net) 3 I.

e 2

gg 8

3 39 4

20 m

5

-~

21 6

22

~~~

7 23 8

24 9

33

' -~

10

-~~

26 gg 12 28 13 39 14 30 15 33 t

INSTRUCTIONS On S. 4 fonnar. Int the aser rge daily unit power lesel in MWe Nei for ea:h day in the reportine snonth. Compute to the nearest wh.ite r >.gawart.

(9/771

OPERATING DATA REPORT DOCKET NO. _50-251 DATE Feb 15, 1982 COMPLE1ED BY Paul Pace TELEPilONE (los) ss2-3654 OPERATING STATUS

1. Unit Name:

T'urkey Point Unit No. 4 N88'5

2. Reporting Period:

January. 1982 Turkey Point Unit No. 4 2200 opbrated at essentially full

3. Licenwd Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

power for the entire month 760

5. Design Electrical Rating (Net MWe):

'6 Maximum Dependable Capacity (Gross MWe):

ARn 646

7. Maximum Dependable Capacity (Net MWe).
8. If Changes Occur in Capacity Ratings (items Number 3 Thre.agh 7)Since last Report. Give Reasons:
9. Power Level To Which Restricted.lf Any (Net MWe):

None

10. Reasons For Restrictions,if Any:

2:

This Month Yr to Date Cumulative

11. Hours in Reporting Period 744.0 744.0 74 017
12. Number OfIlours Reactor Was Critical 744.0 _

744.0 54 723

13. Reactor Reserve Shutdown llours 166.6
14. Ilours Generator On-Line 744.0 744.0 52 828.4 15. Unit Resene Shutdown f(ours 31.2
16. Gross Thermal Energy Generated (MWH) 1 635 606 1 635 606 110 852 229
17. Gross Electrical Energy Generated (MWH) 532 520 532 520 35 254 587 507 2T5T,,,,

507 453 33 396 231

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 100.0 71.4
20. Unit Availability Factor 100.0 100.0 71.4
21. Unit Capacity Factor (Using MDC Net) 105.6 105.6 69.8 98.4 98.4 65.1
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 2.9
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each n:

I

25. IIShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status lPrior to Commercial Operation):

Forecast Achiesed INIIIA L CRITICA LI TY INITI A L ELEC TRICll Y COMMERCI A L OPER ATION Pi/77)

_m__

J 50-251 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME.*" "*Y

    • 1"'

^

4 Feb 13, 196Z DATE REPORT MONTH January, 1982 COMPLETED BY Pnni P:1ce TELEPHONE Mosi 552-3654

% w5 E

=_

e, i:

E 7 _s 4 Licensee

,n s%

Cause & Correctise N"-

Date i

5?

4 2s5 Even:

%?

5-3 Action to jsg Report =

cE 0 jL Prevent Recurrence 6.

No shutdowns or power reduction greater than 20% of average daily power level.

16 1

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparatwn of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LERI FileINUREC-D Regulatory Restriction 9-Other (Explain) 01611 E Operator Training & License Examination F-Administrative Y ~ O ' "' " ""

5 G-Operational Error (Explain) s. A o a o 4 4 6 w n.cl L xhibit 1 - Same Souiec (9/77)

II-Other ( E xplain)

AVERAGE DAILY UNITPOWER LiiVEL m

DOCKET NO.

50-251 UNIT Turkey Ibin,t_4 DATE Phrch 10, 1932 COMPLE' LED ltY Paul Pace

~1TiLEPilONE '(305) 552-3654 s

MONTil _ January 1982

~-

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

.(MWe-Net) 1 676 37 687 2

675 18 686 3

678 19 684 4

679 20 683 5

662 21 68; 6

680 22 679 7

677 23 681 8

378 681-24 9

679 25 679 10 68't 26 683

-1I 686 27 685 12 6RR 28 689 13 689 687 9

14 686 30 685 15 686 33 683 16 688 I

INSTRUCTIONS On this fonnat. Int the aver. ige daily unit power leselin MWe Net fo: ca:h day in the reportin; n.mth.

the nearest whole megawatt.

9 (9/771

~.

~

6 J

AVERAGE DAILY UNIT POWER LEVEL

'l DOCKET NO.

50-251

~

TurkeyPointE UNIT DATE F_eb 15.'1982 _

~

COMPLEH DltY Paul Pace TELEPilONE (3G5) 552-36,54 i..",.

_~

MONTH

"^"^#Y'

\\

DAY A ERACE DAILY POWER LEVEL DAY AVERAGE DAIL

'0WER LEVEL

^

(MWe-Net)

-JMWe Net)

I

'709

. ' 721-37 r

2 709x 18 720.

~

3

\\

  1. f 19 /

718 N

4 712 N

'/

.- 20 716

,k. -

5 696

\\

,/

21 715 s

\\<f' 4

6 713 22 713 s \\

23 7

710 715 p'.

's 8

711

\\

24 719 ~

s

- 9 713

/

\\

713 25

/

10 717

/

.N 26 N

717

/

.I t 719' N

27

'719 33

,722 28 722x 29 721 \\x 13 I4 720 x,

30 71o 15 720 777

-s\\

722

's 16 I

INSTRUCTIONS On this fonnai. he the aver. ige daily unit power lesel ist MWe-Net or ca:h day in the reporting in. nth. Compute t

~

the nearest whnte r >:gawart.

(T771 s

SUMARY_0F_0PERATING _ EXPERIENCE DOCKET NO.

50-250 I

UNIT Tur_ key Point Unit No. 3 DATE February 15, 1982 COMPLETED BY P. L. Pace TELEPHONE

,1305),SS2-3654 REPORT MONTH January _, 1982 Unit No a remained out of service due to Steam Generator Repair program.

Refer to " Unit shutdowns and Power Reductions" section of Novertoer 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during tne month included:

Inspections ana requirements of IE Bulletins and NUREG-U737 are continuing.

/

Florida Power & Light Company commitments for NUREG-0737 2

implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Steam Generator Repair program in progress.

i l

,". !~

_ W l_OF.,0PE_ RAT NG EX_P_ERIENCE-i DOCKET NO.

50-261 5

UNIT

, Turkey _ Point Unit No. 4 i

DATE Februa ryJ, 1982 l

COMPLETED BY P. L. Pace TELEPHONE 130 Q 552-3654 _ _ _,

4 REPORT MONTH January, 1982 Unit 4 operated at essentially full power for the entire month, f

Major Safety-related maintenance activities performed during the month included:

i I

l Inspections and requirements of IE Bul ~ etins and NUREG-0737 in i

progress.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to ccrrespondence l

between FPL' and NRC for additional information.

j i

-.