OPERATING DATA REPORT DOCKET NO. _50-250 DATE _Feb 15, 1982 COMPLETED BY Paul Pace.
TELEPilONE 130s) 552_-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point Unit No. 3 Notes
~
- 2. Reporting Period:
January, 1982 UniteNo. 3 remained out of 2200 service due to Steam Generator
- 3. Licensed Thermal Power (MWt):
Repair Program (continued
- 4. Nameplate Rating (Gross MWe):
760 from previoua month) 693
- 5. Design Electrical Raig (Net MWe):
680
^ 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 (hrough 7) Since Last Report. Give Reasons:
nc
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
U This Month Yr to-Date Cumulative
- 11. Ilours In Reporting Period 744 744 80 289.6
- 12. Number Of flours Reactor Was Critical 55 760.I
- 13. Reactor Resene Shutdown flours 844.4
~
- 14. Ilours Generator On Line -u-53 891.0
- 15. Unit Resene Shutdown f(oun _0_
121.8
- 16. Gross Thermal Energy Generated (MWli) -109 197 555
- 17. Gross Electrical Energy Generated (MWH) 34 693 625
-132 F '
-1329 32 820 337
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 67.I
- 20. Unit Availability Factor 67.3 21. Unit Capacity Factor (Using MI)C Nett
_0_ _
63.3
- 22. Unit Capacity Factor (Using DER Net) 58.9 23. Unit Forced Outage Rate s.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
- 75. If Shut Down At End Of Report Period. Estimated Date of Startup:
April 1, 1982
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INiil A L CRI TICALITY INITIAL ELEC IRICITY CO\\l\\ll RCI A L OPER ATION 8204050357 820216 PDR ADOCK 05000250 Fy77)
R PDR
UNIT S!!UTDOWNS \\ND POWER REDt'CTIONS DOCKE T NO. 50-?90 UNIT N A%f E Turkey Point No. 3 DATE Feb 15. 1982 CO%iPLETED 11Y Pnni Pace REPORT \\10N TH January. 1982 TELEPilONE (305) 552-36S4
[?
'h h$
t hensee
.E t.,
Cause & Correctise N..
Da t e 5?
j{$
Esent 3?
pf Astion to 3@!
Report :
4 ~~
i:
=
J-Present Recurrence w
6 05 81-06-24 S
744.0 B
4 HB HTEXCH Unit No. 3 Steam Generator Repair Program in progress.
(Continued from previous month) i 2
3 4
F Forced Reason-MeihoJ :
Edubit G - Instructwns S. Stheduied A i quiprnent Failure (Explaint I-Manual for Preparatwn of Data B-Maintenance or Test 2 Manual Serarn.
Entry Sheets for Licensee C Refueling 1 Autoinatic Scrain-Fsent Report iLi R) file int;RfG-D-Regulatory Restriction 9-Ot her ( E xplain t 01 t.11 IJ Operator Training & lacenw I ununation F-Ad minist ra tis e b O ' "' " "
5 G-Ogrational Lrror (INplain t g.
io o us,ve,..r>
I xlut'it I - Same So:uce t8/77) li Other ( E splain )
[
AVERAGE DAILY UNIT P0hTR LEVEL DOCKET NO.
50-250 UNIT Turkey Point 3 DATE Feb 15. 198?
COMPLETEDitY Paul Pace TELEPilONE DOS) 552-3654 s
MONTH. January, 1982
[
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
-(MWe Net) 3 I.
e 2
gg 8
3 39 4
20 m
5
-~
21 6
22
~~~
7 23 8
24 9
33
' -~
10
-~~
26 gg 12 28 13 39 14 30 15 33 t
INSTRUCTIONS On S. 4 fonnar. Int the aser rge daily unit power lesel in MWe Nei for ea:h day in the reportine snonth. Compute to the nearest wh.ite r >.gawart.
(9/771
OPERATING DATA REPORT DOCKET NO. _50-251 DATE Feb 15, 1982 COMPLE1ED BY Paul Pace TELEPilONE (los) ss2-3654 OPERATING STATUS
- 1. Unit Name:
T'urkey Point Unit No. 4 N88'5
- 2. Reporting Period:
January. 1982 Turkey Point Unit No. 4 2200 opbrated at essentially full
- 3. Licenwd Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
power for the entire month 760
- 5. Design Electrical Rating (Net MWe):
'6 Maximum Dependable Capacity (Gross MWe):
ARn 646
- 7. Maximum Dependable Capacity (Net MWe).
- 8. If Changes Occur in Capacity Ratings (items Number 3 Thre.agh 7)Since last Report. Give Reasons:
- 9. Power Level To Which Restricted.lf Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
2:
This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 744.0 744.0 74 017
- 12. Number OfIlours Reactor Was Critical 744.0 _
744.0 54 723
- 13. Reactor Reserve Shutdown llours 166.6
- 14. Ilours Generator On-Line 744.0 744.0 52 828.4 15. Unit Resene Shutdown f(ours 31.2
- 16. Gross Thermal Energy Generated (MWH) 1 635 606 1 635 606 110 852 229
- 17. Gross Electrical Energy Generated (MWH) 532 520 532 520 35 254 587 507 2T5T,,,,
507 453 33 396 231
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100.0 100.0 71.4
- 20. Unit Availability Factor 100.0 100.0 71.4
- 21. Unit Capacity Factor (Using MDC Net) 105.6 105.6 69.8 98.4 98.4 65.1
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 2.9
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each n:
I
- 25. IIShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status lPrior to Commercial Operation):
Forecast Achiesed INIIIA L CRITICA LI TY INITI A L ELEC TRICll Y COMMERCI A L OPER ATION Pi/77)
_m__
J 50-251 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME.*" "*Y
- 1"'
^
4 Feb 13, 196Z DATE REPORT MONTH January, 1982 COMPLETED BY Pnni P:1ce TELEPHONE Mosi 552-3654
% w5 E
=_
e, i:
E 7 _s 4 Licensee
,n s%
Cause & Correctise N"-
Date i
5?
4 2s5 Even:
%?
5-3 Action to jsg Report =
cE 0 jL Prevent Recurrence 6.
No shutdowns or power reduction greater than 20% of average daily power level.
16 1
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparatwn of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LERI FileINUREC-D Regulatory Restriction 9-Other (Explain) 01611 E Operator Training & License Examination F-Administrative Y ~ O ' "' " ""
5 G-Operational Error (Explain) s. A o a o 4 4 6 w n.cl L xhibit 1 - Same Souiec (9/77)
II-Other ( E xplain)
AVERAGE DAILY UNITPOWER LiiVEL m
DOCKET NO.
50-251 UNIT Turkey Ibin,t_4 DATE Phrch 10, 1932 COMPLE' LED ltY Paul Pace
~1TiLEPilONE '(305) 552-3654 s
MONTil _ January 1982
~-
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
.(MWe-Net) 1 676 37 687 2
675 18 686 3
678 19 684 4
679 20 683 5
662 21 68; 6
680 22 679 7
677 23 681 8
378 681-24 9
679 25 679 10 68't 26 683
-1I 686 27 685 12 6RR 28 689 13 689 687 9
14 686 30 685 15 686 33 683 16 688 I
INSTRUCTIONS On this fonnat. Int the aver. ige daily unit power leselin MWe Net fo: ca:h day in the reportin; n.mth.
the nearest whole megawatt.
9 (9/771
~.
~
6 J
AVERAGE DAILY UNIT POWER LEVEL
'l DOCKET NO.
50-251
~
TurkeyPointE UNIT DATE F_eb 15.'1982 _
~
COMPLEH DltY Paul Pace TELEPilONE (3G5) 552-36,54 i..",.
_~
MONTH
"^"^#Y'
\\
DAY A ERACE DAILY POWER LEVEL DAY AVERAGE DAIL
'0WER LEVEL
^
(MWe-Net)
-JMWe Net)
I
'709
. ' 721-37 r
2 709x 18 720.
~
3
\\
- f 19 /
718 N
4 712 N
'/
.- 20 716
,k. -
5 696
\\
,/
21 715 s
\\<f' 4
6 713 22 713 s \\
23 7
710 715 p'.
's 8
711
\\
24 719 ~
s
- 9 713
/
\\
713 25
/
10 717
/
.N 26 N
717
/
.I t 719' N
27
'719 33
,722 28 722x 29 721 \\x 13 I4 720 x,
30 71o 15 720 777
-s\\
722
's 16 I
INSTRUCTIONS On this fonnai. he the aver. ige daily unit power lesel ist MWe-Net or ca:h day in the reporting in. nth. Compute t
~
the nearest whnte r >:gawart.
(T771 s
SUMARY_0F_0PERATING _ EXPERIENCE DOCKET NO.
50-250 I
UNIT Tur_ key Point Unit No. 3 DATE February 15, 1982 COMPLETED BY P. L. Pace TELEPHONE
,1305),SS2-3654 REPORT MONTH January _, 1982 Unit No a remained out of service due to Steam Generator Repair program.
Refer to " Unit shutdowns and Power Reductions" section of Novertoer 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during tne month included:
Inspections ana requirements of IE Bulletins and NUREG-U737 are continuing.
/
Florida Power & Light Company commitments for NUREG-0737 2
implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Steam Generator Repair program in progress.
i l
,". !~
_ W l_OF.,0PE_ RAT NG EX_P_ERIENCE-i DOCKET NO.
50-261 5
UNIT
, Turkey _ Point Unit No. 4 i
DATE Februa ryJ, 1982 l
COMPLETED BY P. L. Pace TELEPHONE 130 Q 552-3654 _ _ _,
4 REPORT MONTH January, 1982 Unit 4 operated at essentially full power for the entire month, f
Major Safety-related maintenance activities performed during the month included:
i I
l Inspections and requirements of IE Bul ~ etins and NUREG-0737 in i
progress.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to ccrrespondence l
between FPL' and NRC for additional information.
j i
-.