JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUPf4ARY OF OPERATIONS JANUARY, 1982 There were one (1) manual shutdown and two (2) automatic shutdowns in the month of January.
The following safety-related maintenance was performed in the month of January:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced packing on one ring of #6 river water pump.
i i
i e
1 l
8204050223 820215 PDR ADOCK 05000364 R
p OPERATING DATA REPORT a
DOCKET NO. 50-364 DATE 2/01/82 COMPLETED BY W. G.
liairston TELEPilONE (205)S99 5156, III OPERATING STATUS
- 1. Unit Name: Josenh M. Fa rle v - Un i t 2 Notes 1) Cumulative data
- 2. Reporting Period:
Jar.ua ry. 1982 since 7/30/81 date of
- 3. Licensed Thermal Po.zer (MWt):
2652 c mmercial operation.
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
854.7
- 7. Masimum Dependable Capacity (Net MWe):
813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Item #6 has been changed due to evaluation of operatinz experience.
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A O
V This Month Yr.-to.Date
'Cumulatise
- 11. Hours in Reporting Period 744 744 4.465
- 12. Number Of Ilours Reactor Was Critical 719.5 719.5 4.399.?
- 13..h actor Resene Shutdown flours 24.5 24.5 65.3
- 14. Ilours Generator On-Line 677 677 4,343.5
- 15. Unit Resene Shutdown flours 0
0.
0
- 16. Gross Thennal Energy Generated (MWH) 1.707.819.2
_1.707.819.2 11.173.976.8
- 17. Gross Electrical Energy Generated (MWil) 553 400 553.000 3.624,378
- 18. Net Electrical Energy Generated (MWH) 524.248 524.248 3,444,968
- 19. Unit Senite Factor 91.0 91.0 97.3
- 20. Unit Asailability Factor 91.0 91.0 97.3
- 21. Unit Capacity Factor (Using MDC Net) 86.6 86.6 94.8
- 22. Unit Capacity Factor (Using DER Net) 85.0 85.0 93.1
- 23. Unit Forced Outage Rate 9.0 9.0 2.7
- 24. Shutdowns Scheduled Oser Nest 6 Months (T)pe. Date, and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status t Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICA LITY 5/06/81 5/08/81 INITI A L ELECTRICITY 5/24/81 5/25/81 v
COMMERCIAL OPER ATION 8/01/81 7/30/81 (9/77i
_i
r DOCKET NO. 50-164
.~
UNIT J. M.
Farley-Unit 2 dan 2/01/82 COMPLETED BY W.G. Hairston, III t
ELEPHONE (205) 899-5156 a
SIO.VTil Jantin rv _ 19R2 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (hlWe Net)
(31We-Net)
[,
821 17 767' 2
795 13 824 3
714 19 820 4'
799 2g 810 5
813 21
W6 802 6
824 n
7 815 23 785 m
('I g
803 24 787
\\'
9 788 25 817' 10 385 816
- 26 816 819 3g 7
12 297 819*
3 13 0
815
,a 14 485 30 783 IS 820 495 33 16 823 INSTRUCTIONS On this formar. list the aversge daily umt power levet in MWe Net for each d:y in the reporting month. Compute to the neare:t whole megswatt.
%g
~
(9(77) e s
e e.-.mme--e gamew
c) o n) %
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.
Farlev-Unit 2 DATE 2/01/82 REPORT MONT11 January, 1982 COMPLETED BY tat C. Hnfrston. III TELEPHONE (205) 899-5156 "i
=
m 3m S*
.2 _e ps4 Licensee g-t Eo Cause & Corrective
-u o
N.
Date g
3g jg5 Event 22 n.?
Action go 55 5
j i?. g Report =
<N C U
Present Recurrence d
001 820108 F
- 7. 0 A
3 NA HB Reactor trip due to malfunction of number 4 governor valve during governor valve testing. Steam generator oscillations caused low low SG level trip.
002 820111 F
45.0 H
3 82-004/03L-0 IA INSTRU Reactor trip due to frozen sensing lines on PT-494 and PT-496 (steam line differential pressure transmitters).
Insulation added.
003 820131 F
15.0 A
1 NA CB PUMP XX Unit shutdown due to reactor coolant pump seal leakage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: S,neduled A. Equipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Autoniatic Scram.
Esent Report (LER) File tNUREG-D. Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77) 11-01her (E xplain) l l
-