JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUPf4ARY OF OPERATIONS JANUARY, 1982 There were one (1) manual shutdown and two (2) automatic shutdowns in the month of January.

The following safety-related maintenance was performed in the month of January:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced packing on one ring of #6 river water pump.

i i

i e

1 l

8204050223 820215 PDR ADOCK 05000364 R

PDR

p OPERATING DATA REPORT a

DOCKET NO. 50-364 DATE 2/01/82 COMPLETED BY W. G.

liairston TELEPilONE (205)S99 5156, III OPERATING STATUS

1. Unit Name: Josenh M. Fa rle v - Un i t 2 Notes 1) Cumulative data
2. Reporting Period:

Jar.ua ry. 1982 since 7/30/81 date of

3. Licensed Thermal Po.zer (MWt):

2652 c mmercial operation.

4. Nameplate Rating (Gross MWe):

860

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

854.7

7. Masimum Dependable Capacity (Net MWe):

813.7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Item #6 has been changed due to evaluation of operatinz experience.

9. Power Lesel To Which Restricted. lf Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A O

V This Month Yr.-to.Date

'Cumulatise

11. Hours in Reporting Period 744 744 4.465
12. Number Of Ilours Reactor Was Critical 719.5 719.5 4.399.?
13..h actor Resene Shutdown flours 24.5 24.5 65.3
14. Ilours Generator On-Line 677 677 4,343.5
15. Unit Resene Shutdown flours 0

0.

0

16. Gross Thennal Energy Generated (MWH) 1.707.819.2

_1.707.819.2 11.173.976.8

17. Gross Electrical Energy Generated (MWil) 553 400 553.000 3.624,378
18. Net Electrical Energy Generated (MWH) 524.248 524.248 3,444,968
19. Unit Senite Factor 91.0 91.0 97.3
20. Unit Asailability Factor 91.0 91.0 97.3
21. Unit Capacity Factor (Using MDC Net) 86.6 86.6 94.8
22. Unit Capacity Factor (Using DER Net) 85.0 85.0 93.1
23. Unit Forced Outage Rate 9.0 9.0 2.7
24. Shutdowns Scheduled Oser Nest 6 Months (T)pe. Date, and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status t Prior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICA LITY 5/06/81 5/08/81 INITI A L ELECTRICITY 5/24/81 5/25/81 v

COMMERCIAL OPER ATION 8/01/81 7/30/81 (9/77i

_i

r DOCKET NO. 50-164

.~

UNIT J. M.

Farley-Unit 2 dan 2/01/82 COMPLETED BY W.G. Hairston, III t

ELEPHONE (205) 899-5156 a

SIO.VTil Jantin rv _ 19R2 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (hlWe Net)

(31We-Net)

[,

821 17 767' 2

795 13 824 3

714 19 820 4'

799 2g 810 5

813 21

W6 802 6

824 n

7 815 23 785 m

('I g

803 24 787

\\'

9 788 25 817' 10 385 816

- 26 816 819 3g 7

12 297 819*

3 13 0

815

,a 14 485 30 783 IS 820 495 33 16 823 INSTRUCTIONS On this formar. list the aversge daily umt power levet in MWe Net for each d:y in the reporting month. Compute to the neare:t whole megswatt.

%g

~

(9(77) e s

e e.-.mme--e gamew

c) o n) %

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.

Farlev-Unit 2 DATE 2/01/82 REPORT MONT11 January, 1982 COMPLETED BY tat C. Hnfrston. III TELEPHONE (205) 899-5156 "i

=

m 3m S*

.2 _e ps4 Licensee g-t Eo Cause & Corrective

-u o

N.

Date g

3g jg5 Event 22 n.?

Action go 55 5

j i?. g Report =

<N C U

Present Recurrence d

001 820108 F

7. 0 A

3 NA HB Reactor trip due to malfunction of number 4 governor valve during governor valve testing. Steam generator oscillations caused low low SG level trip.

002 820111 F

45.0 H

3 82-004/03L-0 IA INSTRU Reactor trip due to frozen sensing lines on PT-494 and PT-496 (steam line differential pressure transmitters).

Insulation added.

003 820131 F

15.0 A

1 NA CB PUMP XX Unit shutdown due to reactor coolant pump seal leakage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: S,neduled A. Equipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Autoniatic Scram.

Esent Report (LER) File tNUREG-D. Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77) 11-01her (E xplain) l l

-