Notice of Nonconformance from Insp on 820118-22
ML20050B286
Person / Time
Issue date: 03/19/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20050B284 List:
References
REF-QA-99900002 NUDOCS 8204050169
Download: ML20050B286 (2)


Text

$'Nh 4%n

~.; gF

w.,kl

- W gn NLid 3q%Mf Combustion Engineering,' Inc.

E 4%

Docket No. 99900002/82-01 k.GA 0.

NOTICE OF NONCONFORMANCE 5

@M 5.

JN:.ca:

M Based on the results of an NRC inspection conducted on January 18-22, 1982, it appears that certain of your activities were not conducted in accordance

' 4R with NRC requirements as indicated below:

Criterion V of Appendix B to 10 CFR Part 50 states:

" Activities affecting

3. '.

quality shall be prescribed by documented instructions, procedures or drawings

.p" '.&

of a type appropriate to the circumstances and shall be accomplished in r'

accordance with these instructions, procedures, or drawings.

Instructions, f

procedures, or drawings shall include appropriate quantitative or s:a qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."

%o Nonconformances with these requirements are as follows:

}$

W :t6 A.

Combustion Engineering Operation Sheet 1489, General Pellet Shop fd f.'

Inspector Instructions, Revision 3, paragraph 4.2 states in part:

W

" Check all paper work for correct boat / tray numbers..."

W

i. :R Contrary to the above, a lot of released pellets (W125) was being loaded, R.;f however a check of inspection records found duplicate boat numbers (#320)

T.'o?.

on the density in.oection records and four (4) tray numbers missing from j Y;.

the dimensional i,spection records.

These were trays 459, 460, 507,

?d S'

and 508.

7 B.

Combustion Engineering East Windsor Quality Assurance Manual Section 4, 2 -

Process Control, Revision 0, paragraph 4.5.1, states in part:

" Manufacturing Order... A Power System's Division Work Order that authorizes work to be performed in accordance with the included specifications."

Contrary to the above, work was being performed to a project QA Specifi-1 cation 14074/14174 WQC 11.1, Revision 1 which was not included in the Manufacturing Order.

Revision level 0 of this document was included in the Manufacturing Order.

C.

Combustion Engineering East Windsor Quality Assurance Manual Section 6, Nondestructive Examination, Revision 0, paragraph 6.5.3, states in part:

" Personnel Qualifications records in accordance with SNT-TC-1A(1975) shall be maintained by the Quality Control Manager."

t 8204050169 020319 E

PDR GA999 ENVC-E l

99700002 PDR l

...

  • k'

. f. ;.$..I T ;

f

. u

~. :-w

_a lM}

NA.w; P.C s?:

, v.e::

'.# 'M ;.'

J. ' L'.*%L l

.-;s?f Combustion Engineering, Inc.

,2 7:.iii.T.

h:t:5

+

.o

3. ',Q M r

Contrary to the above, a review of ten (10) Personnel Qualification On fjjf records found records issued in 1980 and 1981 stated two (2) persons had i

been qualified to SNT-TC-1A (1968) and two (2) had been qualified to h.h"k..

SNT-TC-1A(1980).