Final Deficiency Rept Re Low ESF Actuation Sys Setpoint Originally Reported on 820315.Util Will Track B&W Implementation of Corrective Action Rather than Initiate Independent Action.Also Reported Per Part 21
ML20050B228
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/18/1982
From: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, GO-1-82-0085, GO-1-82-85, NUDOCS 8204050119
Download: ML20050B228 (2)


Text

r 50 160/513 f'

Docket Nos.

4 pj,d 50 55(e) Report Washington Public Power Supply System -

P.O. Box 968 ' 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 March 18, 1972 GO-1 0085 01 19,

(%

p'\\

Nuclear Regulatory Commission p

Fth C S C

$d Region V gg jgg y 7_

1450 Maria Lane, Suite 210 E $$0fs7N!

Walnut Creek, California 94596

/

/

ta Attention:

Mr. R. H. Faulkenberry C>

TGI Chief, Reactor Construction 4

Projects Branch

Subject:

NUCLEAR PROJECTS 1 & 4 DOCKET NOS. 50-460 AND 50-513 REPORTABLE 10CFR50.55(e) CONDITION LOW ESFAS SETPOINT

Reference:

1)

Telecon ME Rodin, Supply System to PP Narbut, Region V Nuclear Regulatory Conmission dated March 15, 1982.

2)

BWUE-81-280 (2/4) RR Steinke to HC Grau B&W 10CFR Part 21 Notification In reference (1) the Supply System notified your office of a reportable deficiency under 10CFR50.55(e) and reference (2) is the Babcock and Wilcox (B&W) 10CFR Part 21 notification to United Engineers and Constructors of the same deficiency.

The Project has evaluated the deficiency associated with the Low ESFAS Setpoint as described in the B&W 10CFR Part 21 and determined that it is reportable under 10CFR50.55(e). Therefore, we have elected to report this, by means of this letter, as a 10CFR50.55(e) reportable deficiency; however, it has been concluded that the B&W 10CFR Part 21 adequately addresses the deficiency and the necessary corrective action to resolve the identified condition.

Because of the Project's concurrence with the preposed B&W corrective action, we have decided to have Supply System Project Design

  • 4 Cl aj,I' Sl'ifyy g, e204050119 e2O32e 03f[*E c

PDR ADOCK 05000460 U

S

$ 'll O PDR btlic

R. H. Faulkenberry' March 18, 1972 Low ESFAS Setpoint G0-1-82-0085 Page 2 Engineering track, through to completion, B&W's implementation of that corrective action rather than initiate independent action.

In light of that decision, this letter will also serve as our final report on the subject deficiency. Should there be any changes in the scope of the deficiency or the planned corrective action we will so notify your office.

If you have any' questions or desire further information, please advise.

D

'/

f

/

ActingProgram[ Director

' R. W. Root I

RWR:MER:lm I

cc: CR Bryant, BPA I

EW Edwards /860 V. Mani/897 A. Toth, NRC V. Stello, Director of Inspectie., NRC FDCC/899