MONTilLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of January 1982.
This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.1.c. of the Technical Specifications.
During the report period the reactor remained in the cold shutdown mode of operation.
There were no significant events associated with the operation of the Unit.
There was no significant maintenance completed during the month.
l t
t l
8204050059 820203 PDR ADOCK 05000133 R
l ppg l
l
u, AVElt AGE DAILY UNil POWLit LEVEL DOCKET NO. 50-/3.3 UNIT _ H 8 PP *3 D A TI' 1E - t
'8 L CO\\tPLETED fly bd 3MM TELEPilONE -707 -N3 -27d7
~J4coAM 19st MONT11 DAY AVER AGE DAILY POWElt LEVEL DAY AVElt AGE DAILY POWElt LEVEL (MWe Net)
(MWe Net) 1 O
O 37 2
gg 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26' II 27 12 3g I3 29 14 30 15 33 p
16 Y
l l
INSTRUCTIONS j
On this format.hst the average daily unit power leselin MWe Net for each day in the reporting anonth. Cuenpute to the nearest whole megawatt.
1
.a.-.e-s O
4
d t
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50 -/33 UNIT N AME
/4 G PP *3 DATE J e t-Ab3 I 3 8'l-COMPLETED BY PW bm REPORT MONTil TELEPJIONE 7o7/443~ 2787 C
}
dY5 Licensee E r, ja, Cause & Corrective No.
Date R
5g jj5 Event gg p
Action to U
yE 5
3@g Report mV 5
Prevent Recurrence e
v C
74-6 74070
.S 7A4 CH I
W/A Sietsmi c.
m oy,pgez.7, on, I
2 3-4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduied A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Esent Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & License Examination F-Admmistratise 5
i G Operational Error (Esplain)
Eshibiil Same Source
(')/77)
Il.Ot her (!!xplain )
e OPERATING DATA REPORT DOCKET NO 50-/33 DATE
't
~2 - e t COMPLETED itY P3 [. Ih J
TELLPilONE 7_ol 4d 3-2787 OPERATING STATUS uMo otb7-Af g LA ur h sir 3__
N"'r5
- 1. Unit Name: _
- 2. Reporting Period:
TA M M NL 2ZO
- 3. Licenwd Thermal Power (MW 1:
- 4. Nameplate Rating (Gross MweP d S~ -
- 5. Design Electrical Ratin;(Net MWe):
8 f_
- 6. Maximum Dependable Capacity (Gross MWel:
db
- 7. Maximum Dependable Capacity (Net MWe):
81
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Give Reasons:
N,
- 9. Power Leiel To Which Restricted,if Any (Net MWe):
N
- 10. Reasons For Restrictions. lf Any:
M/A i
This Month Yr..to Date Cumulatise I1. Ilours in Reporting Period 744 744
/81,/90
- 12. Number of liours Reactor was Critical O_
O 98 /7/
- 13. Reactor Revne Shutdown lloun O_
O Q
- 14. Ilours Generator On Line O
o
.j/12_.52.
- 15. Unit Reanc Shuidown liours O
o Q
- 16. Gross Thermal Energy Generated (MWil)
O o
g g/8. 4.5-4 l
- 17. Gross Electrical Energy Generated (MWill O
o
_f,1,3_7J,31
- 2. I Z.
- z. t t 4, g4/, /,3 7_
- 18. Net Electrical Energy Generated (MWil)
- 19. Unit Service Factor O
o 6 c. O Po
- 20. Unit Availability Factor O
o do. o 7o
- 21. Unit Capacity Factor IUsing MDC Net)
O Q
4 d._d Pq _
q
- 22. Unit Capacity Factor IUsing DER Net)
O o
4 3.l P.
- 23. Unit Forced Outage Rate O
O
/ 9/ R
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
a
- 25. If Shut Down At End Of Report Period. Ihtimated Date of Startup:
LNLili.T_fI. MIN ATE.
- 26. Units in Test Status (Prior to Commerci.d Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICIIY COMMERCI AL OPER A'ilON (4/771
.-