Forwards Const/Fuel Load Schedule & Progress Update for Feb 1982.Project Considered 97.4% Complete as of 820223
ML20050B152
Person / Time
Site: Zimmer
Issue date: 03/22/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8204050048
Download: ML20050B152 (6)


Text

.

i y ?.w~,ys g rm

ys v3 p;

2 en.c.2 uw_.n TIIE CINClNNATI GAS & ELECTI1IC COA 1I%NY 5 FM=MR L%:

C8 NCINN ATI OHIO 4 S201 A

s March 22, 1982 Q

\\

2 Y'

9;f RECaf;;g9

' PRIyCIM, SM nIR Esis i

apg 5082%

-12 nln mio nun S

ENN i/D ko I

U. S. Nuclear Regulatory Commissio 4

N kurr 2s Office of Inspection and Enforcement a

u Region III Glen Ellyn, Illinois 61037 NE F1h A /

Attention: James G. Keppler Regional Director

Subject:

Wm. H. Zimmer Nuclear Power Station - Clermont County, Ohio Construction / Fuel Load Schedule and Progress Update February, 1982.

Gentlemen:

Please be advised regardhg the above subject that this project is considered 97.4%

complete as of February 23, 1982.

Attached are copies of the form showing actual dates and status of various activities.

Please feel free to contact us if there are any questions or comments.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By

[" = -

E. A. BORGMANN Senior Vice President EAB:md cc: Wm. H. Lovelace W. F. Christianson, NRC Resident Inspector 8204050048 820322 h

PDR ADOCK 05000358 MAR 2 9 997 h

PDR Sftll

m f,J ACTUAL CATES & STATUS C0CKET NO. 50-353 Ba CONSTRUCTICK MILESI0".ES A';D ACTIVITIES FOR STATUS DATE KM. H. ZIMMER NUCLEAR PCWER STATION 2~'D I-J hmbers (Description & Account Nachers)

Activi ty Activity Est.

Started Cc?plete Status 0

BZ5 t'cbili ze 3-71 6-71 Coral.

O E314

_ Tenden Tunnel & Backfill IC-72 5-73 Cc cl.

O C155 Install Diesel Gererater and Oil Tank Building (1220) 5-74 9-79 Cc cl.

o 8235 Install Condensate _Uater Storane Tank (2491-3310) 6-74 10-75 Co ol.

0 8243 Install Reactor Clean-Up System Demireralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Cc cl.

0 8265 Install RHR Pumps (2425-3110) 7-75 2-78 Cc pl.

0 8270 Install PRR Heat Exchangers (2425-5210) 11-75 11-75 Cen;1.

0 82E0 Construct Radioactive Waste Facility (1260) 4-74 12-78 Cc9pl.

O R315 Install t'otor Control Centers (MCC's) and 480 Volt Unit Substation (4711-7470,7490)(4718-7470)

!?-7c 5-78 Co pl.

O C320 Install Instrumentation Air System (2652) 6-76 4-79 CC Pl.

.C 8333 Install Recirculating Piping (2641) 11-72 5-79 Cc pl.

0 8341 Instc11 Reactor Euilding Closed Cooling Water System (2573) 7-75 5-79 Cc al.

0 3353 Install HPCSn _PCS and ADS Systens (2647) 2648) & M S Relief Valves 10-75 5-79 Ccrpl.

L 0

8365 Install Standby Liquid Control System (2681) (2422) 2-76 5-79 Cc pl.

0 8370 Process Control & Logic Instrumentation Calibration (2470) 8-75 5-G2 Est.

97%

0 2400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Con;1.

9 a

O 4

i

/

/

/

p 4

--I-J NUM5ERS (Cescription & Account Nsbers)

Activity Actlvity Est.

o

.(

Started Completed Statu,.

0 8435 Install Conduit and Cable Trays (4750-7110, 7150, 7120) 7-73 5-81 Com l.

0 8410 Install 6.8KY and 4.16K'l Auxiliary Switchgear (4712) 11-75 7-79 Comp 1.

O S415 Install Cables (Instru entaticn, Control an:t Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 72701 2-76 11-81 Co pl.

l 12-81 Est.

95%

O C420 Perforn Ccnstruction Testf rg on Cables (Magner, Continuity, Etc.)

CG5E 2-75 0

8425 Install Batte-ies and Chargers (4722-7550, 7560) 4-76 2-77 Co pt.

O S435 Install Process Instruments (2650-0000) (2470-0000) 6-76 5-82 Est.

97%

0 8520 HPCS and LPCS Actuation and Partial Flow Test CG&E 5-31 4-82 Est.

50 0

8525 RCIC_ Actuation and Partial Flow Test 7-81 4-E2 Est.

3%

=

0 8530 RHR Systen Actuation and Flow Test 7-01 4-82 Est 10%

a 0

8535 Stand-by Liquid Control Systen Actuation Flow Test 10-79 3-82 Est.

4C:

=

0 85:0 Recirculation Pump Cold Flow and Vibration Test 4-01 6-82 Est.

4CI

=

O 8545 Integrated Diesel Generator Syr.checnizing Test 4-C2Est 5-82 Es t.

29t 1

0 8550 Service Water System and Closed Water Systens Test 10-73 2-82 Est.

45%

0 8555 Battery Capacity Test 11-78 10-79 Ccrpl.

0 8570 CC Inverter / Diverter Systen Test 13-30 4-82 Est.

81;

=

O 8575 Control Red Drive Hydraulic System Test 4-79 4-81 Compl.

l 0

8580 Feedsater and Condensate Systen Test (2 Elements) 10-79 3-82 Est.

75%

0 8585 Instrument Air _ Systen Test 7-79 2-81 Ccrpl.

O 6590 Fire Protection System Test 6-79 442 Est.

75%

l 0

8595 Flamability Control System (HG)12-31Est 4-82 Est.

C%

=

e I

/

/

r.;; 3 I-J im bers (Cescription & Account E-bers)

Activity Activity Es t.. ~

b Started Ccrpleted Status b

0 8510 Feactor Cuilding Vent System Test CGtE

-E0 5-31 Est.

I 72%

0 8730 5 eital.'!uclear Material License Issued CGLE 4-77 7-73 Cc cl.

0 8735 Applicant Sumbits Emergency Plan CGtE 9-75 11-77 Cc cl.

O E740 Applicant Sub,its Security Plan CGtE 9-75 5-77 Ccrol.

l 0

8745 A;clicant Submits Cuality As:urance Prcgran for Operations CGAE 9-75 t

12-77 Ccral.

7-F2 Es t.

7-E2 Est.

0%

0 8750 A;plicant's Ecview ar.d A;pretal of Test Results C0&E 0

6755 Arplicant's Preparation of Power Ascension Test Program CGIE 4-77 7-E2 Est.

250 0

8305 Install Control Room Consoles and Equipment (2475)(2471)

E-75 5-22 Est.

90 %

0 P310 4ccu ulatica of Environ.mntal Cata (One (1) or Two (2) Years)

Ccrol.

0 8220 Install and Calibrate Lclear Instrumentaticn (2474) 12-75 5-E0 Cc pl.

8-75 8-78 Cc pl.

0 8900 Install Primary Switchyard CGtE O

S305 Install Off-uas Syster.s (2685) (2462) 4-74 E-S1 Comal.

0 8240 Install Cendensate Suction Header to RCIC Systea (2642) (2534) 5-75 2-77 Cc al.

8005 6015 Prepare Site (1100) 5-71 6-71 Cc. pl.

8015 BC50 Install Reactor Building Foundation (1211) 6-73 10-73 Cgral.

E050 8200 Install Drysell and Suppression Chamber and Reactor Pressure Vessel Pedestal (2213) (2411) 10-73 5-82 Est.

9 15 5055 S225 Ccnstruct Reactor Buldir.g and Integral Structures (1210) 10-73 9-79 Ccrpl.

8050 8145 Construct Turbine / Generator Foundation (3514) 10-73 6-78 Ccrol.

l 8065 8315 Install Off-Gas Stack (2466-3610) 8-76 7-73 Compl.

l 9-73 5-76

corpl, E075 8920 Install Secondary Heat Sinks (Cooling Tcwers)(3571) 12-73 11-74 Ccepl.

8115-8120 Install Centainment Penetrations (Sleeves in Liner) (2213-3770) 4 e

k t

/

Actisity Activity Es t.

' J ?b-bars (Cescription & Accc nt Numbers) 5:3,rted Cc-ol e t e Status

  • f 6-74 10-73 Cc 1.

13 E?75 Install Service Water Intake Structures (1250) d*5 E310 Install Condenser, Turbine Generator and Fiping (Exclusive of Ccndensate and Feed.:3tcr Piping) (3531) (3511) 8-75 12-S0 Cc :1.

t

150 P235 Install Fe:d.nt:r ar d Conds.s;te '..'ater System (2623) (2534) l 1-75 5-79 Cc ;l 5-76 S-73 Corpl.

155 E**5 Install Die el Generator (2*87-5160) 7-76 1-E2 Est.

92; 1E5 E433 Install Denzell Air Cooler System (2E24) 2-75 11-77 Cc oi.

175 8120 Install Cent =inne.nt S101011:31 Shielding (2213-3750,2740,2720,2730) 2C3 Er3 Install Reactor Prcsrure vessel (On Site) (2411-5310) 11-75 1-76 Cc ?l.

9-75 12-78 Cc pl.

l

'205 E233 Install Recirculating Pump (2412-5110) 210 83?5 Instcll itiin Stem tires to MSIV 9-75 3-77 Cc pl.

l 215 F465 Install Centrol Rod Drive System (2414)(2CP4) 7-75 4-79 Ccrpl.

l

'23 C:~3 Install Reactor Interr.als (2411-5510) 10-75 4-73 Cc pl.

l 2-76 10-78 Ccm;l.

l 245 E335 Install Reactor Clean-Uo System Pipe, Fittin3s & Valves (2643-E540,6610) 270 83C0 Install RdR Pir.e, Fittires and Valves (26 5-6540) 10-75 10-78 Cc pl.

11-72 1-il Cem l.

?_75 P470 Install Cncling Water Pipes and Centrols (2621) (j5 SYS)

U-E 3'El C0~PI-

220 06
5 Install Radioactive Waste System and Radiation Monitoring Systen (2682)(26e6)(26S3)(2287)(2635) 300 S450 InstallPipingCenn$ctedtoPrimarySystemCcroonents(2640) 10-75 5-79 Ccmpl.

3-75 6-P 2 Est.

92; 305 8 75 Instill Pine Hangers and Res_traints All Systems (XXXX-6550,6450,6650,5750,2213,39101 i

313 8315 Irstall "ain Steam Pice to Turbine Stop Valve (2631) IB Pipe 4-75 5-1-77 Ccrpl.

f C0mpl.

12 - 7

6-El

450 E520 Initial Flush of Systems (XXXX,5990) l 7-78 Cccpl.

5-78 1500 8515 Perform Reactor Cold Hydrostatic Test 3-7d 7-8 2 Est.

95:

515 8CCO Complete 3ase Line Inspections CGLE

$/'

t d

f

~

2s a i,cthity Act!.1ty Est.

4 Started Corpiete Status *

  • * [!;

I-J t;f te r_s_

(Cescription & Account Mu:cers)

EECO 8700 Perform Leak Rate Test CG1E 3 '2 Est.

5 -C? Est.

C?

6-32 Est.

6-22 Est.

CY Test Fadf onctive_ _yste, and Radiation Monitoring System S

E505 2615 5-32 Est.

5-E2 Est.

c:

8703 ESC 3 Intecrated System Tes.

l 8-73 9-79 CC*Pl.

l 8720 E215 Special t;aclaar Material Celivered 7-82 Est.

7-52 Est.

05 ESSO 8950 Applicant Submits Test Pesults 7-82 Est.

Il-S2 Est.

c:

3950 8990 Pcwer Ascension 8

O I

O t