ML20050A718
| ML20050A718 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/08/1982 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20050A714 | List: |
| References | |
| NUDOCS 8204020138 | |
| Download: ML20050A718 (2) | |
Text
-
1 Wisconsin Electnc ma counur 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE. WI 53201 March 8,1982 Mr. H. R. Denton, Director ggDED -
Office of Nuclear Reactor Regulation p,
U. S. NUCLEAR REGULATORY COMMISSION mag L
Washington, D. C.
20555 7e 982h Attention:
Mr. R. A. Clark, Chief noe Operatirg Reactor Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT 3EACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of the following revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures:
Procedures 1.
EPIP 1.4, " Radiological Dose Evaluation", Revision 3, dated 3-8-82.
Miscellaneous 1.
" Table of Contencs" dated 3-8-82.
These revisions consist of page changes which should be filed in your copies of the Emergency Plan Implementing Procedures in accordar.ce with the attached instructions.
Please return the receipt form for these ten copies to:
Wis,consin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, b
s(gu
C. W. Fay Assistant Vice resident Y(h0(
Enclosures Copies to Incident Response Center, Region III (3)
@f
"^^ ^
~ 7ector(1) g l
04020138 820317 R ADOCK 05000266 p
March 8, 1982 l
POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES MANUAL The following revised procedure is attached and should be inserted into Please destroy the revision removed frca your manual.
your manual.
" Radiological Dose Evaluation", Revision 3, dated 03/08/82 EPIP 1.4, Also attache:d is a revised listing of the " Table of Centents" to be inserted into your manual.
Please destroy the old revision.
Please fill out the attached receipt form and return to Ms. F. A. Zeman at the Point Beach Nuclear Plant.
J. E. Knorr sad Attachments POINT BEACH NUCLEAR PLANT
_ EMERGENCY PLAN IMPLDiENTING PROCEDURES MANUAL _
03-08-82 EPIP 1.4 has been received by the undersigned and inserted into my manual DATE b
_