Application for Amend to Ol,Changing Tech Specs for High Density Spent Fuel Storage Rack Installation
ML20049J989
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/19/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20049J990 List:
References
TAC-48219, NUDOCS 8203290299
Download: ML20049J989 (2)


Text

?

M:lling Addr:ss Alabama Power Company 600 North 18th Street

  • Post Office Doc 2641 Birm ngham. Alaoama 35291 Telephone 205 7834081 F. L. Clayton, Jr. b

%"l'$'L%7"' Alabama Power the southern e4xttc system N

March 19, 1982 x d' b  ;;SOENEO Docket No. 50-348 21 k-

~ tAAR2619825"3h Director of Nuclear Reactor Regulation g ru;n ts::n y U.S. Nuclear Regulatory Commission g n: meg?MNE

  • ff /

Washington, D.C. 20555 Attention. Mr. S. A. Varga

()

Joseph M. Farley Nuclea r Plant - Unit 1 Spent Fuel Pool Modification Gentlemen:

Alabama Power Company plans to install high density spent fuel storage racks at the Joseph M. Farley Nuclea r Plant - Unit

1. The installation of these racks will increase the storage capacity of the spent fuel pool and thus will require a revision to the plant Technical Specifications. The proposed Technical Specification revision is enclosed (Attachment 1) along with a supporting safety evaluation (Attachment 2), which includes a response to the NRC guidance paper dated January 18, 1979.

Alabama Power Company's current schedule calls for ship-ment of the first rack module on November 1, 1982, with ship-ment of the last rack module on March 7, 1983, and all instal-lation, clean-up and check-out to be completed subsequently.

It is, therefore, requested that NRC approval be provided by Novembe r 1, 1982, prior to initiation of rack shipment.

Alabama Power Company's Plant Operations Review Committee and Nuclear Operations Review Board have reviewed and approved i

this proposed expansion of the spent fuel pool and change to Section 5.6 of the Technical Specifications and have ve ri fi ed that they do not involve an unreviewed safety question as defined by 10CFR50.59.

The class of this proposed amendment is designated as Class III according to 10CFR170.22 requirements. Encl osed is I check for $4,000.00 to cover the total amount of the fees required.

0 0\

D 8203290299 820319 6s kh PDR ADOCK 05000348 '

P PDR

Mr. S. A. Varga March 19, 1982 Director of Nuclear Reactor Regulation Page 2 U. S. Nuclear Regulatory Commission In accordance with 10CFR50.30(c)(1)(1), three signed originals and forty (40) additional copies of this proposed change are enclosed.

Should you have any questions, please advise.

You rs very truly ,

k F. L.

c "l ayton, J r. l FLCJr/ JAR:jc-D4 Enclosure cc: Mr. R. A. Thomas (w/ Enclosure)

Mr. G. F. Trowbridge ( w/ Encl os u re )

Mr. J. P. O'Reilly (w/ Enclosure)

Mr. E. A. Reeves (w/ Encl osu re)

Mr. W. H. Bradford (w/ Enclosure)

SWORN T0JND SUBSCRIBED BEf0RE ME THIS /90 DAY OF Adrn4 ,

1982.

b

0'Im/

Notary PubTic My Commission Expires:

/0, 3 7. , # 6'-