YANKEE ATOMIC NUCLEAR POWER STATION MONniLY STATISTICAL REPORT 81-9 I
FOR DIE MON 1H OF SEPTEMBER,1981 4
i -
4 1
1 f
3 I
i i
i 8203290174 811009 PDR ADOCK 05000029 l
R PDR I
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 811009 COMPLETED BY A. E. Doyle TELEPHONE 617-872-8100 X2390 OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
Ren t emh ny-tor 1
- 2. Reporting Period:
600 Power level restricted by
- 3. Licensed Thermal Power (MWt):
185 installation of baffle
- 4. Nameplate Rating (Gross MWe):
175 plates in turbine.
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capacity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
150 MWe
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
See Nntec This Month
.Yr. to Date Cumulative
- 11. Hoursin Reportin2 eric.
720.00 6.551.00 P
- 12. Number Of Hours Reactor Was Critical 71.1 ot 4.387.87 144.722.15
- 13. Reactor Resene Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On.Line 711.95 4.309.77 140,271.50
- 15. Unit Reserve Shutdown Hours 0.00 0.0n 0.00
- 16. Cross Thermal Energy Generated (MWH) 417.968.00 -
2.311.964.71 75.185.745.52
- 17. Gross Electrical Energy Generated (MWH) 106 46R 50 610.202.50 22.995,343.00
- 18. Net Electrical Energy Generated (MWH) 49.378.31 564.442.03, 21.522.551.77
- 19. Unit Service Factor 98.88 65 1 76.62
- 20. Unit Availability Factor on RR Aq,70 76.62 78.87 49.23 69.27
- 21. Unit Capacity Factor (Using MDC Net) 78.87 49.23 69.27
- 22. Unit Capacity Factor (Using DER Net) 1.12 2.20 5.29
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eschi:
f
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION (9/77) i
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rowe DATE 811009 COMPLETED BY A. E. Doyle j
617-872-8100 X2390 TELEPHONE MONTH SEPTEMBER, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER a.EVEL (MWe-Net)
(MWe Net) 143,3 37 142*3 2
143.3 13 141.7 3
141.n 39 142.2 143.2 20 142.1 4
i 5
142.9 21 142.5 142.6 22 142.4 6
7 140.1 23 142.5 122.3 3
24 142.7 9
117.8 25 169 4 l
10 142.7 26, 143.0 142.6 II 142.8 27 142.6 12 91 9 28 13 106.8 29 I43 1 136.7 34 3O 143.3 15 I4I 9 31 16 142.3 INS 1 RUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
l UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-29 UNIT NAME Yankee Rowe DATE 811009 COMPLETED llY A.
H.
Doyle REPORT Af0NTil SEPTEMBER, 1981 TELEPflONE 617-872-8100 X2390 w.
E e
.!E
} }I5 Licensee E*
ja.
Cause & Corrective No.
Date R
E8
.c 5 5 Evens
-- g Q
g Action to F
g3 E 5' jgg Report
- vO Prevent Recurrence g
~
6 5
9/8 F
29 D'
N/A N/A N/A N/A Reduced load by >20% to maintain the-Condenser Outlet Temperature within EPA limits.
6 9/12 F
8.05 H
3 N/A N/A N/A Loss of Y-177 High Line due to electrical storm.
I 2
3 4
F: Foot ed Reason:
Method:
Ealdbie G. Insieuctions S: Stheduled A Equipinent Failure (Explain) 1-Manual for Picparation of Data it. Maintenance of Test 7 Manual Scrain.
Entry Sheces for Licensee C-Rcrueling 3 Autoniatic Scrain.
Evens Itepani (LER) File INUREG.
D Hegulatiny Restriction 4 Osher (Emplain) 0161) li-Opciator Training & License Exainination F Aihniniusative 5
G Oresational I.isos (limplaio)
Exhibit I. Sanne Sonree 08/77)
Il Othes (limplain)
t DOCKET NO.
50-29 UNIT Yankee Rowe DATE 811009 COMPLETED BY A. E. Doyle TELEPHONE 617-872-8100 X2390 REPORT MONTH SEPTEMBER, 1981 SIRE!ARY OF OPERATING EXPERIENCES 9/7 At 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> a load reduction commenced in order to maintain the condenser circulating water outlet temperature within the E.P.A.
limit. The load was 149 We at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />.
9/8 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> began to recover electric load to 153 We.
At 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> reduced load to 149 We to maintain concenser outlet temper-ature. At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> the electric load was 119 We.
9/9 At 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> load increasing began. At 1945 hours0.0225 days <br />0.54 hours <br />0.00322 weeks <br />7.400725e-4 months <br /> the plant was at full load.
9/12 At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> a plant trip occurred due to the loss of the Y-177 high line resulting from a line fault which was caused by an electrical storm. At 2128 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.09704e-4 months <br />, the reactor was brought critical i
and at 2333 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.877065e-4 months <br /> the generator was phased on the line.
j 9/13 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> a 24-hour hold at 139.7 We began to allow for Xenon equilibrium.
9/14 At 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> the plant reached full load and remained there for the remainder of the month.
CORRECTED 10/1/81 OPERATING DATA REPORT l
DOCKET NO.
50-29 DATE 810911 CO.\\lPLETED BY D. Bernard TELEPHONE 617-872-8100 X2390 OPERATING STATUS
)
Notes Yankee Rowe
- 1. Unit Name.
i
- 2. Reporting Period:
Aucust. 1981 p
g g
600
- 3. Licensed Thermst Power (51Wt):
i sta11ation of baffle 185
- 4. Nameplate Rating (Cross SIWE):
plates in turbine.
175
- 5. Design Eleetries: Rsring (Net SIWE):
180
- 6. 51sximum Dependable Capacity (Cross 5fWe):
175
- 7. SIsximum Dependable Capscity (Net 31We):
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7)Since Last Report Give Reasons:
1gn MWe
- 9. Power Level To Which Restricted,!f Any (Net SIWE):
See Notes
- 10. Reasons For Restrictions.If Any:
i This 5fcnth Yr to.Dste Cumulative 744.00 5.831.00
- 11. Hours in Reporting Period 736.73 3,673.84 144,008.12
- 12. Number Of Hours Resctor Was Critical
- 13. Reactor Reserve Shutdown Hours 14, Hours Generator On.Line 727.70 3.597.82 139.559.55
- 15. Unit Reserve Shutdown Hours -n-16. Cross Thermsl Energy Generated (51WH) 399.931.00 1.893.996.71 74.767.777.52
- 17. Grcss Electrical Energy Generated (.31WH) 103,888.00 503,234.00 22.888,374.50
- 18. Net Electrical Energy Generated (51WH) 96,293.01 465,063.77 21,423,173.46 97.81 61.70 76.54
- 19. L' nit Service Factor 07 R1 61 7n 76.54
- 20. Unit Avsilability Factor 7t on 4e ea 69.23
- 21. Unit Capscity Factor (Using 51DC Net) 73.96 45.58 69.23
- 22. Unit Capacity Factor (Using DER Net) 2.19 2.41 5.31
- 23. Unit Forced Outsge Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.snd Durstion of Esch):
- 25. If Shut Down At End Of Report Period. Estimated Dste of Startup:
- 26. Units in Test Ststus (Prior to Commercial Operation):
Forecast Achie+ e I INITIAL CRITICALITY INITIA L ELECTRICITY CO3131ERCIAL OPERATION (4/77)
.