ML20049J865

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1981
ML20049J865
Person / Time
Site: Yankee Rowe
Issue date: 01/11/1982
From: Doyle A
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20049J864 List:
References
NUDOCS 8203290171
Download: ML20049J865 (5)


Text

...

i

)

5 f

4 1

1 4

.i YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-12 l

FOR THE MONTH OF DECEMBER, 1981 4

i i

e J

a S

T l

7 l

t l

i.

I

?

i 8203290171 820111 PDR ADOCK- 05000029 R

PDR

OPERATING DATA REFORT 50-29 DCCKET NO DATE H20lll COSIPLETED BY F.

novie TELEPl!ONE 61/-ni.'-81CO-X2390 OPERATING ST \\ TUS Notes Yankee Rowe

1. Urut Name:

D'n:embe r. 1 <.7 81

2. Reportin; Penod:

Power level restricted by

3. Licensed Thermal Power (.\\lWt):

600 insta11ation of baffle Ia5

4. Nameplate R2 tin;(Gross a!We):

P ates in turbine.

l 175

5. Desi;n Electrical Rating (Net 31We):

180

6. 51asimum Dependable Capacity (Gross StWe):

175

7. Slaumum Dependable Capac:ty (Net $!We):

S !f Changes Occur in Capacity Ratings (Items Number 3 lhrou;;h 7) Since Last Report.Ghe Reasons:

9. Power Lese! To Which Restricted. If Any (Net 31We):

'Rn "J>

See Notes 10 Reasons For Restnctions. !f Any:

This 51onth Yr. to Date Curnulative 744.00 8,760.00 11 11ours In Reportin Penod 744.00 6 506-7 1'*6.011

!5 12 Number Of !!aurs Reactor Was Cr:tical 13 Reactor Resene Shutdown Hours 0 00 0.00 0.00

14. Ilours Generator On-Line 744.00 6 519.7'

! !2 ' '. 9 0. ; O 15 Umt Resene Shutdown ilours 0.40 n on 0.nn

' 4 4 a ng, r_10 3.61;_1s,

'l 76 9 0 '. _ o l l. s o I t>

Gross Thermal Ener;y Generated (SIWil)

!!S 'n7 go aqs qg3

,q 93_339 7gg, 17 Gron Electrica! Ener;y Generated (M Wil) 109 ';' n' 944 0M3.99

'l 41.091.68 IS. Net E ectrical Energy Generated (S!Wil) 100.0n 74.42 76 E 19 Unit Senice Factor 100.00 74.42 76.00 20 Umt Asadabihts Factor 83.07 57

'l 60.44 21 Umt Ca;,2 city f actor (Using 51DC Net) 9 3.'17 "7

7'-

60 M 22 Umt Capacity Factor (Uung DER Net) 0.00 1. '. 7 5.21 23 Umt Forced Outa;e Rate

4 Shutdowns Schedu!cd Oser Nest 6 Stonths ( fype. Date.and Duration of Each):

h

$ !! Shut Down \\t End Of Re; ort PerioJ. Estimaird Date of Startup:

l 2 ei Umb in Test Status (Pnor to Commercial Operation).

Forecast Achiesed l

l INIT: \\ L CR!IIC \\ Ll1Y l

INITIA L ELECTRlClTY CO\\lMERCI \\L OPER \\ TION P/77)

AVERAGE DAILY UNIT POhER LEVEL DOCKET NO. 'i" "3

11 NIT f atikce Ro.r DATE 32n111 l

CON 1PLETED BY A.1:

Dovle TELEPIIONE 617-872-8100-X239 510NTII DECE"BER-1981 DAY AVERAGE DAILY PObER LEVEL DAY AVERAGE DAILY POWER LEVEL (Nibe.Neo (51We Net) 14h.H g7 145.9 2

146.H ig 145.3 3

10h 0 19 103 0 4

146.8 145.4 20 5

lah 8 21 105.3 IO" h 6

22 105 0 146.

7

,3 144.6 g

140.H 144.6 74 9

14 6. '>

25 144.6 10 l u h

~3 26 144.6 14h.0 27 144.7 g7 146.I 73 144.2 13 I I9 "

29 I '+ l+. 83 j4 145.S 30 I5 IO 3* N 31 100 2 g

14 'a I

i IN'i TR UC IlONS On thn f.irmat, hu :he nerage daily um: power lesel in \\tWe-Net for exh dn in the reporun7 month. Cinnpute to the neareu whole mcpwatt

('U77)

O UNITSilOTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-29 UNIT NAME Yankee Rowe DATE 820111 REPORT MONTil DECEMBER, 1981 COMPl ETED 1:Y A.E.

Doyle TELEPif 0NE - 617-872-8100-X2390

.$ E

.k Licensee

[cv.

Cause & Correenive No.

Date g;

3 ij

,, g &

Even

?

93 Action in H

5 j;5g Repor: #

  1. G yu Prevent Itecurrence 0

None N/A N/A N/A N/A N/A N/A N/A N/A N/A 1

1 2

3 F: Foeled Iteason:

4 Meilind:

S: Sdiednied A Eynipinent Failure (Explain) 1-Manual Extiibit C Instructions fl Maintenance of Test' for Picp. nation of Data 7 Manual Scrsin.

Entry Slicens (nr Licensee C Itefueling 3 Auturnatic Scrain.

Event Iteport (Llilt) File INUltl!G.

i D Itegulatiny Restriciiun

4. Oilier (Explain) 0161) l li Opesator Training & License !!xamination l' Adsninist Jiive G Opesational I.n.n (linplain)

(*8/17)

Il Ollies (limpl sin)

Enliileit I Same Sonice l

l

  • e 9

DOCKET NO.

50-29 UNIT Yankee Rowe DATE R?niti COMPLETED BY A.E. Dovle TELEPHONE 617-872-8100-X2390 REPORT NONTH DECEMBER, 1931 SU'-DIARY OF OPERATING EXPERIENCES 12/13/81 0001 Commence load reduction for throttle valve exercise

~

and testing of main stream non-return valves, 0240 Load at 115 MWE; commenced testing of non-return valve.

0308 Completed testing of non-retttrn valve.

0315 Commenced throttle valve exercise.

0400 Completed throttle valve exercise; bommenced load increase.

0730 Plant returned to full load.