ML20049J865
| ML20049J865 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 01/11/1982 |
| From: | Doyle A YANKEE ATOMIC ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20049J864 | List: |
| References | |
| NUDOCS 8203290171 | |
| Download: ML20049J865 (5) | |
Text
...
i
)
5 f
4 1
1 4
.i YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-12 l
FOR THE MONTH OF DECEMBER, 1981 4
i i
e J
a S
T l
7 l
- t l
i.
I
?
i 8203290171 820111 PDR ADOCK- 05000029 R
OPERATING DATA REFORT 50-29 DCCKET NO DATE H20lll COSIPLETED BY F.
novie TELEPl!ONE 61/-ni.'-81CO-X2390 OPERATING ST \\ TUS Notes Yankee Rowe
- 1. Urut Name:
D'n:embe r. 1 <.7 81
- 2. Reportin; Penod:
Power level restricted by
- 3. Licensed Thermal Power (.\\lWt):
600 insta11ation of baffle Ia5
- 4. Nameplate R2 tin;(Gross a!We):
P ates in turbine.
l 175
- 5. Desi;n Electrical Rating (Net 31We):
180
- 6. 51asimum Dependable Capacity (Gross StWe):
175
- 7. Slaumum Dependable Capac:ty (Net $!We):
S !f Changes Occur in Capacity Ratings (Items Number 3 lhrou;;h 7) Since Last Report.Ghe Reasons:
- 9. Power Lese! To Which Restricted. If Any (Net 31We):
'Rn "J>
See Notes 10 Reasons For Restnctions. !f Any:
This 51onth Yr. to Date Curnulative 744.00 8,760.00 11 11ours In Reportin Penod 744.00 6 506-7 1'*6.011
!5 12 Number Of !!aurs Reactor Was Cr:tical 13 Reactor Resene Shutdown Hours 0 00 0.00 0.00
- 14. Ilours Generator On-Line 744.00 6 519.7'
! !2 ' '. 9 0. ; O 15 Umt Resene Shutdown ilours 0.40 n on 0.nn
' 4 4 a ng, r_10 3.61;_1s,
'l 76 9 0 '. _ o l l. s o I t>
Gross Thermal Ener;y Generated (SIWil)
!!S 'n7 go aqs qg3
,q 93_339 7gg, 17 Gron Electrica! Ener;y Generated (M Wil) 109 ';' n' 944 0M3.99
'l 41.091.68 IS. Net E ectrical Energy Generated (S!Wil) 100.0n 74.42 76 E 19 Unit Senice Factor 100.00 74.42 76.00 20 Umt Asadabihts Factor 83.07 57
'l 60.44 21 Umt Ca;,2 city f actor (Using 51DC Net) 9 3.'17 "7
7'-
60 M 22 Umt Capacity Factor (Uung DER Net) 0.00 1. '. 7 5.21 23 Umt Forced Outa;e Rate
- 4 Shutdowns Schedu!cd Oser Nest 6 Stonths ( fype. Date.and Duration of Each):
h
$ !! Shut Down \\t End Of Re; ort PerioJ. Estimaird Date of Startup:
l 2 ei Umb in Test Status (Pnor to Commercial Operation).
Forecast Achiesed l
l INIT: \\ L CR!IIC \\ Ll1Y l
INITIA L ELECTRlClTY CO\\lMERCI \\L OPER \\ TION P/77)
AVERAGE DAILY UNIT POhER LEVEL DOCKET NO. 'i" "3
11 NIT f atikce Ro.r DATE 32n111 l
CON 1PLETED BY A.1:
Dovle TELEPIIONE 617-872-8100-X239 510NTII DECE"BER-1981 DAY AVERAGE DAILY PObER LEVEL DAY AVERAGE DAILY POWER LEVEL (Nibe.Neo (51We Net) 14h.H g7 145.9 2
146.H ig 145.3 3
10h 0 19 103 0 4
146.8 145.4 20 5
lah 8 21 105.3 IO" h 6
22 105 0 146.
7
,3 144.6 g
140.H 144.6 74 9
14 6. '>
25 144.6 10 l u h
~3 26 144.6 14h.0 27 144.7 g7 146.I 73 144.2 13 I I9 "
29 I '+ l+. 83 j4 145.S 30 I5 IO 3* N 31 100 2 g
14 'a I
i IN'i TR UC IlONS On thn f.irmat, hu :he nerage daily um: power lesel in \\tWe-Net for exh dn in the reporun7 month. Cinnpute to the neareu whole mcpwatt
('U77)
O UNITSilOTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT NAME Yankee Rowe DATE 820111 REPORT MONTil DECEMBER, 1981 COMPl ETED 1:Y A.E.
Doyle TELEPif 0NE - 617-872-8100-X2390
.$ E
.k Licensee
[cv.
Cause & Correenive No.
Date g;
3 ij
,, g &
Even
- ?
93 Action in H
5 j;5g Repor: #
- G yu Prevent Itecurrence 0
None N/A N/A N/A N/A N/A N/A N/A N/A N/A 1
1 2
3 F: Foeled Iteason:
4 Meilind:
S: Sdiednied A Eynipinent Failure (Explain) 1-Manual Extiibit C Instructions fl Maintenance of Test' for Picp. nation of Data 7 Manual Scrsin.
Entry Slicens (nr Licensee C Itefueling 3 Auturnatic Scrain.
Event Iteport (Llilt) File INUltl!G.
i D Itegulatiny Restriciiun
- 4. Oilier (Explain) 0161) l li Opesator Training & License !!xamination l' Adsninist Jiive G Opesational I.n.n (linplain)
(*8/17)
Il Ollies (limpl sin)
Enliileit I Same Sonice l
l
- e 9
DOCKET NO.
50-29 UNIT Yankee Rowe DATE R?niti COMPLETED BY A.E. Dovle TELEPHONE 617-872-8100-X2390 REPORT NONTH DECEMBER, 1931 SU'-DIARY OF OPERATING EXPERIENCES 12/13/81 0001 Commence load reduction for throttle valve exercise
~
and testing of main stream non-return valves, 0240 Load at 115 MWE; commenced testing of non-return valve.
0308 Completed testing of non-retttrn valve.
0315 Commenced throttle valve exercise.
0400 Completed throttle valve exercise; bommenced load increase.
0730 Plant returned to full load.