i YANKEE ATOMIC NUCLEAR POWER STATION i
MONTHLY STATISTICAL REPORT 81-11 FOR THE MONTH OF NOVEMBER,1981 t
l 9
i 8203290158 811210 PDR ADOCK 05000029 PDR R
e s
i OPERATING DATA REPORT DOCKET NO.
50-29 i
DATE 811210 COMPLETED BY A E.Doyle TELEPHONE 617-872-8100 X2390 OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
Nnvamhar 10A1 Power level restricted by
- 2. Reporting Period:
600 installation of baffle
- 3. Licensed Thermal Power (MWt):
185 plates in turbine.
- 4. Namepiste Rating (Gross MWe):
175 S. Design Electrical Rsting(Net MWe):
180
- 6. Maximum Dependsble Capacity (Gross MWe):
4 175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reascns:
150 MWe
- 9. Power Level To Which Restricted. If Any (Net MWe):
See Notes
- 10. Ressons For Restrictions.If Any:
This Month
.Yr to.Date Cumu!stive 720.00 8,016.00
- 11. Hours In Reporting Period 720.00 5.852.87 146.187.15
- 12. Number Of Hours Reactor Was Critical 0.00 0.00 0.00
- 13. Resetor Reserve Shutdown Hours 14, Hours Generator On.Line 720.00 5.774.77 141.716.50
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Therms! Energy Generated (MWH) 474.950 on 3.186.541.71 76.060.324.52 111.77R.Rn R1R 310.10 71 ??1.4so.Rn
- 17. Gross Electriesl Energy Generated (MWH) 105,529.48 776.826.97 21.734.936.66
- 18. Net Electrical Energy Generated (MWH) 100.00 72.04 76.81
- 19. Unit Service Factor 100.00 72.04 76.81
- 20. Unit Availability Factor 83.75 55.1R 69.38
- 31. Unit Capacity Factor (Using MDC Net) 83.75 55.38 69.18
- 22. Unit Capscity Factor (Using DER Net) 0.00 1.6s 5.23
- 23. Unit Forced Outage Rate
- 34. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Ststus (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)
e r
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-29 UNIT Yankee Rowe DATE 811210 COMPLETED BY A. E. Doyle TELEPHONE 617-872-8100 X239@
MONT11 NOVEMBER, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(Mwe. Net)
I 146.2 17 146.5 2
146.4 14 6. 3 18 3
146.7 19 146.7 4
147.0 20 146.6 5
147.0 21 145.2 6
146.9 146.8 22 7
147.0 23 147 1 8
139.5 147.2 24 9
147.3 25 146.8 10 147.4 26 146 7 Ii 147.3 27 146,9 12 147.3 28 146.7 13 147.4 29 146.8 14 147 1 30 146.9 15 146.8 3,
16 146.6 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.
(9/77) l i
f L
j UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNITNAnlE Yankee Ipve DATE A11710 REPORT AIONTil NOVEMBER, 1981 COhfPLETED isY A.
E. Doyle TELEPilONE 617-872-8100 X2390 F.
4 mE e
c.
c No.
Date E.
h 3hb L #"$ #
gj Cause & Corrective y
gg 0
sya g3 gg Action in vent ymg Repor: #
vi o C-E g
Psevent Recurrence 6
NONE N/A N/A N/A N/A N/A N/A N/A N/A N/A I
2 3
F: Forced Iteason:
4 Method:
S: Scheduled A Equipment Failure (Explain) 1 Manual Exhibit G Insieuctions f14taintenance or Test for Picparation of Data 2 Manual Scram.
Entry Sheces for Liecusee C Refueling 3-Aulumatic Scram.
Evens Repini(LERI Fde(NUREG.
D Regulaieny Restriction 4-Other (Explain) 0161)
E Opciator Training & License Examination F Adminisisative G Operational 1:ssor (limplain) 5
('s/17)
Il-Othes (limpl sin)
Exhihis 1 Same Source
J DOCKET NO.
50-29 UNIT Yankee Rowe DATE 811210 COMPLETED BY A. E. Doyle TELEPHONE 617-872-8100 X2390 REPORT MONTH NovvMarn_ 1981 StMIARY OF OPERATING EXPERIENCES 11/8 At 0016 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> a load reduction commenced for monthly throttle and control valve exercise.
At 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> Procedure OP-4225, " Turbine Throttle and Control Valve Surveillance Test", was completed.
At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> commenced a load increase.
At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> the plant was at full allowable power.
.8 m
- -