Requests Approval to Deviate from NRC Stated Position in NUREG-0737 Item II.F.1.3,containment high-range Radiation Monitor,Based on Procedural Control Indicated & Existing Schedule for Completing Equipment Qualification
ML20049J832
Person / Time
Site: Beaver Valley
Issue date: 03/19/1982
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8203290140
Download: ML20049J832 (2)


Text

_

V N

b?$_

M i4 m 4% woo m s.u...

Nf slWgh. Pa 15219 l' arch 19,1982 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

!!r. Steven A. Varga, Chief e Operating Reactors Branch No. L y

/ c)

Division of Licensing Washington, DC 20555 f

,j,

t A

6

Reference:

Beaver Valley Power Station, Unit No. 1 ty[0,

c..,

n(

9 M',Q Docke t No. 50-334, License No. DPR-66

~

MUREG 0737; Item II.F.1.3 q

/

w c s Centieren:

/

Your letter of December 24, 1981 requested formal notification ( __j technical deviations from your stated positions in NUREG 0737, item II.F.1.3, Con ta inment liigh-Range Radiation Monitor.

Our investigation conduc*ed at that time revealed no deviations.

Your stated position in NUREG 0737 is that the monitors shall be developed and qualified to function in an accident environment.

It has recently been brought to our attention that a deviation to your stated position will exist at the time the second refueling outage is complete and the station is ready to resume power operation. As previously identified in our submittal of

. lune 26, 1980, we are installing Victorcen equipment to satisfy this require-ment.

Victorcen has recently completed qualification testing for the equipment they are providing which has placed new design criteria on our architect /

engineer for the development of a special containment penetration / cable termin-ation detail which will not invalidate Victorcen's qualification.

The qualification of this containment penetration / cable termination is in progress with the LOCA test scheduled for completion priot to the end of the present outage.

The complete qualification test program, including post LOCA testing, will not be finished until the end of the third quarter of 1982 with the supporting documentation available by the end of 1982. With the exception of the containment penetration /

cable termination qualification, the incontainment high range radiation monitors will meet the requirements of NUREG 0737 upon completion of installation. The l

qualification is expected to be complete before the end of 1982.

To prevent a licensed operator f rom being mislead by potentially inaccurate instrurent indication during accident conditions, due to the questionable qualification status of this portion of this system, a caution note will be added to the instrument indication advising him of this deviation.

This caution note will rerain in ef fect until such time that equipment qualification has been satisfied.

O B203290140 820319

/ b PDR ADOCK 03000334 p

PDR

1 L

P, caver Valley Power Station Docket No. 50-334, I,1 cense No. DPR-66 NUREC-0737; Item II.F.1.3 Pa ge 2 liased on the procedural cont rol indicated and the existing schedule for completing the equipment qualification, we are requesting approval to deviate from your stated position.

If you have any questions concerning thin request, please contact my office.

Very truly yours, J. J. Carey Vice President, Nuclear cc:

Mr. D. A. Beckman, Resident Inspector U. S. Nuclear Regulatory Commission

!! caver Valley Pover Station Shippingport, Pn 15077 U.

S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555

,